Title: Significant Proton Plan Accomplishements in FY05


1
Significant Proton Plan Accomplishements in FY05
  • Linac
  • (1.01.01) Linac PA Vulnerability
  • Put out req. for 12 new Burle 7835 tubes on the
    recommendation of the working group
  • Booser
  • (1.02.02) ORBUMP System
  • Build 4 ORBUMP magnets (need 3)
  • Significantly redesigned injection girder and 400
    MeV line
  • Power supply complete (except for capacitors)
  • Ready for next shutdown
  • (1.02.03) Corrector System
  • Nearing completion of corrector design
  • Beginning prototype
  • Arranging as two AIPs (vertical and horizontal)
  • (1.02.11) Booster dump reloctions
  • Designed and reviewed
  • Mostly reused hardware (except for stands)
  • Ready for next shutdown
  • Main Injector
  • (1.02.01) Large Aperture Quads

2
Major Plans for FY06
  • Linac
  • (1.01.01) Linac PA Vulnerability
  • Decide on Thales tube test stand, and possibly
    proceed
  • (1.01.04) Booster LLRF
  • Work on design
  • Booser
  • (1.02.02) ORBUMP System
  • Install and commission
  • (1.02.03) Corrector System
  • Build prototype
  • (1.02.11) Booster dump reloctions
  • Implement and commission
  • (1.02.12) Booster chopper
  • Design and begin construction
  • (1.02.13) RF Reliability upgrades
  • Purchase and install distribution transformers
  • Main Injector
  • (1.02.01) Large Aperture Quads
  • Install in shutdown