Production Facilities - PowerPoint PPT Presentation

1 / 23
About This Presentation
Title:

Production Facilities

Description:

This is the footer This is the footer * * * * * * * * * * * Production Facilities * Martifer was established on 21st February 1990, and still maitains its head office ... – PowerPoint PPT presentation

Number of Views:91
Avg rating:3.0/5.0
Slides: 24
Provided by: danasRsup
Category:

less

Transcript and Presenter's Notes

Title: Production Facilities


1
(No Transcript)
2
Production Facilities
Martifer was established on 21st February 1990,
and still maitains its head office in the
industrial zone of Oliveira de Frades, Portugal,
where is located the main factory of Steel
Structures with 30.000 m2. The factory is
supplying the Portuguese, Spanish, Western Europe
and North African Market.
MARTIFER CONSTRUÇÕES Oliveira de Frades
Portugal
MARTIFER BENAVENTE Benavente Portugal
During the first quarter of 2002, it began the
construction of a new plant in Benavente,
Portugal. The main goal of this was to engage in
the construction of the new EURO 2004 football
stadiums and to supply the Spanish market at the
time. The area occupied by this factory has a
total value of 24.000 m2.
2
3
Production Facilities
Located in Gliwice, Poland, the production unit
of Martifer started operating in August 2004.
This unit has a nominal annual capacity of
10.000 tons of steel structure and is possible to
per-form shot blasting, painting and coating. It
is equipped with state of the art CNC cut and
dril-ling equipment for plates and profiles, as
well as cutting and bending of thin plate in the
fini-shing sector.
MARTIFER POLSKA Gliwice Polska
In the summer of 2008 it started production the
unit of Martifer Constructii in Calarasi,
Romania. This facility comprehends 25.000 m2 of
industrial pavilions with an installed capacity
of 10.000 tons/year.
MARTIFER CONSTRUCTII Calarasi Romania
4
Production Facilities
MARTIFER CONSTRUÇÕES Luanda Angola
AREA OF PRODUCTION
12 000 M2
Start Production
September - 2009
N. Workers
160
Production Capacity 1st Year
150 ton/Week
Projected to supply the Central and South African
market the factory will start production in
September 2009 equipped with a line for cutting
and drilling profiles, oxicut machine with
plasma, guillotine, plate bending machine, plate
drilling machine and automatic shoot blasting
chamber.
4
5
International Projects Experience
6
PROJECT EXPERIENCE
  • DRAGÃO STADIUM . Oporto

2800 tons of steel in the roof 1000 tons of
steel for support of production. 42.000sqm
application of polycarbonate. Assembly 7 months
7
Dragão Stadium Oporto
Martifer Construction
2800 tons of steel in the roof 1000 tons of
steel for support of production. 42.000sqm
application of polycarbonate.Assembly 7 months
8
PROJECT EXPERIENCE
  • BENFICA STADIUM . Lisbon

The structure is composed by 4 tube arcs with
2000x40mm, main trusses with girders and tubular
sections, struts/ties that connect the tubes and
trusses, that sustain the roof purlins. Assembly
8 months
9
Benfica Stadium Lisbon
Martifer Construction
The structure is composed by 4 tube arcs with
2000x40mm, main trusses with girders and tubular
sections, struts/ties that connect the tubes and
trusses, that sustain the roof purlins. Assembly
8 months
10
PROJECT EXPERIENCE
  • ALVALADE STADIUM . Lisbon

Roof constituted by a three-dimensional truss
sustained on 16 ties connected to 4 masts. The
main girders are perpendicular to the interior
ring and are sustained on it. Assembly 8
months.

11
Alvalade Stadium Lisbon
Martifer Construction Martifer Inox
Roof constituted by a three-dimensional truss
sustained on 16 ties connected to 4 masts. The
main girders are perpendicular to the interior
ring and are sustained on it. Assembly 8 months.
12
CAJA MAGICA Spain
Martifer Construction
Steel coverage 4.250 Ton divided by three
stadiums The stadium has a movable coverage.
13
CAJA MAGICA Spain
Martifer Construction
Steel coverage 4.250 Ton divided by three
stadiums The stadium has a movable coverage.
14
ASSEMBLY PROCEDURES
15
BUSINESS MEETING
LEISURE CENTER LAS ARENAS
Restructuring of an ancient bull Square In a
Shopping Centre

Location Spain Barcelona / Spain Square
Weight Of Steel Structure Construction 2.000Ton
16
BUSINESS MEETING
LEISURE CENTER LAS ARENAS
Plateia Assembly Procedure

Phase II Elevação Plateia Plateia Erection
Phase I Pré Montagem Plateia Plateia
Pré-Assembly
17
BUSINESS MEETING
LEISURE CENTER LAS ARENAS
Caracteristics and Conditionings
  • Caracteristics
  • Plateia120 Ton
  • Diameter 25 m
  • Erection Hight 30 m

  • Conditionings
  • Limited Space
  • The existent Cranes in building site has a
    restricted Capacity

18
BUSINESS MEETING
LEISURE CENTER LAS ARENAS
3
2
Plateia Pré Assembly
1
Assembly Erection Tower
2
Erection (Erection Mechanism)
3
1
19
BUSINESS MEETING
LEISURE CENTER LAS ARENAS
Plateia Pré Assembly
1
Assembly Erection Tower
2
Erection (Erection Mechanism)
3
20
BUSINESS MEETING
LEISURE CENTER LAS ARENAS
Plateia Pré Assembly
1
Assembly Erection Tower
2
Erection (Erection Mechanism)
3
21
BUSINESS MEETING
LEISURE CENTER LAS ARENAS
Plateia Pré Assembly
1
Assembly Erection Tower
2
Erection (Erection Mechanism)
3
22
BUSINESS MEETING
LEISURE CENTER LAS ARENAS
Erection
23
BUSINESS MEETING
LEISURE CENTER LAS ARENAS
Other Works
Plateia
Disco
Columns
Write a Comment
User Comments (0)
About PowerShow.com