MANUFACTURING
  • OBECTIVES
  • To understand what is required to manufacture a
    new product

2
What?
  • What are the characteristics of the new or
    modified product to be manufactured?
  • What raw materials, ingredients, equipment and
    packaging are required?
  • What product and safety requirements will be
    needed based on pilot plant work?

3
How Much?
  • How much to make will depend on
  • Projects sales volume?
  • Seasonal factors
  • Raw material availability
  • Seasonal markets
  • Projected costs of manufacture (capitol and
    operating
  • Marketing and distribution
  • Return on investment

4
Where?
  • Existing plant?
  • Additional energy, water and waste treatment
    requirements and cost?
  • New Plant
  • Locations factors, taxes, and possible abatement
    incentives municipal services (availability of
    utilities) transportation networks available
    labor having required skills proximity to
    sources of raw materials and important markets
    energy (fuel sources, electricity) costs water
    and waste treatment and environmental control
    systems requirements and costs requirements for
    additional steam boilers
  • Co-Packers Contract Packers?
  • Costs of manufacture taking in the options listed
    about

5
When?
  • How long will it take to modify an existing
    plant design and construct and new plant
    develop contractual agreements with suppliers of
    raw materials, ingredients, packaging or contract
    packers, and obtain delivery install and test run
    new equipment?
  • How long will it take for the manufactured
    products to pass through the distribution chain?

6
Who?
  • Will do design and construction for modify an
    existing plant or new plant at a new location?
  • In house engineering or Architect/Engineering
    (A/E) firm?
  • Federal and state or local regulatory
    regulations? x
  • What kind of quality control/assurance laboratory
    and staff will be required?

7
How?
  • Will you meet any changes needed in the
    organization for managing the modified or new
    facility?

8
Manufacturing Plant Design and Costs
  • Most organizations will use an A E firm along
    with in-house engineering staff in design and
    construction phases. An A E firm should be
    selected on the basis of the firms experience
    gained from previous projects in the particular
    food product area
  • Quality and safety must be designed into the
    manufacturing process, taking into account the
    results of prior consumer studies, product
    quality analysis, Federal, state and local
    regulatory requirements for product safety
    (cGMPs_ environmental and occupational safety.

9
Manufacturing Plant Design and Costs (cont.)
  • A detailed review of plant design and
    construction costs is essential for compliance
    with plans and contract provisions to prevent
    cost-overruns

10
Manufacturing Plant Start-Up
  • The final plant must be given a final inspection
    to determine that all terms of the contracts have
    been met.
  • All plant operating, sanitation and maintenance
    personal must be available and trained for
    start-up and continuing operations
  • All electrical services, water, wastes and steam
    lines and cleaned-in-place (CIP) sanitation
    systems must be tested
  • A total preliminary plant sanitation inspection
    should be made before the initial plant run. The
    HACCP plan must be in place

11
Manufacturing Plant Start-Up (cont.)
  • All equipment (processing, materials handling and
    packaging) must be installed and test-operated
    individually and as a part of the total process
    in a trial manufacturing run. Any corrective
    actions must be taken before full scale
    production is started
  • If treatment is needed for process water if
    waste pretreatment is required before discharge
    to a municipal treatment system or if an
    individual waste treatment system is installed
    the operation of these units must be included in
    the plant start-up

12
Manufacturing Plant Start-Up (cont.)
  • Warehousing must be evaluated for proper
    sanitation and environmental controls including
    insect, rodent, bird and other animal control
    measures
  • Product quality and safety sampling and
    analytical systems must be in place
  • All ingredients, packaging supplies and
    sanitation supplies must be available for start-up

13
Case ExampleYeast Production
  • SEE SEPARATE FILE