Title: SafeLaneTM Epoxy Overlay ND 0702


1
SafeLaneTM Epoxy OverlayND 07-02
  • 2009 OPD Conference
  • November 18 19, 2008
  • Andy Mastel
  • NDDOT - Materials Research Division

2
SafeLaneTM Description
  • SafeLaneTM is a porous aggregate that is patented
    by Cargill Inc.
  • An epoxy manufactured by Unitex was used with the
    SafeLaneTM aggregate.
  • This epoxy overlay system was designed to improve
    skid resistance and reduce maintenance deicing
    efforts.
  • The overlay system can be used on concrete or
    asphalt pavement surfaces.

3
SafeLaneTM Video
4
SafeLaneTM Topics
  • Purpose
  • Manufacturer Expectations
  • Project Locations and Design
  • SafeLaneTM Cost
  • SafeLaneTM Construction Process
  • Manufacturer Specifications
  • SafeLaneTM Evaluation

5
Purpose
  • Help reduce crash statistics on bridge decks.
  • Reduce Frost and Black Ice formation.
  • Improve surface friction.
  • Observe and evaluate products according to stated
    manufacturer performance.

6
SafeLaneTM Manufacturer Expectations
  • Prevents ice and snow from bonding to road
    surface.
  • Reduces formation of frost and black ice.
  • Anti-icing and anti-skid properties.
  • Provides year-round surface friction.
  • Minimal aggregate loss from snow plows.
  • Up to 15 year service life.

7
SafeLaneTM Location and Design
  • West of Williston on US Highway 2 starting at the
    Sand Creek structure.
  • Bridge Deck 3640 square feet (130 linear feet)
  • Roadway 7650 square Feet (300 linear feet)
  • Both driving lanes in the east bound direction
    were overlaid.
  • East Bound test section.
  • West Bound control section.
  • Beginning RP 18.303.

8
(No Transcript)
9
Location
10
SafeLaneTM Location and Design
  • BNRR and Missouri Road Structure near Mandan
  • Bridge Deck 7120 square feet (178 linear feet)
  • Roadway 500 square Feet (20 linear feet driving
    lane)
  • Both driving lanes were overlaid.
  • West Bound test section.
  • East Bound control section.
  • Beginning RP 154.337.

11
Control Section EB
Test Section WB
12
(No Transcript)
13
SafeLaneTM Installation Costs
  • The material is estimated to cost
  • 2.50 to 3.00/sq. ft.
  • The installed cost is estimated to be
  • 9.00/sq. ft.
  • Sand Creek Installation
  • cost 143,710 or 12.72/ sq. ft.
  • BNRR and Missouri Road
  • cost 81,178 or 10.96/ sq. ft.

14
Temperature Constraints
  • Temperature restrictions in plan note
  • The epoxy, aggregate, and pavement surface shall
    be 60 to 90 degrees Fahrenheit
  • SafeLaneTM shall not be applied if the
    temperature is expected to drop below
  • 55 degrees Fahrenheit within eight hours

15
Construction Process
  • Both projects were constructed one lane at a
    time.
  • Pavement Preparation
  • Mixing Epoxy
  • 1st Course Application
  • 1st Course Cleanup
  • 2nd Course Application
  • 2nd Course Cleanup

16
  • Pavement Preparation
  • Shot blast concrete

17
  • Pavement Preparation
  • Sand Blast Asphalt
  • Sand Blast where shot blaster cannot reach

18
  • Pavement Preparation
  • Pavement marking obliterator

19
  • Pavement Preparation
  • Blow off with compressed air
  • Tape off borders and joints
  • Stage aggregate

20
  • Mixing Epoxy
  • Pour each epoxy part into a measuring container
  • Pour each part into mixing barrel

21
  • Mixing epoxy
  • Mix two part epoxy 50/50 ratio
  • Mix with variable drill that has a paddle wheel
    attached for three minutes

22
  • First Course Application
  • Mix two part epoxy
  • Pour out two part epoxy onto pavement
  • Squeegee epoxy into place with notched squeegee

23
  • First Course Application
  • Spread aggregate onto epoxy before flash time of
    the epoxy

24
  • 1st Course Cleanup
  • Power broom excess aggregate with skid steer
    sweeper
  • Blow off 1st course with compressed air
  • Leaf blower was also used for cleanup
  • Tape joints and overlay boundaries for second
    course

25
  • Second Course Application
  • Same steps as first course
  • Requires twice as much epoxy and aggregate
  • Flat blade squeegee is used to spread epoxy

26
  • Second Course Cleanup
  • Power broom to sweep excess aggregate
  • Blow off with compressed air
  • After striping overlay is ready for traffic

27
(No Transcript)
28
BNRR and Missouri Road SafeLaneTM Installation
complete
29
Sand Creek Structure SafeLaneTM Installation
complete
30
Manufacturer Specifications
31
SafeLaneTM Evaluation
  • The sister bridge will act as the control
    structure.
  • Materials and Research will evaluate this
  • product with help from the District annually.
  • Evaluation criteria
  • 10 year evaluation period.
  • Deicing capabilities.
  • Crash statistics.
  • Performance of binder.
  • Performance of aggregate

32