John Hay High - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

John Hay High

Description:

... Hay s Early College program moved from Cleveland State University for this academic year. ... college courses at CSU, CASE, Tri-C, or Baldwin Wallace. ... – PowerPoint PPT presentation

Number of Views:136
Avg rating:3.0/5.0
Slides: 17
Provided by: earthdayc
Category:

less

Transcript and Presenter's Notes

Title: John Hay High


1
John Hay High
Three Schools Within a School
Science Medicine
Architecture Design
Early College
2
Our School
  • John Hay High School is 75 years old. It  was
    originally built for 1,100 students. It closed in
    July 2003 to undergo 36 million in renovations,
    and is now a model school that the district hopes
    will attract top students from the region.   
  • The school is now considered a green building
    and is fully equipped for learning in the 21st
    century

3
Early College
  • John Hays Early College program moved from
    Cleveland State University for this academic
    year. It Is a  "small school" within a big
    school.
  • Early College has a curriculum designed to
    accelerate students from grades 9-12 in three
    years. Students have the opportunity to take
    college courses at CSU, CASE, Tri-C, or Baldwin
    Wallace.

4
Architecture and Design
  • The Cleveland School of Architecture and Design
    at John Hay is a highly competitive four year,
    rigorous, public, college preparatory program
    focused on the fields of commercial and applied
    arts.
  • Students have the ability to partner with
    Cleveland Museum of Art and Cleveland Institute
    of Art while taking advanced course work.
  • There are rigorous academic requirements. Once
    accepted, students must maintain at least a 3.0
    grade point average, 95 attendance rate and full
    compliance with behavior and dress codes to
    remain in the school.

5
Science Medicine
  • The Cleveland School of Science and Medicine at
    John Hay High School is a highly competitive
    four-year, rigorous, public college preparatory
    program focused on the fields of science and
    medicine. Students have the unique opportunity
    to engage in advanced coursework both on the
    school campus and at Case Western Reserve
    University, and benefit from the schools
    partnerships with world-renowned institutions in
    the University Circle neighborhood and with major
    local health care organizations.

6
Green Campus Project
The Green Campus Project is an on going effort to
further increase the environmental efficiency of
John Hay and ultimately the community.
The space between John Hay our neighbor school
the School Of the Arts will be merged and the
street between them will be eliminated to form
one large green space. The green space will
eventually be developed into an athletic area.
7
Green Campus continued
Indoor Courtyard Our school library opens to an
enclosed courtyard. The environmental club plans
to liven the courtyard by adding plants,
fountains and other décor.
John Hay will have a solar panel installed in
July 2007 with participation from the community.
This is a partnership with The Legacy Schools
Project.
8
Green Campus continued
Skylights in the third floor dining hall
Some features of our buildings re-design
include low flow fixtures in bathrooms, motion
sensitive room lighting, energy efficient
windows, and skylights in the third floor dining
hall that allow natural light to enter without
excessive heat buildup.
Our building has an Energy Star rating of 91.
This means it ranks in the top ten percent of all
schools in the United States.
9
Paper Recycling Project
Recently John Hay began a school wide recycling
program. After receiving a large bin from
Abitibi-Consolidated, every classroom began to
recycle paper products which include newspapers,
magazines, phonebooks and others.
10

Dike 14

11

Where is Dike 14 Located?
  • Dike 14 is located along the shoreline of Lake
    Erie in Cleveland.

12

Information about Dike 14
  • Is home to many animals like coyote, deer, fox,
    mink, rabbits, raccoon), and reptiles.
  • There are also many different species of
    vegetation like trees, shrubs, wildflowers, and
    grasses.
  • The location of Dike 14 is ideal for migrating
    birds it is a great resting spot.
  • For this reason, almost 300 different species of
    birds have been spotted at Dike 14!

13

How was it created?
  • The Cuyahoga river has been an important part of
    Clevelands industrial structure.
  • The steel industry expanded along the banks of
    the river in The Flats. Large iron ore
    freighters need to get to the mills.
  • In order to make the river easier to navigate,
    the United States Army Corps of Engineers
    regularly removes sediments from the bottom of
    the riverbed.
  • These materials are deposited in Contained
    Disposal Facilities (CDFs)
  • In this process, oil and other harmful chemicals
    were collected in the soil.

14
  • Dike 14 is not yet open to the public because
    there are different toxins in the soil. It is
    still being tested.

15

Our Plan for the Sample Garden
  • We are going to plant an estimated 10ft. by 20ft
    sample garden.
  • The Port Authority is one of the project
    sponsors.
  • We plan to start the project in April.

Approximate location of the sample garden
16
The End
  • Clap Now
  • Yayy US!!
Write a Comment
User Comments (0)
About PowerShow.com