Title: FY 2006 Budget Roll Out February 7, 2005
1FY 2006 Budget Roll OutFebruary 7, 2005
2We Are Guided By the Presidents Direction
- Budget maintains resolute focus on exploration
priorities and critical milestones, informed by
our science priorities - First Step Return Shuttle to flight and complete
Space Station assembly - Flagship Program Project Constellation (maintain
2008 CEV flight demo) - Technology Base Critical exploration
technologies - Transforming Technologies Project Prometheus
(flight demo in a decade) - Robotic Precursors Lunar beginning in 2008
added Mars in 2011 - Shuttle Transition ISS Cargo/Crew Services,
near-term commercial service - Scientific Breakthroughs Exploration of the
solar system and Universe (e.g., Webb in 2011)
and the search for earth like planets
3We Are Guided By The Presidents Direction
(Continued)
- Budget supports critical National needs and
revolutionary technologies - Aeronautics Protects Aviation Safety Security
and Airspace Systems, and restructures Vehicle
Systems to focus on technology breakthroughs and
near-term demonstrations - Climate Change Invest in next generation earth
observing satellites - Education Continues to inspire the next
generation of explorers with priority programs
(e.g., Explorer schools, scholarship for service)
4Supported by a Solid Budget
( in millions) 2005 2006 2007 2008 2009 2010
Science, Aero Exploration 8,912 9,661 10,550 11,215 12,210 12,796
Science Exploration Systems Aeronautics Research Education 5,364 2,568 813 166 5,476 3,165 852 167 5,960 3,707 728 155 6,503 3,826 731 155 6,853 4,474 728 155 6,798 5,125 718 155
Exploration Capabilities 6,704 6,763 6,379 6,057 5,367 5,194
Space Operations 6,704 6,763 6,379 6,057 5,367 5,194
Inspector General 27 32 34 35 35 37
Unrequested Items 426
TOTAL -- annual increases Emergency Hurricane Supplemental 16,070 126 16,456 2.4 16,962 3.1 17,306 2.0 17,612 1.8 18,027 2.4
FY 2005 budget is shown in new budget structure
for comparison purposes, and allocation by
Mission Directorate does not include 426m in
unrequested items to allow a direct comparison of
content included in the Presidents request.
5Building on Our Scientific Successes
( in millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010
SCIENCE 5,476 5,960 6,503 6,853 6,798
Space System Exploration The Universe Earth-Sun System 1,900 1,512 2,064 2,348 1,532 2,081 2,832 1,539 2,132 2,999 1,495 2,359 3,066 1,407 2,325
- The FY06 budget request for Science Mission
Directorate includes - FY06 budget will support 55 missions in orbit, 26
in development, and 34 in design phase - 858m, a 17 increase, for Mars/Lunar robotic
exploration - 372m, a 19 increase, to maintain Webb telescope
on pace for 2011 launch - 93m in development funds for Hubble to extend
scientific productivity and initiate a robotic
mission to safely deorbit the telescope - 218m, a 17 increase, to maintain competitive
efforts for Explorer Program - 56m, a 33 increase, for Beyond Einstein program
to study the universe - 234m, a 16 increase, for studying the sun in
Living With a Star - 136m, a 26 increase, for competitive
opportunities in Earth System Science Pathfinder - 6.8b, a 23 increase in the projected annual
budget by 2010, increasing the Science portion of
total Agency budget from 33 in FY 2006 to 38 in
2010
6Preparing for Our Exploration Future
( in millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010
EXPLORATION SYSTEMS 3,165 3,707 3,826 4,474 5,125
Constellation Systems Exploration Systems RT Prometheus Human Systems RT 1,120 919 320 806 1,580 907 424 797 1,524 989 501 812 1,991 1,050 614 819 2,452 1,078 779 816
- The FY06 budget request for Exploration Systems
Directorate includes - 753m for the Crew Exploration Vehicle, Americas
future workhorse for safe and affordable human
exploration, with resources to pursue a timely
flight demo in 2008 - 919m, a 27 increase, for Exploration Systems
RT that will enable a designs for sustainable
exploration, including 44m for a revamped
technology transfer program and 34m for
Centennial Challenges prize program - 320m for Project Prometheus to test of a nuclear
reactor in 2008 and fly a demo mission within a
decade, followed later by other demonstrations
(e.g., to Jupiters moons)rephased to reflect
development profile and more than doubling over
