Paradigm - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Paradigm

Description:

Active Member of WITSML SIG since 2003. First WITSML application developed in conjunction with ... WITSML standard utilised with Application infrastructure ... – PowerPoint PPT presentation

Number of Views:141
Avg rating:3.0/5.0
Slides: 14
Provided by: wit9
Category:

less

Transcript and Presenter's Notes

Title: Paradigm


1
Paradigm ltWITSML/gt
  • Richard Pelling, Matthew Leah John Colclough
  • Paradigm, Aberdeen
  • POSC WITSML Seminar and Exhibition,
  • Aberdeen, 19th October 2006

2
A bit of history
  • Active Member of WITSML SIG since 2003
  • First WITSML application developed in conjunction
    with Statoil in 2003
  • Worked with ONGC and Sperry-Sun to complete one
    of the first commercial uses of WITSML 1.2

3
Where we are today
  • WITSML standard utilised with Application
    infrastructure
  • Applications able to import and export some
    WITSML data types
  • Real-time data delivered directly into epos with
    OpsLink
  • Deploying additional real-time applications
  • Real-time geosteering
  • Real-time petrophysical analysis

4
Geosteering Workflow
Geolog
Offset well properties
OpsLink (WITSML)
Real-time LWD logs
Real-time Survey Data
Geolog Geosteer
Updated Horizons
DirectorGeo
VoxelGeo
Surveys, Projections Targets, Horizons, Faults,
Uncertainty
5
Real Time Petrophysics workflow
SLB
BHI
HAL
Geolog
ltWITSML/gt
OpsLink
epos
Geolog
OpenWorks
GeoFrame
6
Set up new subscription
7
First data arrives
8
Displays refreshed and updated
9
Petrophysical processing as data arrives
10
All displays fully user-editable
11
Where we are going
  • WITSML 1.3.1 support (Q1 2007)
  • Support for more WITSML objects, including
  • mudLog
  • bhaRun
  • Centralised Real time Subscription Management
  • Integration of Real time Data into Engineering
    applications

12
The future
  • WITSML to become the rule not the exception
  • Data volumes will increase significantly
  • More and more processes will become automated
  • Technological developments will increase the data
    footprint required
  • Centralised control and monitoring of operations
    will be achieved

13
Conclusions
  • Paradigm remains committed to the development of
    the WITSML and allied standards
  • Will continue to play an active role in the
    WITSML SIG
  • Software solutions will evolve to ensure that
    Real Time data is available across all our work
    flows
Write a Comment
User Comments (0)
About PowerShow.com