Title: BRENTWOOD OVERVIEW


1
Hamilton Township, NJ Processing
Distribution Center Response to
Anthrax April 10, 2003
2
October 18, 2001
  • Trenton facility closed
  • Actions begun to secure the area and begin
    sanitization of the entire facility
  • Engaged experts from various agencies for
    expertise in decontaminating the facility

3
Time
  • Unofficial Motto Do it Right, Not Fast
  • We are not bound by time constraints
  • We will not re-open Trenton until decontamination
    process results proven successful by the experts

4
Challenges
  • Anthrax spores aerosolized to maximize damage
  • Finer and travel quickly
  • 5.8 million cubic feet of space to decontaminate
    in Trenton
  • Hart Senate office building only about 100,000
    cubic feet
  • Curseen-Morris facility in Washington, DC about
    14.2 million cubic feet

5
Plan Strategy
  • Stabilize Area
  • Secure Facility
  • Remove Contaminated Material
  • Sanitize Facility
  • Re-Inspect Facility
  • Re-Open Once Proven Safe

6
Process
  • Clean all surfaces and equipment with approved
    cleaning solution
  • Seal all openings in building with thermal foam
  • Including all cracks, vents, truck bays and
    skylights
  • Adjust and maintain environment at 75 F and 75
    relative humidity for best results
  • Use existing HVAC system and delivery system to
    pump in chlorine dioxide gas (ClO2)
  • Maintain 750 ppm concentration for 12 hours
  • Sample to ensure safety
  • Ventilate completely before re-opening

7
Phase I
  • Pre-Decontamination
  • Seal the facility
  • Reach agreements with contractors
  • Construct the ClO2 delivery system
  • Secure the necessary permits
  • Conduct required tests
  • Hold community meetings

8
Phase II
  • Decontamination
  • Maintain appropriate building temperature (75F)
    and humidity (75 relative humidity)
  • Deliver the ClO2 gas
  • Collect environmental and characterization
    samples
  • Ventilate the building

9
Phase III
  • Post-Decontamination
  • Send samples to labs for testing
  • Obtain results
  • Breakdown ClO2 delivery system
  • Service mail sorting equipment
  • Building maintenance and refurbishment

10
Chlorine Dioxide
  • ClO2 will be converted to gaseous form once it
    enters the building
  • ClO2 is visible yellow/green color you can see
    it and smell it
  • ClO2 dissipates quickly in sunlight and open areas

11
Monitoring
  • Stationary air monitors will be placed around
    buildings perimeter and inside the facility
  • Test strips will be placed throughout the
    building before the decontamination process
    begins
  • All environmental samples must return a negative
    before Trenton re-opens for business

12
Process Successful in DC
  • Extensive testing of over 5,000 environmental
    samples showed no growth of anthrax
  • Refurbishing crews will enter soon to get
    facility ready for re-occupancy this summer
  • Trenton community and leadership can rest assured
    theyre benefiting from a process proven
    successful twice already

13
Same Process, Same Team
  • The same firms that worked with USPS Engineering
    to successfully decontaminate the Washington
    facility have been contracted to perform the same
    work at the Trenton plant
  • Shaw Environmental Infrastructure
  • Sabre Technologies
  • Ashland Inc.

14
Partnerships
  • Environmental, health and safety experts applying
    their knowledge and best practices to this
    unprecedented incident
  • US Air Force
  • US Army
  • AFRRI
  • ERT
  • Local DOH
  • USPS
  • EPA
  • OSHA
  • OSTP
  • NIOSH

15
Next Steps in Trenton
  • Complex fumigation and delivery systems being
    cleaned and dismantled in Washington
  • Project engineers currently evaluating equipment
    needed for Trenton and what will be transported
  • Installation of equipment will begin following
    its arrival

16
Next Steps in Trenton
  • Decontamination plans have been in development
    for over a year, now facing implementation phase
  • No exact start date yet, but expected to fumigate
    by the end of 2003
  • USPS will work with federal, state and local
    officials to minimize impact to community and
    surrounding neighborhood

17
Gas Distribution System - South Dock
18
Gas Distribution System - North Dock
19
Sealing the Building
20
Control Zone
Sealed Warm Zone Transfer Passage
Decontamination Area
21
Storage Tanks and CLO2 Generation Equipment
22
CLO2 Distribution System
23
Interior View of Distribution System