Vacuum Pressure Calculations Vaccalc The program vaccalc was used for all calculations. The program required three pieces of information for each chamber: pumping ... – PowerPoint PPT presentation

Number of Views:56
Avg rating:3.0/5.0
Slides: 32
Provided by: SLAC
Category:

less

Transcript and Presenter's Notes

Title: Vacuum Pressure Calculations


1
Vacuum Pressure Calculations
2
Vaccalc
  • The program vaccalc was used for all
    calculations.
  • The program required three pieces of information
    for each chamber pumping, conductance, and
    outgassing.
  • Using the given information, the program
    calculates the pressure at any point along the
    entire tube.

3
Chamber Design
3
69.33 m
HER downstream
LER downstream
4
plot
plot
Q5 NEG
ST plot
1
2
Support chamber
Q5 NEG
plot
plot
5
6
LER upstream
HER upstream
66.114 m
4
Assumptions
  • Bertollinis numbers on outgassing were true.
  • 2000 (l/s)/m pumping for all NEG pumps with B or
    C screens.
  • 1000 (l/s)/m pumping for all NEG pumps with A or
    D screens
  • 1000 (l/s)/m pumping for all ion pumps (150 l/s
    pump over 0.15 m)

5
Data
  • Conductance remains a constant throughout the LER
    tubes.
  • Lengths were taken from drawings and tables.
  • This is a work in progress, making it difficult
    to draw final conclusions from the plots.

6
Cases
  • Baseline Design
  • No Radial Pumps
  • No C Pumps
  • No Upstream Q4 Pump
  • No Q4 pump with Ion pump
  • LER Q5 not pumping
  • LER Q5 outgassing
  • No Q4 pump with Ion pump and frangible pump
  • LER Q5 not pumping with Frangible Link Pump
  • LER Q5 outgassing with Frangible Link Pump
  • No C Pumps
  • Q4 and Q5 outgassing
  • No Q4 and Q5 outgassing

7
Baseline Design (Support Tube)
8
Upstream HER
9
Upstream LER
10
Downstream HER
11
Downstream LER
12
No radial pumps
13
No C Pumps Upstream (support tube)
14
Upstream LER
15
No Upstream Q4 Pump (support tube)
16
Upstream LER
17
No Q4 pump with ion pump
18
Q5 not pumping
19
Q5 Outgassing
20
No Q4 pump with ion and frangible pump
21
Q5 not pumping with Frangible Link Pump
22
Q5 outgassing with Frangible Link Pump
23
No C Pumps Upstream (support tube)
24
Upstream LER
25
Q4 and HER Q5 outgassing (support tube)
26
Upstream HER
27
Upstream LER
28
No Q4 and HER Q5 outgassing (support tube)
29
Upstream HER
30
Upstream LER
31
Next Steps
  • Test other possible combinations
  • Finish the HER
  • Upstream
  • Downstream
  • Recalculate outgassing numbers
  • Check pump speed numbers
  • screen conductances
Write a Comment