Travel Demand Air Quality Model - PowerPoint PPT Presentation

1 / 28
About This Presentation
Title:

Travel Demand Air Quality Model

Description:

Auto modes : Drive alone, Shareride2, Shareride3 ... transfer / walking), travel cost (auto operating cost, parking cost and transit fare) ... – PowerPoint PPT presentation

Number of Views:42
Avg rating:3.0/5.0
Slides: 29
Provided by: cts7
Category:
Tags: air | auto | demand | model | quality | travel

less

Transcript and Presenter's Notes

Title: Travel Demand Air Quality Model


1
Travel Demand / Air Quality Model
2
Travel Demand And Air Quality Model Flowchart
3
Model Area
  • Include OKI and MVRPC Regions
  • 1,608 zones in OKI Region
  • 817 zones in MVRPC Region
  • 63 external stations in OKI Region
  • 43 external stations in MVRPC Region

4
Zone Map
5
Trip Purposes
  • Home-based work (HBW)
  • Home-based university (HBU)
  • Home-based other (HBO)
  • Home-based school transit (HBSC)
  • Truck
  • External-internal (EI)
  • External-external (EE)

6
Trip Generation
  • Cross Classification Models (HBW, HBU, HBO, HBSC,
    NHB)
  • Regression Equations (EI)
  • Trip Tables (EE, Truck)
  • Daily Trips

7
Trip Distribution
  • Gravity Models
  • Peak and Off-Peak Models for HBW, HBU, HBO, NHB
  • Daily model for EI
  • Growth Factoring Models for HBSC, TRUCK, EE

8
Modal Choice
  • Nested logit Models for HBW, HBU, HBO, NHB
  • Peak and Off-Peak Models
  • Modes
  • Auto modes Drive alone, Shareride2, Shareride3
  • Transit modes Walk to local bus, Walk to
    express bus, Walk to urban rail, Walk to commuter
    rail, Drive to local bus, Drive to express bus,
    Drive to urban rail and Drive to commuter rail

9
Modal Choice Nesting Structure
10
Transportation Mode Utility
  • Utility is a function of in-vehicle time
    (driving/riding), out-vehicle time (waiting /
    transfer / walking), travel cost (auto operating
    cost, parking cost and transit fare)

11
Market Segmentation
  • For HBW
  • 0 car, cars lt workers, carsworkers, cars gt
    worker
  • For HBO
  • 0 car, 1 car, 2 cars, 3 and 3 cars

12
Highway Assignment
  • Equilibrium assignment procedure
  • Travel time and travel cost
  • Roadway capacity
  • Assign Drive Alone, Shareride2, Shareride3,
    Single unit truck, Multiple unit truck separately
  • Assign trips by 4 time periods

13
Transit Assignment
  • All or nothing assignment procedure
  • Riding time, waiting time, access time (walk or
    driving)
  • Assign sub-mode trips separately
  • Assign peak and off-peak trips separately

14
Emission Calculation Flow Chart
15
VMT Distribution Calculation
16
VMT Distribution Calculation
17
Explanation of Variables
18
Explanation of Variables
19
Speed-Volume Relationship Equations
20
Emission Factor and Emission Calculation
21
FreeFlow Speed Calculation
22
FreeFlow Speed Calculation
23
FreeFlow Speed Calculation
24
Explanation of Variables
25
Classified FreeFlow Speeds
26
Classified FreeFlow Speeds
27
Classified Roadway Capacities
28
Classified Roadway Capacities
Write a Comment
User Comments (0)
About PowerShow.com