1 - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

1

Description:

Uganda Electricity Transmission Company Limited ( UETCL) is a public limited ... 12. THANK YOU. UGANDA ELECTRICITY TRANSMISSION COMPANY LTD ... – PowerPoint PPT presentation

Number of Views:75
Avg rating:3.0/5.0
Slides: 13
Provided by: kir4
Category:
Tags: uganda

less

Transcript and Presenter's Notes

Title: 1


1
  • Kampala Industrial and Business Park Presentation

2
Contents
  • UETCL
  • UETCL mandate
  • Current Power Supply Status at Namanve
  • Namanve 3x32/40MVA substation Project
  • Project objectives
  • Project description
  • Timeline For Project Implementation
  • Namanve 50MW Thermal Power Generation Project
  • Project Implementation

3
Uganda Electricity Transmission Company Limited (
UETCL) is a public limited company and was
incorporated on 26th March, 2001 after the
unbundling of Uganda Electricity Board (UEB) into
three successor companies.
4
UETCL mandate
  • Owns and Operates the High Voltage Transmission
    Grid (HVTG) above 33kV
  • Co-ordinates the power supply system to achieve
  • balance between supply and demand
  • Responsible for dispatching generation facilities
  • Bulk Power Purchase and Sales ( Single Buyer)
  • Power Exports and Imports

5
Current Power Supply Status at Namanve
  • The Kampala Industrial and Business Park (KIBP)
    is currently supplied by a 33kV line which
    originates from Lugogo substation some 10km away.
    The line supplies power to Coca Cola factory,
    Mukono and Nakifuma substations.
  • The above line has limited capacity of 20MW and
    hence the need for construction a new substation
    near KIBP.

6
Namanve 3x32/40MVA, 132/33kV substation Project
  • Following the degazetting of 894 hectares of land
    at Namanve for industrial development, studies
    funded by GoU and various development partners
    were conducted to determine the feasibility of
    the site for industrial park establishment.
  • The studies recommended among others the
    construction of a 132/33kV substation to supply
    power to the proposed industrial park.

7
Project objectives
  • Provision of adequate and reliable substation
    firm capacity to meet the requirements of KIBP.
  • Improvement of security of power supply to the
    load centers of Kireka, Mukono and Nakifuma.

8
Project description
  • The project involves the construction of a new
    132/33kV substation at Namanve near KIBP.
  • The proposed scope of includes design, supply,
    installation and commissioning of the following
  • i) 3 X 132/40 MVA,132/33kV Transformers
  • ii) 2 X 132kV line bays
  • iii) 2 X 132kV transformer bays
  • iv) 3 X 33kV transformer bays
  • v) 8 X 33kV line bays
  • vi) 2 dead end towers
  • vii) Civil works
  • The Project is financed by IDA/WB and UETCL

9
Timeline For Project Implementation
10
Namanve 50MW Thermal Power Generation Project
  • Objective
  • To acquire a permanent thermal power plant to
    provide Hydro /Thermal generation mix and
    mitigate emergency situations.

11
Project Implementation
  • UETCL has identified 3.8 Acres of land near the
    planned 132/33kV substation and is in the final
    stages of the procurement process.
  • The project is being procured on a Build Own and
    Transfer (BOT) arrangement.
  • Bids for the procurement of the project are in
    advanced procurement stages.
  • The plant will be commissioned in Q4 of 2007

12