five years - 806m for Human Systems RT, which after a
thorough bottom-up review, is now directly linked
to exploration requirements for human missions to
the moon and beyond
7Enabling Breakthrough Aeronautics Research
( in millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010
AERONAUTICS RESEARCH 852 728 731 728 718
- The FY06 budget request for Aeronautics
Directorate includes - Maintains top priorities in aeronautics research
- 193m, a 4 increase, for Aviation Safety
Security - 200m, a 32 increase, for Airspace Systems
- Also provides 459m for a restructured and
improved Vehicle Systems program - Focused on breakthrough research culminating in
flight demos - Pursues high risk, high payoff concepts beyond
incremental research of interest to industry
(e.g. eliminates almost all work in conventional
subsonic aircraft) - Consists of projects in noise reduction, high
altitude unmanned vehicles, and an all-electric
airplane - Includes realignment of workforce and facilities
to best implement new priorities
8Meeting Our Obligations
( in millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010
SPACE OPERATIONS 6,763 6,379 6,057 5,367 5,194
Space Shuttle Space Station Space Flight Support 4,531 1,857 376 4,172 1,835 371 3,866 1,791 400 2,815 2,152 400 2,419 2,376 399
- The FY06 budget request for Space Operations
Mission Directorate includes - 4.5b to return Shuttle to flight as a top
priority and resume flight operations - Provides 366m more for return to flight and
related activities in FY06 to maintain safe
operations in support of five planned flights - NASA will retire the Space Shuttle in 2010 while
working to ensure that the last flight is as safe
as the flights this year - 1.9b for the International Space Station
- NASA is examining configurations for the Space
Station that meet the needs of both the Space
Exploration Vision and our international partners
while using as few Shuttle flights as possible to
complete Station assembly - Assembly sequence and funding support enhanced
crew size of up to 6 prior to completion of
assembly, enabling important Vision work
9Pursuing Competition to Best Meet Requirements
- Industry, academia, and NASA field centers will
have opportunity to compete for over 10 billion
in new opportunities over the next five-years.
Examples - Exploration Systems --Crew Exploration Vehicle,
Crew Launch Vehicle, Project Prometheus, and
exploration research and technology - Science --Discovery, Explorer, New Frontiers,
Mars Scouts, Lunar Robotic Earth Science
Pathfinders, New Millennium, Living with a Star - Space Operations --Launch services to Station and
other users - Aeronautics --New breakthrough flight
demonstration projects in billions
10And Retooling Our Institution
- The focus of the transformed NASA is on how best
to achieve the Vision and other national
priorities assigned to NASA the Mission is
First - Human Capital Workforce transformation is
growing in importance and will require workforce
adjustments and distribution of needed skills
based on mission and core competency requirements - Physical Capital Growing list of underutilized
facilities will be assessed to determine the
critical requirements to support the Vision - Organization Based on Aldridge Commission
recommendations, plan proposals and legislation
to pursue non-governmental organizations to
enhance Center management structures - Transforming NASA field centers for the coming
decade through improved agility and
competitiveness - Vision provides the long-term focus and stability
required for sound business planning and for
attracting skills important to the US economy - Competition will help the Centers to provide the
best value and new and innovative approaches
while encouraging partnerships and collaboration
with industry and academia (notable successes
this past year) - Agility, enhanced by new legislative authorities,
will enable Centers to maintain cutting edge
capabilities as the Vision progresses and
technologies advance - Core competencies will be maintained and funded
through competition
11Maintaining Core Competencies
END-TO-END MISSION SYSTEMS
1. End-to-end mission sys. arch., design, dev ops -- GSFC, JPL, TBD
2. Large Complex Space Sys Dev Int (Space Infrast Dev) MSFC
3. Human Mission Planning, Training and Operations -- JSC
SCIENCE AND SCIENCE SUPPORT
