T H E M E A S U
R E O F T E
C H N O L O G Y
TRITON CEIBA EARLY PRODUCTION SYSTEM
Cameron Subsea Systems Case History
2
TRITON CEIBA EARLY PRODUCTION SYSTEM
  • Located in Block G, Rio Muni Basin, 35 km off
    the coast of Equatorial Guinea
  • Water depth 730 m

PROJECT DESCRIPTION
3
TRITON CEIBA EARLY PRODUCTION SYSTEM
  • Satellite configuration each manifold ties one
    tree to two export flowlines via fabricated well
    jumper Cameron Vertical Connector (CVC) System
    flowlines tie back to FPSO

PROJECT DESCRIPTION
4
TRITON CEIBA EARLY PRODUCTION SYSTEM
  • Four, 10,000 psi WP Cameron SpoolTree Production
    Systems, guidelineless with optional guideline
    assist capability
  • Production and annulus valves rated 10,000 psi
  • Pressure and temperature sensors located at
    production wing valve

CHRISTMAS TREES
5
TRITON CEIBA EARLY PRODUCTION SYSTEM
  • Four retrievable subsea manifolds, rated 5000 psi
    WP
  • Pigging loops insulated and fully retrievable

MANIFOLDS
6
TRITON CEIBA EARLY PRODUCTION SYSTEM
  • CAMTROL Advanced Electro-Hydraulic Multiplexed
    Subsea Production Control System
  • Topside components Master Control Station,
    Electrical Power Unit, Return Reservoir Unit,
    Topside Umbilical Termination Unit and
    Uninterruptible Power Supply
  • Subsea components Umbilical Termination
    Assembly, Subsea Control Module, Subsea
    Accumulator Module and Pigging Jumper

CONTROL SYSTEM
7
TRITON CEIBA EARLY PRODUCTION SYSTEM
  • Cameron Vertical Connector (CVC) System with
    collet-type connectors and hydraulic running tool

CONNECTIONS
8
TRITON CEIBA EARLY PRODUCTION SYSTEM
Subsea manifold installation
Installation of Cameron SpoolTree
Subsea Distribution Unit
PHOTO GALLERY
Write a Comment
User Comments (0)
About PowerShow.com