FORT DRUM DESIGN/CONSTRUCTION PROGRAM 12 JANUARY 2005

Description:

FORT DRUM DESIGN/CONSTRUCTION PROGRAM 12 JANUARY 2005 FT DRUM PROGRAM COMPONENTS Future Year Defense Program (FYDP) Transformation Program ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 18
Provided by: samephilad
Category:

less

Transcript and Presenter's Notes

Title: FORT DRUM DESIGN/CONSTRUCTION PROGRAM 12 JANUARY 2005


1
FORT DRUMDESIGN/CONSTRUCTION PROGRAM 12
JANUARY 2005
2
FT DRUM PROGRAM COMPONENTS
  • Future Year Defense Program (FYDP)
  • Transformation Program
  • Congressional Adds

3
FUTURE YEAR DEFENSE PROGRAM (FYDP)
  • The FYDP officially summarizes forces and
    resources for programs developed within DOD and
    approved by the Secretary of Defense
  • The FYDP details the Armys construction
    requirements for Army installations for six years

4
TRANSFORMATION PROGRAM
  • The Armys Transformation Facilities Plan
    includes constructing Temporary Facilities
    (Modularity) with a life not to exceed 7 years to
    allow
  • Installation/ USACE to define required permanent
    facilities (Transformation)
  • Program and obtain Congressional approval for
    those Projects
  • The Plan indicates Permanent Facility award dates
    starting in FY07 and construction ending by FY 13

5
CONGRESSIONAL ADDS
  • Projects either pulled from FYDP Out Years or
    Mission Critical Projects which are inserted by
    Congressmen

6
FUTURE YEAR DEFENSE PROGRAM
  • Types of Projects/Facilities
  • 11 Barracks
  • Range projects
  • Administration Buildings
  • Maintenance Buildings
  • Readiness Facilities
  • MWR
  • Utilities
  • Revitalization (Replace/Upgrade of WWII
    Facilities)
  • Airfield/ Railroad upgrades

7
TRANSFORMATION PROGRAM
  • Types of Projects/Facilities
  • Temporary (Modularity)
  • Modular Buildings, Aircraft Hangers, Maintenance
    Facilities, and Organizational Parking.
  • Permanent (Transformation)
  • Company Headquarters
  • Battalion Headquarters
  • Brigade Headquarters
  • Barracks
  • Organizational Storage
  • Maintenance Facilities
  • Organizational Vehicle Parking
  • Dining Facilities

8
(No Transcript)
9
AIRFIELD
NORTH POST
SOUTH POST
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
PROGRAM SIZE
  • PA
  • FYDP FOUO
  • Transformation 1,072M
  • Congressional Adds 118M

14
FORT DRUM CONSTRUCTION PLACEMENT
Program Includes FYDP , Modularity and
Transformation
15
DESIGN/CONSTRUCTION PROGRAM ON GOING
  • FYDP/CONGRESSIONAL ADDS
  • CONSTRUCTION 169M
  • DESIGN 130M
  • TRANSFORMATION
  • CHARRETTES 428M
  • MODULARITY 40M

16
DESIGN/CONSTRUCTION PROGRAM FUTURE
  • FYDP FY05 to FY11 FOUO
  • CONSTRUCTION START FY05
  • CONSTRUCTION COMPLETION FY13
  • MODULARITY (TEMP) PHASE 2 3 160M
  • AVIATION
  • NORTH AND SOUTH POST
  • AWARD SPRING/SUMMER 05
  • TRANSFORMATION 963M
  • DESIGN START FY05
  • CONSTRUCTION START FY07
  • CONSTRUCTION COMPLETION FY13

17
DESIGN/CONSTRUCTION PROGRAM DESIGN PLAN
  • Designers
  • A/E
  • In House
  • Sister Districts
  • Anticipated Architect Engineer Contracts
  • 6 to 10 IDC Contracts, 10M Limit, 10 Year
    Duration - Contracts will be aligned with
    facility types
  • 3 to 6 IDC Contracts, 3M Limit, 3 Year Duration
  • - Contracts will be for support work such as
    Independent Technical Reviews and Cost Reviews