20 trucks years 1 to 10. 22 trucks years 11 to 15. Shovels. Hitachi Super EX3500 ... Phelps Dodge, Hidalgo Smelter. Playas, New Mexico. Contract Specs ... – PowerPoint PPT presentation

Number of Views:72
Avg rating:3.0/5.0
Slides: 36
Provided by: unr
Category:
Tags: copper | costa | dodge | mining | trucks

less

Transcript and Presenter's Notes

Title: Costa Copper Mining Co.


1
Costa Copper Mining Co.
  • Tidal Wave Mine Project
  • Feasibility Study

2
Brief Overview
  • Copper Deposit
  • Madison County, Montana
  • Resources
  • 160 million tons at 0.77 copper
  • Open Pit Mining Method
  • Copper Flotation Mill
  • Profitable at 1.20/lb. Copper price

3
Location Access
  • Madison County, Montana
  • Tidal Wave Mining District
  • Bear Gulch
  • Access on Bear Gulch Road
  • From Twin Bridges

4
Location - Montana
Tidal Wave Project Location
5
Location - Vicinity
Tidal Wave Project Location
6
Climate
  • Temperatures
  • Annual Max. 58.1F
  • Annual Min. 27.8F
  • Annual Mean 43.0F
  • Precipitation
  • Annual Average of 9.67 inches
  • Average Snowfall of 11.0 inches

7
Geology Mineralization
  • Paleozoic Sedimentary Rock
  • Intruded by Outlier of Boulder Batholith
  • Primarily Limestone

8
Resources
  • 102 RC Drill Holes
  • 4,286 samples taken
  • 4,250 samples with mineralization
  • No Statistical Distribution Found
  • Basic statistics
  • Mean 0.83 Copper Grade
  • ID2 Method used for block filling
  • 50x50x50 size blocks
  • 148 Million Tons Averaging 0.83 Copper
  • excludes any blocks with grades lt 0.1

9
Mining
  • Open Pit Mining Method
  • Stripping Ratio is 2.11
  • 160 million tons of Copper ore _at_ 0.77
  • 8 internal dilution
  • Capacity
  • Ore 10.8 million tons per year
  • 42 thousand tons per day
  • 260 working days per year
  • 2-10 hour shifts per day

10
Pit Parameters
  • Overall pit slope angle of 47
  • Bench face angle of 70
  • 50 foot bench height
  • Haul road width of 100 feet
  • Haul road Gradient of 8
  • Pit bottom 6450 elevation
  • Pit crest 7350 elevation

11
Pit Design
12
Mining Production
13
Mining Equipment
  • Haul Trucks
  • R190C Euclid 190 Ton Capacity
  • 20 trucks years 1 to 10
  • 22 trucks years 11 to 15
  • Shovels
  • Hitachi Super EX3500
  • 3 shovels for entire mine life
  • replace 2 after 7 years

14
Equipment List
15
Drilling Blasting
  • 2 - Ingersoll-Rand DM-M2 rotary drills
  • 9-7/8 inch diameter blastholes
  • 21 x 21 spacing/burden pattern
  • Blast Patterns
  • 65 holes years 1 through 5
  • 55 holes years 6 through 15

16
Daily Blasting Agents
17
Minerals Processing
  • Copper Flotation Mill
  • 90 recovery
  • 35,000 tons/day throughput
  • 900 tons/day concentrate
  • average grade of 27 Copper
  • 35,100 tons/day of makeup water
  • 240 gallons H20/ton of ore
  • Total Mill Concentrates 4.1 million tons

18
Mill Costs
  • Operating cost of 3.17/ton
  • includes
  • labor, supplies, electrical equipment, and other
  • Electrical Consumption
  • 20kWh/ton at power cost of 0.05/kWh
  • Capital Cost of 208 million

19
Smelter Contract Transportation
  • Phelps Dodge, Hidalgo Smelter
  • Playas, New Mexico
  • Contract Specs
  • pay for 96.6 of contained copper
  • 50/dry metric ton treatment charge
  • 0.05/lb of payable copper refining charge
  • Net smelter return of 2.3 billion
  • Transportation, 1,350 miles from project
  • 50/ton by rail
  • Total cost of 224 million

20
Site Preparation
  • Buildings very little leveling work needed
  • approximately 3.6 million square feet of area
  • Haul Road Improvements
  • Tailings Impoundment
  • Waste Dump
  • Power Line
  • Fence
  • Rail Spur

21
Employment
  • 311 hourly salaried
  • 236 hourly
  • average yearly wage 44,700
  • 75 salaried
  • average yearly salary 65,000
  • No housing will be supplied
  • Housing in Butte
  • Transportation will not be provided

22
Pre-Production
  • Six year pre-production phase
  • Baseline 1 year (2000)
  • EIS 3 years (2001-2003)
  • Permitting 1 year (2003)
  • Development 2 years (2004-2005)
  • First year of production (2006)

23
Pre-Production Schedule
24
Environmental
  • Baseline Study (1 Year)
  • Studies
  • Soils, Vegetation, Air Quality, Wildlife,
    Surface, Noise, Visual, Social,
    Cultural/Historical
  • estimated cost of 1 million
  • EIS (3 years)
  • estimated cost of 1 million per year
  • Permitting (1 year)

25
Project Permits
  • Permits Required
  • estimated 75,000
  • 1 year

26
Reclamation
  • 3700 acres of disturbed land
  • Concurrent recl. Of waste dump
  • estimated 250 thousand/year
  • Total cost for reclamation is 10 million
  • Established Reclamation Sinking Fund
  • 6.25 million sinking fund
  • Annual payments of 249 thousand

27
Financial
  • Development Costs
  • Total cost is 38 million
  • Capital Costs
  • Initial Equipment cost is 71.6 million
  • Building cost is 184.5 million
  • Initial Capital Expenditures
  • 256 million

28
Financial - Operating Costs
  • Average yearly cost 70 million
  • Equipment
  • 11.5 million/year (Years 1 - 10)
  • 12.3 million/year (Years 11 - 15)
  • Mill is 34 million per year
  • includes labor
  • Blasting cost is 47.4 million
  • Mine Wages
  • Hourly wages 6.6million
  • Salaried wages 3.4million

29
Revenue
  • Net Smelter Return at price of 1.20/lb
  • Total 2.3 billion
  • Yearly Average 150 million

30
Economic Analysis
  • Cash Flow Statement at 1.20/lb Cu
  • Rate of Return of 12.66
  • Net Present Value 20 million
  • Hurdle rate of 10
  • Cumulative Net Cash Flow 300 million
  • Make money in 8th year of production

31
Cash Flow Comparison
32
Project Operating Costs
  • Operating Cost per Ton
  • 10.00/Ton (years 1 - 10)
  • 8.97/Ton (years 11 - 15)
  • Cost per Pound Metal
  • 0.60/lb (years 1 - 10)
  • average grade of 0.83 Copper
  • 0.60/lb (years 11 - 15)
  • average grade of 0.75 Copper

33
Sensitivity Analysis
  • Sensitive to Copper Price
  • Cash flow trials at different copper prices
  • 0.84, 1.00, 1.20, and 1.50 per pound
  • Break Even Price
  • 1.18/lb with Hurdle rate of 10

34
Price Sensitivity
35
Recommendation's
  • More Exploration
  • Pit Optimization
  • Haul Road Exit from Pit
  • Waste Dump Placement
  • Improve equipment Selection
  • Mine Operating Hours