LCLS Undulator Diagnostics and Vacuum System Overview

Description:

LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters Overview Diagnostics Undulator Line Diagnostics RF Beam Position Monitors Beam Finder Wire Beam ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 17
Provided by: lclsApsA
Category:

less

Transcript and Presenter's Notes

Title: LCLS Undulator Diagnostics and Vacuum System Overview


1
LCLS Undulator Diagnostics and Vacuum System
Overview
  • Dean R. Walters

2
Overview
  • Diagnostics
  • Undulator Line Diagnostics
  • RF Beam Position Monitors
  • Beam Finder Wire
  • Beam Loss Monitors
  • Vacuum System
  • Undulator Vacuum Chamber
  • Bellows Module
  • Single Undulator Test

3
Overview
 
Beam Position Monitor
Beam Finger Wire
Future Diagnostics Suite
Quadrupoles
  • Fabrication plan for vacuum chamber
  • 33 production vacuum chambers 7 spares
  • 1 mock-up chamber for single undulator test
  • 1 vacuum chamber for prototype

4
Overview
Short Break
Long Break
5
Diagnostics
  • Diagnostics
  • Undulator Line Diagnostics
  • RF Beam Position Monitors
  • Beam Finder Wire
  • Beam Loss Monitors
  • Vacuum System
  • Undulator Vacuum Chamber
  • Bellows Module
  • Single Undulator Test

6
Diagnostics
  • Undulator Line Diagnostics
  • Optical Transition Radiation
  • Scanning Wire Monitor
  • Vacuum Chamber
  • ULD Team
  • Bingxing Yang
  • Jim Bailey
  • Tom Buffington
  • Pat Dombrowski

This was scheduled to be installed in the
April/May shutdown on the BTX line.
7
  • RF Beam Position Monitor
  • Cavity
  • Down Converter Electronics
  • Support

8
RF Beam Position Monitor
  • RF BPM Team
  • Bob Lill
  • Leonard Morrison
  • Randy Zabel
  • Michele Givens
  • Zek Salazar
  • The team is preparing two major test
  • The ITS Single unit test -Scheduled for
    Feb/March 2006
  • The LEUTL tunnel three unit test Scheduled for
    June 2006

9
Beam Finder Wire
  • Beam Finder Wire Team
  • Jim Bailey
  • Jim Morgan
  • Scott Doran

Test of prototype components to start in March
2006
10
Beam Loss Monitors
  • Beam Loss Monitors Team
  • Bill Berg
  • Jim Morgan
  • Scott Doran
  • Additional help from Northwestern

11
Vacuum System
  • Diagnostics
  • Undulator Line Diagnostics
  • RF Beam Position Monitors
  • Beam Finder Wire
  • Beam Loss Monitors
  • Vacuum System
  • Undulator Vacuum Chamber
  • Bellows Module
  • Single Undulator Test

12
LCLS Vacuum Chamber Assy
Vacuum Chamber Assembly
Support Assembly
  • Vacuum Chamber Team
  • Soon-Hong Lee
  • Jim Bailey
  • Tom Buffington
  • Scott Doran

X-Adjustor
Z-Adjustor
13
Manufacturing Processes
14
Vacuum Chamber Prototypes
Type 316 LN Laser Weld Specimen
  • Quotations for specialty stainless steel ( 316
    LN) are in progress
  • Adjuster-Support is on order and will arrive
    early March 2006
  • Full chamber prototype to be complete by June
    2006

15
Bellows Module
  • Bellows Module Team
  • Soon-Hong Lee
  • Jim Morgan
  • Scott Doran

1. Prototype Bellows fabricated by April 2006 2.
Bellows testing complete by June 2006
16
Single Undulator Test
  • Diagnostics
  • RF Beam Position Monitors (mock-up)
  • RF BPM Support
  • Beam Finder Wire (mock-up)
  • Beam Loss Monitors (mock-up)
  • Vacuum System
  • Undulator Vacuum Chamber
  • Chamber Support
  • Vacuum Pump
  • Chamber for the BFW-BLM Support
  • Diagnostics-Vacuum
  • SUT Team
  • Soon-Hong Lee
  • Jim Bailey
  • Jim Morgan
  • Leonard Morrison
  • Scott Doran
  • Chamber and support due 1st week March 2006
  • RF BPM due end of Feb. 2006
  • Ion pump due mid Feb. 2006
  • Materials for BFW, BFW chamber, BLM are on hand