1. Astrobiology ARC
2. Human Health Sciences and Astromaterials Res and Curation -- JSC
3. Observing Systems -- GSFC, JPL
4. Sensors and Instruments -- GSFC, JPL, LaRC
PROPULSION
1. Trans. and Prop. Systems Dev. MSFC
2. In-Space Propulsion (including Nuclear Systems) GRC
3. Rocket Propulsion Test (RPT) -- SSC
LAUNCH PROCESSING AND SERVICES
1. End-to-end launch services KSC
2. Assy, test, integ. processing of s/c, payloads flt sci exp KSC
3. RD, des, constr ops of spaceport services on all surfaces -- KSC
AERONAUTICS
1. Aero-propulsion Systems GRC
2. Aerosciences -- Research for Flight in all Atmospheres LaRC
3. Atmospheric Flight Research Test DFRC
4. Air Transportation Management Systems -- ARC
SYSTEM/SUB-SYSTEM COMPETENCIES
1. Power and Energy Conversion Systems GRC
2. Communication and Navigation Systems -- GSFC, JPL
3. Entry, Descent, and Landing Systems -- ARC, JPL, LaRC
4. Integrated Next-Generation Computing Systems ARC
5. Intelligent/Adaptive Systems ARC
6. Aerospace Materials and Manufacturing -- LaRC, MSFC
7. Systems Analysis/Engineering and Safety (One NASA) -- LaRC
- NASA Core Competencies are critical factors for
mission success - Funds will be provided as a result of competitive
selection decisions - Competition will enhance competencies through new
opportunities - NASA Core Competencies are resident at one or
more NASA Center - NASA Core Competencies will be periodically
reassessed - Annually to assess desired capability
- Tri-annually to determine if reassigned or
changed in response to changing mission
requirements, emerging commercial capabilities
and/or competitive results.
12And Reshaping Our Workforce
- Transforming workforce is a significant issue
- Termination of previous programs, like Space
Launch Initiative two years ago, significantly
increased the workforce not supporting a specific
program - As previous work has been completed, and some
projects discontinued, the issue has grown,
placing an untenable burden on Center GA - NASA must take necessary action to transform its
workforce to ensure the successful implementation
of the Vision - Centers are restructuring themselves as necessary
to ensure successful competition for new business
opportunities - Pursue new legislation and aggressively evaluate
and implement alternative management structures
to enhance agility and enable new opportunities - Sufficient workforce funding is provided in
FY05-06 to provide time for transition - Compete for new business opportunities
- Pursue expanded buyouts, training, and job fairs
- Seek voluntary reassignments, or directed
reassignments if necessary - Must actively address these initiatives to
complete this realignment by FY 2007 to avoid
undesirable consequences
13To Enable The New Age of Exploration
- The torch is being passed from the pioneers, who
first took us to the moon and beyond, to the new
generation of explorers who will take us into
deep space to stay - Sustainable implementation of the Vision will
provide the legacy for future generations - The FY06 NASA Budget reaffirms the Presidents
commitment and provides us the next step in
implementing the Vision - Returning Shuttle to completing assembly of the
Space Station - Exploring the cosmos with robots and humans
- Transforming to enable the Vision without
change, there is no Vision
We choose to explore space because doing so
improves our lives and lifts our national
spirit. So let us continue the journey.--Pres.
George W. Bush
14(No Transcript)
15Aeronautics Program ReplanGRC View
- A reduction of 40M to the Vehicle Systems
Program at GRC in - FY 2006 no top line change on Airspace Systems
and Aviation Safety Security Programs - The Vehicle Systems Program will be restructured.
It will include four flight demonstration
projects - Three related to Breakthrough in Environment
10 dB Noise Reduction, Sonic Boom and Zero
Emissions Aircraft - One related to Science and Exploration High
Altitude Long Endurance (HALE ROA) Aircraft - Majority part of the Program will be competed in
different levels (e.g. flight demonstration,
technology demonstration, technology development)
? Process will be developed with Center
participation in Feb/March timeframe. - Project Management and Implementation processes
will be developed with Center participation in
February and March timeframe.
