Status of Implementation at RTH Tokyo - PowerPoint PPT Presentation

About This Presentation
Title:

Status of Implementation at RTH Tokyo

Description:

Status of Implementation at RTH Tokyo Doc. 2 (2) Presentation version RA II/ICM-GTS 2003 (Moscow, 8 to 10 September 2003) Contents 1. GTS facilities – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 11
Provided by: webCecsP
Learn more at: http://web.cecs.pdx.edu
Category:

less

Transcript and Presenter's Notes

Title: Status of Implementation at RTH Tokyo


1
Status of Implementation at RTH Tokyo
Doc. 2 (2) Presentation version RA II/ICM-GTS
2003 (Moscow, 8 to 10 September 2003)
Contents 1. GTS
facilities 2. GTS circuits 3. Use of the Internet
4. Collection of SHIP reports
By Hiroyuki Ichijo
2
1. GTS facilities
Main components of Operational Telecommunication
System at Kiyose operation Office
AS 64520
3
TCP/IP test environment via the Internet at JMA
headquarters
4
2. GTS circuits
Implementation status at present
5
Transport level configuration of GTS circuits at
present
6
Upgrade plans
7
Transport level configuration planned in the
stage of 2003
8
3. Use of the Internet
9
Available information of RTH Tokyo
  •   History of upgrades of GTS circuits connected
    with RTH Tokyo
  • http//www.jma.go.jp/JMA_HP/jma/jma-eng/jma-cen
    ter/rth/GTS_upgrade.html
  •    Current status of GTS circuits connected with
    RTH Tokyo
  • http//www.jma.go.jp/JMA_HP/jma/jma-eng/jma-cen
    ter/rth/RTH_current.html
  •   Routing Catalog of RTH Tokyo
  • http//ddb.kishou.go.jp/GTS_routeing/RJTD/RJTDR
    OCA.TXT
  •   Comprehensive Catalog of Meteorological
    Bulletins in the zone of responsibility of RTH
    Tokyo
  • http//ddb.kishou.go.jp/pub/BulletinCatalog/
  •   List of observing stations in Japan
  • http//ddb.kishou.go.jp/pub/ObservingStation/OB
    S_STATION.DAT

10
4. Collection of SHIP reports
Write a Comment
User Comments (0)
About PowerShow.com