Description:

MONROVIA ELEMENTARY SCHOOL PLAYGROUND IMPROVEMENT PLAN Current South Playground Situation Play equipment capacity for ~ 60 children Drainage problems near building ... – PowerPoint PPT presentation

Number of Views:134
Avg rating:3.0/5.0
Slides: 9
Provided by: madisonK6
Category:

less

Transcript and Presenter's Notes

Title: MONROVIA ELEMENTARY SCHOOL PLAYGROUND IMPROVEMENT PLAN


1
MONROVIA ELEMENTARY SCHOOL PLAYGROUND
IMPROVEMENT PLAN
2
Current South Playground Situation
  • Play equipment capacity for 60 children
  • Drainage problems near building
  • Major sidewalks not connected
  • Very little grass
  • Pea gravel spread everywhere
  • No shade
  • Sloped landscape on west side
  • Railroad ties need replacing
  • Wooden play structure in poor condition and needs
    replacing

3
New Playground Equipment
Project Lead Timmy Clemmons Tammy Jones
CAPACITY Up to 54 Children AGE 5-12
yrs. SIZE 32L X 37W USE ZONE 44L X
49W WEIGHT 4,827 lbs.
PLAYLAND MODEL PS3-18782 KIDSPLAY MODEL 400-01607
17 Play Events Featuring
  • Deep Rung Arch Climber
  • Chute Slide
  • Cargo Net Climber
  • Triple Rail Slide
  • Lily Pad Bridge
  • Open Spiral Slide
  • Arched Bridge
  • Wave Slide

4
Basketball and Soccer Equipment
Project Lead Brian Mellberg William Powell
5
Grade Appropriate Playground Supplies
Project Lead Quintessa Thomas
6
Pavilion
Project Lead Richard Wietlake Mike Price
  • Plan calls for a 15 x 15 foot pavilion, located
    in the center of the playground. Home Depot is
    helping build the structure as part of a
    community service project.

7
Future Playground Layout
New Sidewalk New Equipment
New B-Ball Goals Pavilion
Mulch/Juniper Soccer Goals
Fencing Grass Sod/Seed
8
Unscheduled Projects
  • Replace Railroad Ties
  • Irrigation / Sprinkler System
  • Need to identify a Project Lead
  • Specify design / zoning / system
  • Obtain quotes from MCBOE approved sources
  • Present detailed plan and request funding
  • Landscaping / Sod
  • Need to identify a Project Lead
  • Include Trees, Juniper, Mulch, Topsoil
  • Obtain quotes from MCBOE approved sources
  • Present detailed plan and request funding

Volunteers Please Contact PTA VP Volunteers