Factory Building Symposium on Lean Production - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Factory Building Symposium on Lean Production

Description:

Doors painted in open area subject to dust and interference. Dedicated paint booth ... Doors closer to point of use. Defects from 25% to 5% of doors ... – PowerPoint PPT presentation

Number of Views:160
Avg rating:3.0/5.0
Slides: 17
Provided by: car99
Category:

less

Transcript and Presenter's Notes

Title: Factory Building Symposium on Lean Production


1
Factory Building Symposium on Lean Production
  • January 29, 2007Austin, Texas

2
Palm Harbor HomesPlant City, FLMichael
Lombard,Continuous Improvement Manager
  • Creating a Lean Infrastructure

3
Palm Harbor Plant 06
4
Challenges
  • Employee turnover
  • Lack of standard work procedures
  • Instability on the shop-floor
  • Poor work environment
  • Unstructured improvement process

5
Strategy Build a Foundation for Lean
  • Integrate lean into the plant culture
  • Establish a well defined infrastructure for
    kaizen (continuous improvement)

6
Lean Culture
  • Training for managers
  • Weekly book club meetings
  • Hands-on simulations, gemba observations, etc.
  • Online learning component
  • Training for shop floor associates
  • Five S
  • Standardized work
  • One-piece flow and pull systems

7
Kaizen Infrastructure
  • Lean Executive Team
  • Champions improvement projects
  • Appoints and supports project captains
  • Provides resources and guidance
  • Five S Workplace
  • Providing a positive workplace
  • Use visual control
  • Encompass entire facility
  • Idea Development Process
  • Harness employee creativity
  • Available to all
  • Plan-Do-Check-Adjust

8
Idea Process Results
  • Ideas generated 200
  • Ideas implemented 78
  • Total estimated savings to date 108,000

9
Frame Shop
Then
Now
  • Unnecessary moving frame in and out of floor
    department
  • Frame moves directly into frame department
  • Floor crew stopped work while frame moved through
  • Floor crew works without interruption

10
Results
  • Cost less than 1,000
  • Floor department works uninterrupted
  • Eliminated waiting time
  • Eliminated 4 floor moves
  • Throughput time reduced
  • Labor savings 36,000 per year

11
Paint Booth
Then
Now
  • Doors painted in open area subject to dust and
    interference
  • Dedicated paint booth
  • No fixtures
  • Fixtures for holding and flipping doors
  • Doors painted close to point of use
  • Doors painted far from point of use on the line

12
Results
  • Cost less than 2,000
  • Doors closer to point of use
  • Defects from 25 to 5 of doors
  • Painting time reduced by two-thirds
  • Total labor savings 31,500 per year

13
Highlights
  • Getting buy-in critical to make improvement ideas
    work
  • Basic understanding of lean critical to
    management buy-in
  • Action over planning

14
Going Forward
  • Continue Management Training
  • Develop Shop-Floor Training
  • Expand Idea Development Process
  • Evolve Five S Workplace

15
Lean Symposium
16
Factory Building Symposium on Lean Production
  • Manufactured Housing Research Alliance
  • Jordan Dentz
  • (212) 496-0900 x13
  • jdentz_at_research-alliance.org
  • www.mhrahome.org