Lean Manufacturing 2 - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

Lean Manufacturing 2

Description:

Lean Building Blocks Visual Factory Ability to understand the status of a production area in 5 minutes or less by simple observation without use of computers or ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 19
Provided by: danglidew
Category:

less

Transcript and Presenter's Notes

Title: Lean Manufacturing 2


1
Lean
Manufacturing
Visual Systems
2
Lean Building Blocks
Continuous Improvement
Pull/Kanban
Quick Changeover
Quality at Source
Cellular/Flow
Batch Reduction
Plant Layout
TPM
Standardized Work
5S System
Visual Systems
POUS
Value Stream Mapping
Teams/Employee Involvement
Source The MEP Lean Network
3
Visual Factory
  • Ability to understand the status of a production
    area in 5 minutes or less by simple observation
    without use of computers or speaking to anyone.

4
5S
Method for creating and maintaining an
organized and clean workplace.
5
(No Transcript)
6
1S - Sort - Seri
Separate and Discard
7
1S - Sort - Seri
  • Identify all necessary and unnecessary items.
  • Move unnecessary items from workplace to a
    designated area or throw it out.
  • Remove all excess items from working areas work
    pieces, personal items etc.
  • Organize all remaining necessary items.
  • Designate a team to hunt down unnecessary
    items.

8
2S - Stabilize - Seiton
Set in Order Straighten Arrange and identify
for ease of use
9
2S - Stabilize - Seiton
  • Locate materials and tools at POINT- OF- USE
    (POUS).
  • Store items needed by most people in a common
    storage area.
  • Make items easily identifiable and easy to
    obtain.
  • Label all containers, totes, supplies etc.
  • Storage areas, work areas, containers should have
    floor marking and identifying labels.
  • Place Maintenance/Operator instructions close to
    the point of use.
  • Use special device (carts/shelves/racks) to
    organize tools and fixtures.
  • Performance boards daily/weekly production,
    scrap/rework rate chart.

10
2S Visual Controls
  • Label Containers, Cabinets, Supplies,
    Inventory, Machines, Tools, Scrap, Rework,..
  • Color Parts container, floor markings,
    safety, work areas, trash cans,..
  • Green Shipping, Yellow Work in process, Blue
    Storage/Trash.
  • Checkered Aisles.
  • Footprints Anything that is movable.
  • Tool Boards Shadow board, Peg board.
  • Performance Boards Hour by hour, 5S
    Measurement,
  • Standard Work visible.
  • Re-order points, Inventory levels.
  • Material Flow indicators within, into, out of
    your cell.
  • Equipment related information.
  • Documents on safety, quality,

11
3S - Shine - Seiso
Clean up Scrub
12
3S - Shine - Seiso
  • Use dust collecting devices to prevent possible
    dirt.
  • Ensure that electrical and other cords are not a
    hindrance to all personnel.
  • Operators should clean their work area and
    equipment and perform preventive maintenance.
  • Keep everything clean for constant state of
    readiness.

A Clean Workplace enhances QUALITY, SAFETY, and
PRIDE.
13
4S - Standardize - Seiketsu
Keep Clean
14
4S - Standardize - Seiketsu
  • Implement a plan to keep the workplace clean all
    the time
  • No unnecessary items, mess, dirt
  • Who?
  • When?
  • How?

15
5S Schedule
16
5S - Sustain - Shitsuke
Motivate
17
5S - Sustain - Shitsuke
  • Commitment
  • Adherence
  • Cell meets 5S principles at the end of each shift
  • 5S Daily Checklist

18
5 Minute 5S
Write a Comment
User Comments (0)
About PowerShow.com