Title: Drilling Rig URB-10-2SH
1Drilling Rig URB-10-2SH
2INNCOR Company Presents
- multipurpose drilling rig Buran URB-10-2SH,
- for the first time designed by the method of
3D-simulation with computer strength testing
3- LLC INNCOR (innovative constructor
developments) is the team of experts industrial
engineers who gained broad experience from
Russian military-industrial complexes, and young
constructors, well-informed about all the
advanced technologies in the sphere of complex
equipment developments as well as creating
machine building factories. - The project of multipurpose drilling rig Buran
is realized jointly with GOTEK Group.
4Basic ideas put in the concept of the drilling
rig Buran
- Multipurpose
- Production Efficiency
- Reliability
5Comparative characteristics of Russian drilling
rigs and Buran
URB-10-2SH URB-2?-2 URB-5?G URB-2M GBU-5 PBU-2
t.max(kgm) 700 430 700 400/200 500 500
Q(rot/min) 10-1700 85-325 34-300 0-65/0-130 5-550 25-430
Winch G(kg) 3000 - 3000 - 2500 1600
F(kg) 10000 6000 7800 2000 10000 10000
D(mm) 600 190 360 300 230 190,5
- Buran has no analogues in the set of
characteristics in the Russian Federation.
6Structural peculiarities and advantages of the
drilling rig Buran
- Lantern pinion drive mechanism for carriage
provides - High pull force (10 pf up/down) in combination
with high speed movement of the carriage (1,28
m/s) - High reliability and operation durability under
field conditions - Low load on mast frame in comparison with
traditional schemes - Possibility to use built-up or jack-knife mast
while maintaining the ability to move rotator
along the mast - Simplicity and maintainability
- Possibility to use mast bearing frame with locked
design, that provides high strength and stiffness
of structure.
- Developed drive mechanism for carriage is the
unique construction which has no analogues not
only in Russian but elsewhere in the world.
7Structural peculiarities and advantages of the
drilling rig Buran
- Mast
- For the fist time designed by the method of
complete 3D-simulation with computer strength,
stiffness, hardness testing.
- Result strong and light design
8Structural peculiarities and advantages of the
drilling rig Buran
- Operational turnover range of rotators output
shaft enables to realize drilling by different
tools, from screw conveyor (diameter 600mm) to
diamond tool (max rotary velocity 1700r/min).
9Structural peculiarities and advantages of the
drilling rig Buran
Winch
- Hydraulic planetary drill winch with free fall
- application of planetary reducer in winch drive
mechanism raises its durability and control
accuracy.
10Structural peculiarities and advantages of the
drilling rig Buran
Rotators angle of deflection relatively to
horizontal axis - 75
Maximum load capacity 12000 kg
Mast height (from ground to crown blocks axis)
- Structural efficiency which exceeds domestic and
foreign analogues is the result of carriages
locked power design usage.
11Multipurpose drilling rig Buran
Water Well Drilling
- High speed of the carriage 1,28 m/sec
- Ease and high speed of makeup and breakout
operations with rotators angle of deflection
relatively to horizontal axis 75 - Mast height up to 12m
- Free fall winch pull force 3 pf.
- Buran easily drills water well with depth up to
250m with great efficiency!
12Multipurpose drilling rig Buran
Site investigation
- Torque 700 kg/m
- Borehole diameter up to 800 mm
- Possibility of directional drilling mast
fixation from 0 to 45 - Static penetration test bottom hole pressure
10 pf - Regular carriage movement with min. speed 1
m/min - Possibility to use diamond tool max. rotators
turnover 1700 r/min.
Drilling rig Buran provides highly efficient
and safe site investigation.
13Our service and support
- 24 month guarantee
- Operating instruction, logbook, complete
electronic catalogue of details and units - After-sales service according to contract
- Emergency repairs delivery of repair parts and
maintenance team support during 72 hours on terms
of after-sales contract - Parts depot.
14Status
- Finished design documentation of the prototype
- Signed contracts with suppliers
- Scheduled prototype manufacturing
- Signed contracts with the outsourcing companies
- Preparation for machine-tool attachments finished
by 28.06.2011.
15Thank you for your attention!