Coram Deo Academy - PowerPoint PPT Presentation

1 / 43
About This Presentation
Title:

Coram Deo Academy

Description:

Select Architects and begin comprehensive site plan design and detailed remodeling plans ... commercial and 1 residential kitchen. Public and several small ... – PowerPoint PPT presentation

Number of Views:60
Avg rating:3.0/5.0
Slides: 44
Provided by: rodneyjm
Category:
Tags: academy | coram | deo | design | kitchen

less

Transcript and Presenter's Notes

Title: Coram Deo Academy


1
Coram Deo Academy
  • Probable Purchase of Flower Mound Campus

2
Probable Timeline for Campus Development
  • 2005
  • April
  • The Church at Wichita Creek and Coram Deo Academy
    sign Letter of Intent
  • May
  • Sign purchase contract
  • June
  • Close on sale
  • July
  • Move Flower Mound Lower School (K-6) to the new
    campus
  • August
  • Conduct capital campaign feasibility study to
    determine parameters in conjunction with the J.
    F. Smith Group. CDA has met three times with
    Jerry Smith, former Director of Development at
    Auburn and expert in fundraising and capital
    campaigns for churches and schools.
  • December
  • Move FM Upper School (7-12) to the new campus
    after placement of temporary classroom buildings

3
Timeline
  • 2006
  • January
  • Begin capital campaign with the J. F. Smith
    Group. Amount to be determined during
    feasibility study with first marker set at .5 M
    to provide funds for remodel and expansion of
    classroom facility to replace temporary
    buildings.
  • March
  • Select Architects and begin comprehensive site
    plan design and detailed remodeling plans
  • September
  • Town of Flower Mound issuance of site plan
    approval
  • October
  • Construction documentation for remodel and
    expansion of existing classroom structure to
    replace temporary buildings
  • November
  • Project bidding

4
Timeline
  • December
  • Project permitting
  • March
  • Stage for construction
  • April
  • Begin remodel
  • August
  • Complete remodel
  • September
  • Delay school start to after Labor Day
  • Remove temporary buildings by December
  • Fall
  • Plan capital campaign for next phases of campus
    development

5
(No Transcript)
6
Property Description
  • The subject property has been offered privately
    to CDA. The pastor has a son enrolled at the
    Academy.
  • It consists of 15.1 acres of undulating wooded
    land surrounded by high-end residential
    development and across the street from an
    Episcopal Church. The property includes two
    ingress egress points, adequate interior
    circulation drives and parking, a practice field,
    pond, a 11,000 SF classroom building,
    auditorium/gymnasium and office structure along
    with several undeveloped acres suitable for
    additional buildings and site development.

7
(No Transcript)
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
(No Transcript)
15
Auditorium/gymnasium
  • 6,700 SF
  • Carpeted Assembly space for 275 or for Jr. High
    sized practice court with drop down baskets.
    Entrance foyer, 2 classrooms, public restrooms,
    and storage.

16
Foyer
17
(No Transcript)
18
(No Transcript)
19
(No Transcript)
20
Portables3 buildings for 6 classrooms
21
(No Transcript)
22
(No Transcript)
23
More
24
(No Transcript)
25
Main Complex
  • 11,200 SF classroom complex consists of three
    interconnected buildings convertible to include
  • 13 classrooms
  • 3 offices
  • Lunch space, 1 commercial and 1 residential
    kitchen
  • Public and several small bathrooms

26
(No Transcript)
27
(No Transcript)
28
(No Transcript)
29
(No Transcript)
30
(No Transcript)
31
(No Transcript)
32
Move
  • Remodel classroom complex to maximize classroom
    space and add temporary modular classroom space
    to accommodate the entire Flower Mound K-12
    school and the Coram Deo Main Offices

33
Near Future Plans
  • Prepare site and space development plan and
    architectural renderings for expansion
  • Raise through capital campaign
  • Issue bonds/obtain bank financing to support
    expansion
  • Complete campus development in two stages.

34
Conceptual Study and Renderings
  • Phillip S. Waite, BSLA, MAA, RLA
  • Professor of Landscape Architecture, Washington
    State University

35
(No Transcript)
36
(No Transcript)
37
(No Transcript)
38
(No Transcript)
39
(No Transcript)
40
(No Transcript)
41
(No Transcript)
42
(No Transcript)
43
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com