National System in Romania facts and challenges - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

National System in Romania facts and challenges

Description:

National System in Romania - facts and challenges - Mr. Vlad Trusca ... Romania first Annex I country that ratified the Kyoto Protocol ... – PowerPoint PPT presentation

Number of Views:71
Avg rating:3.0/5.0
Slides: 13
Provided by: vladt
Category:

less

Transcript and Presenter's Notes

Title: National System in Romania facts and challenges


1
National System in Romania- facts and challenges
-
  • Mr. Vlad Trusca
  • Ministry of Environment and Water Management
  • - UNFCCC Workshop on National Systems -
  • - 11 April 2005 -

2
History
  • UNFCCC signed in 1992-Rio Earth Summit
  • ratified in 1994 by Law 24
  • Kyoto Protocol signed in 1999
  • ratified in 2001 by Law 3
  • Romania first Annex I country that ratified
    the Kyoto Protocol
  • Target 8 reduction of GHG emissions
  • European Union Candidate Country - accession to
    the EU in 2007

3
History - GHG Inventory
  • The IInd National Communication (1999) -summary
    of GHG inventories for years 89-94
  • December 2002 first submission of CRF tables
    for the period 1992-2000 and NIR
  • May 2003 first submission in time of CRF tables
    for the period 1992-2001 and NIR
  • Oct. 2003 in-country review (Bucharest)
  • May 2004 submission of the inventories covering
    the entire time series 1989-2002 recalculated
    based on the in-country review
  • Nov. 2004 desk review

4
Last Inventory submitted
Source Romanias GHG Inventory submission 2004
5
Institutional Arrangements
  • Ministry of Environment and Water Mngmt. (MEWM) -
    NFP coordination and submission
  • National RD Institute for Environmental
    Protection (ICIM Bucharest) GHG inventory
    (Energy, Ind.Proc, SolventOP, Agric., Waste)
  • National Institute for Forest Research and
    Management (ICAS) LULUCF
  • National Commission for Climate Change (NCCC)
    advice for approval

6
Inventory Preparation
  • Annual contract between MEWM and ICIM
  • Sub-contractor ICAS (LULUCF)
  • ICIM team consists of 2 full time experts
  • Revised 1996 IPCC Guidelines used for the
    entire time series from the first submission
  • Apr. 2005 - GHG inventory is 80 ready
    recalculations of entire time series 8902
  • New CRF reporter to be used in the 2005
    submission together with the new tables for the
    LULUCF

7
National System
  • NS exists but still needs improvements
  • GD 586/2004 establishing National System for
    Integrated Assessment and Management of Air
    Quality (NSIAMAQ) legal framework for NS
  • MEWM together with NEPA and ICIM is developing a
    methodology based on the GD 586/2004 procedural
    framework for the NS
  • Based on the Annex to the Decision 20/CP.7
  • General and specific functions
  • 3 parts planning, preparation, management
  • Considering also the EU Decision 280/2004/EC

8
Data Collection (1)
  • Entities involved GHG Inventory performed
    annually by ICIM NEPA supported by MEWM
  • ICAS sub-contractor LULUCF
  • Main activity data provider - National Institute
    for Statistics (NIS)
  • Questionnaires submitted to producers, consumers,
    relevant industrial enterprises
  • Ministries and local EPAs for data not available

  • Human resources - 2 ex. ICIM, 1 ex. ICAS
  • Internal cooperation based on a Memorandum signed
    between the MEWM and NIS

9
Data Collection (2)
  • Covering of all sectors and IPCC source categ.
  • Official documents published annually by NIS
  • Problems identified in the base year (1989) due
    to different statistical aggregation of AD
  • Default EF used in general (lack of CS EF)
  • Some CS EF in Energy Ind. Processes
  • Uncertainty estimation not performed yet
  • Lack of important activity data for Tier 2
    methods
  • QA/QC plan to be developed in 2005

10
Problems
  • Lack of financial and human resources
  • Lack of data in some sectors and activities (e.g.
    internal and intl. aviation) and for certain
    gases (HFCs and SF6)
  • Inconsistency between Romanian and intl.
    statistical data (e.g. FAO, IEA)
  • Using default EF and methodologies instead of
    country specific
  • Internal cooperation between institutions
  • Timing regarding data collection

11
Future activities
  • Finalizing the Strategy for Climate Change
    Related Activities and preparing the National
    Action Plan for Climate Change
  • Approving methodology based on NSIAMAQ
  • Testing the national system methodology for the
    next year submission
  • Developing CS EF and methodologies
  • Shifting to higher tier method for key sources
  • More comprehensive NIR

12
Thank youFor further information
contactVlad Trusca, MEWMemail
vlad_at_mappm.roIonela Draghici, ICIM
Bucharestemail draghici_at_icim.ro
Write a Comment
User Comments (0)
About PowerShow.com