Title: Kosovo Ministry of Transport & Communications Pristina, June 2004
1CIVIL AVIATION
- Kosovo Ministry of Transport Communications
Pristina, June 2004
2Contents of the presentation Civil Aviation
Kosovo
- Existing Situation
- Proposed projects
31. Pristina Airport
Serbia
Mitrovica
Prishtina
Peja
Gjakova
Ferizaj
Prizreni
Republic of Macedonia F.Y.R.O.M.
Albania
41. Existing situation - Location conditions -
- Location Prishtina Airport is located about 20
km south-west from Prishtina centre - The airport is both civil and military air base
- The International Security Force (KFOR) controls
and coordinates use of airspace over Kosovo - Airport is administrated and managed by UNMIK
and a civilian airport authority - It is envisioned that control of civil air
traffic will be returned to Ministry of Transport
and Communications and civilian authorities as
soon as possible
51. Existing situation - Facilities (1) -
- 2500 m x 45 m runway with elevation of 545 m
above sea level - Full parallel taxiway located to the west side of
the runway - Military air base for fighter aircraft located to
west of airport, connected to runway by two long
taxiways - Emergency control tower installed by Royal Air
Force - Passenger terminal area including passenger
terminal building with about 2000 square meters
floor area and 13.680 square meters apron
receiving 3 planes of type C ICAO code letter
61. Existing situation - Facilities (2) -
- Airport administrative building close the
passenger terminal building - Fire fighting station provided by airport
authorities - The KFOR headquarters (offices and hangar)for
airfield security and maintenance - Landsite military freight handling area next to
the car park of the passenger terminal building - Landsite fuel farm in front of the fire fighting
station.
71. Existing situation - The Master plan
Pristina Airport -
- UNMIK has commissioned Sofreavia to produce
master plan study for Prishtina Airport - The present study
- covers a development period of about 20 years,in
short (2005), medium (2010) and long term (2020) - takes into consideration IMG report dated October
1999 and ICAO report dated December 1999
82. Gjakova Airport
Serbia
Mitrovica
Prishtina
Peja
Gjakova
Ferizaj
Prizreni
Republic of Macedonia F.Y.R.O.M.
Albania
92. Existing situation - Location conditions -
- Location Gjakova Airport is situated on the
northeastern side of Gjakova, on a distance of 5
km from the city - The airport is military air base of Italian Air
Forces AMIKO - Airport is administrated and managed by Italian
Air Forces AMIKO - The airport serves KFOR and humanitarian flights
102. Existing situation - Facilities -
- 1800 m x 30 m runway with elevation of 417 m
above sea level - Parallel to the runway there is a taxiway that
links the two aprons (alpha and beta) which
serves for parking of airplanes and helicopters - The surface of apron A is 240m x 103m, and
apron B is 113m x 95m - For the moment there is a mobile control tower
from which the air traffic control is carried
out.
11PROPOSED PROJECTS FOR PRISHTINA AIRPORT
There are many project ideas for development of
the Prishtina Airport. We mention those
projects, which could be very significant for
Prishtina Airport and which were requested from
ICAO as a condition for Prishtina Airport to be
certified as civil airport.
12Presentation of proposed projects in table form
13Proposed project 1 - Construction of new
control tower -
- During war time the old control tower was
destroyed by NATO bombing - Existing emergency control tower has been
installed by the Royal Air Force and handed over
to Italian Air Forces - Implementation of a new control tower and
operation building (ATC building), including all
the required ATC / COM / MET equipments, is
planned to be carry out as soon as possible - Requested value for this project 4,320,000.00
14Proposed project 2 - Overlaying the runway -
- Cracks in many places on the runway
- Only solution new and entire runway overlay with
asphalt - Dimension of the existing runway is 2.500 m x 45
m. - Goal to increase capacity and to improve safety
of the Prishtina Airport. - Requested value for this project 5,200,000.00
15Proposed project 3 - Drainage of airport -
- Pristina Airport terrain is on land with
underground waters. - In rainy times (especially in the spring and
autumn) the runway is overflowed. - This requests urgent drainage of airport in order
to have regular and safe flights -
- Requested cost for this project 3,000,000.00
16Proposed project 4 - New ILS for runway 35 -
- In order to comply with ICAO/IFR (Instrument
Flight Rules), runway strip must be enlarged on
both sides of runway - 300 m wide runway strip is required (150 m on
both sides of runway centre line) - Existing fence shall be moved to regular distance
from runway centre line in compliance with ICAO
obstacle clearance surfaces -
- Requested value for this project 1,250,000.00
17Proposed project 5 - Construction of fire
fighting station -
- Construction of fire fighting station in
Prishtina Airport is considered to have high
safety importance - Being classified in category 6, the Prishtina
Airport must be equipped with fire fighting
station - The project will consist of vehicles, garage,
equipment, water distribution system, medical
unit etc. - Requested value for this project 3,000,000.00
18Proposed project 6 - Laws, regulation,
training -
- Ministry of Transport and Communications wants to
develop and rise Prishtina Airport to ICAO
Standards level - This requests new laws, regulations and other
instructions according to European standards. - Training of management staff and experts in other
European Countries in order to have modern,
competitive and safe airports for the future - Capacity building on civil aviation management
- Requested value for this project 1,000,000.00
19PROPOSED PROJECTS FOR GJAKOVA AIRPORT
- MTC is focused in two priorities
- To make Master Plan for Gjakova Airport
- Extension of existing runway from 1800m x 30m to
2400m x 45m
20Proposed project 1 - Master Plan of Gjakova
Airport -
- Ministry of Transport and Communications wants to
develop and rise Gjakova Airport as alternative
airport of Prishtina Airport, because of fogy
which is present in winter season in Pristina
Airport - In order to achieve this it is necessary to make
a Master Plan for development of Gjakova Airport - Requested value for this project 500,000.00
21Proposed project 2 - Extension of runway -
- Dimension of the existing runway is 1800 m x 30
m. - Only solution extension of runway up to 2400m x
45m in order to fulfill ICAO standards - Goal to have possibility to use this airport as
alternative of Prishtina Airport for civilian
flights. - Requested value for this project 4,000,000.00
22THANKS FOR YOUR KIND ATTENTIONAND WE WELCOME
YOUR RECOMMENDATIONS Xhevat RamosajHead of
Department of Railways, Civil Aviation Maritime
TransportMinistry of Transport and
CommunicationsPhone / Fax 381 38 211
167Email ltxhevat.ramosaj_at_ekosova.orggt