EnCana Weyburn System CO2 Sequestration - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

EnCana Weyburn System CO2 Sequestration

Description:

... well The flood consists of an intermittent injection of CO2 followed by water injection Injection Procedure Why SCADA Vantage Because it could handle: ... – PowerPoint PPT presentation

Number of Views:71
Avg rating:3.0/5.0
Slides: 17
Provided by: www05AbbC
Category:

less

Transcript and Presenter's Notes

Title: EnCana Weyburn System CO2 Sequestration


1
EnCana Weyburn SystemCO2 Sequestration
2
Weyburn Background
3
Weyburn Project Background
  • Field discovered in 1954
  • 360 million barrels produced with water injection
    only
  • CO2 will add 130 million barrels
  • CO2 brought in through a 300 Km pipeline from a
    coal gasification plant in Beulah ND
  • More than 700 wells in production
  • Current production 30,000 bbl/day
  • Expected production 40,000 bbl/day

4
Current project facts
  • EnCana tripled the production since CO2 injection
    started 6 years ago
  • 30,000 bbl/day reached 2 years ahead of schedule
  • Since 2000, 8 million tones of CO2 have been
    pumped underground instead of being released into
    the atmosphere
  • By the time the project wraps up 30 million tones
    will be sequestered, the equivalent of taken
    nearly 7 million cars off the road
  • More than 30 years of production have been added
    to the Weyburn field

5
Miscible flood
  • How it works
  • The miscible displacement process is more than a
    simple pressure maintenance project in that it
    involves introduction of a gas (solvent) into the
    reservoir that will mix with and completely
    dissolve the reservoir oil.
  • This allows the CO2-oil mixture to be swept to
    the producing well
  • The flood consists of an intermittent injection
    of CO2 followed by water injection

6
Injection Procedure
7
Why SCADA Vantage
  • Because it could handle
  • Well monitoring and control
  • Processing Plant
  • CO2 Compression Plant
  • Tank Farm
  • CO2 Pipeline Monitoring
  • CO2 Nomination
  • Dynamometer Cards
  • Field ESD
  • Automatic Well Test
  • Miscible Flood

8
Weyburn System Overview
ABB SCADA Vantage is used throughout the field
and facilities
9
Weyburn System Overview
  • Injection ESD
  • Miscible Flood
  • Water injection wells
  • Major Bingham pump units

10
Weyburn System Overview
  • CO2 Injection Control

11
Dynacard Plot
  • Plot multiple cards on screen (current and
    reference)
  • View/change load limits, malfunction/ pump-off
    points the points
  • Right-Click to upload/download/save data

12
CO2 Sequestration
13
Cost Breakdown in CO2 Sequestration
  • Cost
  • Capture 40-60/t CO2 avoided
  • Pipeline 0.02-0.06/t .km
  • Transportation mileage 300 km
  • Storage 5-10/t CO2
  • Break even 20 bbl

14
Weyburn Background
15
IPPC Carbon Capture Storage Report
  • Approved by IPCC in September 2005
  • Published December 2005
  • Written by over 100 authors from 30 countries ,
    all continents
  • Extensively reviewed by over 200 experts
  • Presented at UNFCCC COP-11/ Kyoto COP/MOP-1 in
    Montreal

16
Total SCADA Solution Provider