16GRC Human Systems Research and Technology Program
- A loss of 18M to the Human Systems Research
Technology Program activities at GRC will occur
from FY05 to FY06, mostly due to the flight
hardware delivery of the Combustion Integrated
Rack (CIR) and the Fluids Integrated Rack (FIR)
to KSC - The legacy Office of Biological and Physical
Research (OBPR) program has been transformed into
the Human Systems Research and Technology (HSRT)
program and is aligned with the goals and
objectives of the Exploration program. - GRC continues to have a major role in the Human
Systems Research and Technology program,
specifically in - Advanced Extra Vehicular Activity
- Advanced Life Support
- Human Health and Countermeasures
- Advanced Environmental Monitoring and Control
- Fire Prevention, Detection, and Suppression
- Multiphase Flow Technology
17GRC Human Systems Research and Technology
Program (continued)
- The GRC Combustion Science program has been
transformed into the Fire Prevention, Detection,
and Suppression program and will be directed
towards developing engineering design data rather
than purely basic research. - The GRC Fluid Physics program has been
transformed into Advanced Life Support and
Multiphase Flow Technologies that will be
directed towards developing engineering design
data.
18Prometheus
- Jupiter Icy Moons Orbiter Mission (JIMO)
- Mission deferred for alternate mission that will
both demonstrate the use of nuclear electric
propulsion and provide a lower risk, science and
exploration relevant mission - GRC will retain responsibilities independent of
mission destination - Electric Propulsion design and technology
- Power conversion Heat Rejection technology
- Phase B co-design with Northrop Grumman, Naval
Reactors and JPL - Provide facilities, technicians, and engineering
capabilities to support naval reactors and prime
contractor development and qualification tests - Advanced Systems and Technology
- - GRC retains technology development and
management responsibilities in systems analysis,
advanced power and propulsion, nuclear thermal
and surface power
19Top Level Summary of GRC ICP Results
- Intramural Call for Proposals (ICP) Process
- 135 NOIs Submitted
- 18 Proposals Requested, 17 Proposals Submitted
- 44 Supporting Tasks Submitted as part of other
Center Proposals - ICP Selections (Announced 7/28/04)
- 4 Proposals Selected for GRC Lead Projects
(32.1M Total,24.7M GRC)) - 15 Supporting Tasks Selected (30M)
- Total Capture ICP
- Fluctuation expected due to negotiations and
potential selection of portions of the GRC led
proposals
20BAA Extramural Call for Proposals Success at GRC
- GRC was partner on 138 of the 500 total ECP
proposals - On Tuesday, Nov. 16, HQ announced that 70
proposals were selected with a total value of
over 1B - General Statistics out of 70 Selected Proposals
- GRC partnerships 20
- At least one NASA Center partner 68
- At least one University (or associated
institute) 46 - Largest number of Lead Roles Boeing, 7
- Largest number of Partner Roles JPL, 28
FY05 FY06 FY07 FY08 FY09 Totals
GRC FTEs 10.1 23.0 20.1 17.4 3.2 73.8
GRC Total M 3.2 8.4 7.4 7.0 1.2 27.2
21GRC Workforce
- As we went through the 2006 budget process, we
realized that we had a Civil Service workforce
challenge (reduction) of approximately 500 FTE by
2010 - We proposed handling approx 300 by a series of
buyouts over FY 2005-2006-2007, and another 80 by
other normal attrition - This approach left us with approx 100 FTE that
would have been added to our Center GA, in
anticipation of new work - The impacts on GRC of the Agencys response to
the OMB passback resulted in our workforce
challenge increasing to approx 700 FTE by 2007 - The agency is preparing additional options to try
to deal with this challenge - Agency-wide job fair and expanded buyout
opportunities in 2005 - Accelerating the analysis of alternative
management structures as recommended in the
Aldridge Report - Consideration of voluntary (and potentially
directed/involuntary) inter-center transfers - As a very last resort, consideration of Reduction
in Force procedures - In addition to these options, at GRC we are also
actively pursuing additional work and reviewing
the levels of our on-site support contractors
with the objective of identifying contractor
supplied tasks that could more appropriately be
performed by Civil Servants
22Summary
- The NASA Transformation in support of the
Presidents vision is moving forward aggressively - The ways that we collectively will be moving
forward as part of this transformation are
changing rapidly - We at GRC are committed to supporting the
Agencys transformation and expect to be a vital
contributor to the overall mission of the Agency - The rapidity and breadth of the transformation
present some very real and difficult challenges
to Glenn and the other centers - I am confident that by working together we can
successfully address these challenges - Questions?