LBNL Facilities Division - PowerPoint PPT Presentation

About This Presentation
Title:

LBNL Facilities Division

Description:

LBNL Facilities Division Lean Kaizen Report Out Metrics Team Team Leader: Oscar Aguayo (HR) Scribes: John Kpaka (FA Ops) Heather Pinto (FA Resources) – PowerPoint PPT presentation

Number of Views:64
Avg rating:3.0/5.0
Slides: 20
Provided by: lblGovOp
Learn more at: https://www2.lbl.gov
Category:

less

Transcript and Presenter's Notes

Title: LBNL Facilities Division


1
LBNL Facilities Division Lean Kaizen Report
Out Metrics Team Team Leader Oscar Aguayo
(HR) Scribes John Kpaka (FA Ops) Heather Pinto
(FA Resources) Team Members Jim Dahlgard (FA
Resources) Chris Peach (IT) April 23, 2010
2
Background
  • Lean Training
  • Kaizen teams formed
  • Metrics Kaizen Team charged with creating
    Facilities Division metrics
  • One year process not easy needs time

3
Problem Description
  • Facilities Division does not have clear or
    consistent performance metrics
  • If you cant measure, you cant manage

Objectives/Goals
  • Analyze Facilities Department Metrics
  • Propose final Facilities Division Metrics
  • Standardize, Implement, and Sustain Facilities
    Division Metrics

4
Analysis/Current Conditions
  • Preliminary Scorecard developed for use by all
    Departments
  • Scorecard geared for measurements at Department
    level or lower
  • Need for Dashboard that is more customer focused

5
How far would you drive without your gauges?
6
(No Transcript)
7
Proposed Metrics
Customer
Lead Time
On Time
Quality
Up Time
Customer Survey
Labor Cost per Work Order
Resources
Total Recordable Case Rate
Inventory
Turnover
8
Resources Turnover
  • Division wide
  • All terminations (voluntary and involuntary), etc.

9
Resources Total Recordable Case Rate
  • Division wide
  • Frequency of injury per 100 employees
  • Drill down by
  • Severity Indicator (e.g. avg. 400k/yr on
    injuries)
  • Days Away Restricted Time

Benchmark
10
Resources Inventory Turns
  • Stores inventory only
  • Turn ratio
  • Annualized issues
  • Inventory value

11
Resources Inventory Drill Down by Inventory
Value
  • Cash tied up in Stores inventory

12
Resources Labor Costs per Work Order
  • Operations only
  • Closed projects
  • Average cost of labor(including overtime)per
    work order
  • Labor cost CMPM
  • Total count of CMPM

13
Quality Customer Survey
  • Covers all work orders that produce a customer
    satisfaction survey
  • Average for all ratings

14
Quality Up Time
  • Measures up time for all building systems,
    including mission critical, building critical,
    and customer impact (e.g. water, elevators)
  • Not currently being tracked

Sample
15
Customer Lead Time
  • CMs only
  • Time from customer request to work complete

16
Customer Lead Time Drill Down by Supervisor
  • Closer look for root cause analysis

17
Customer On-Time
  • Covers all work orders
  • actual work complete on or before estimated
    completion date
  • Based on estimated dates in Maximo OR
  • Based on SLA agreement (e.g. Transportation 4
    days)
  • Much of this is not currently tracked
  • Need scheduling system for this

Sample
18
Metrics and Performance Management
Performance Agreement Meeting
Annual Performance Appraisal
Metrics
Monitor Performance
Regular Feedback Meetings
19
Path Forward
Write a Comment
User Comments (0)
About PowerShow.com