Brian Robinson NDT', InstG - PowerPoint PPT Presentation

1 / 26
About This Presentation
Title:

Brian Robinson NDT', InstG

Description:

Ptarmigan, Snow Bunting, Reindeer. Areas within the national park for nature conservation ... The development site spans altitudes between 600mts and 1,080mts ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 27
Provided by: lissscot
Category:
Tags: instg | ndt | brian | robinson

less

Transcript and Presenter's Notes

Title: Brian Robinson NDT', InstG


1
Brian Robinson NDT., InstG
  • Seed Research Director
  • Rigby Taylor

2
WELCOME TO THE CAIRNGORMS
  • FUNICULAR RAILWAY PROJECT

3
(No Transcript)
4
BACKGROUND INFORMATION
  • PROJECT
  • Replace chairlift with Funicular Railway
  • Ptarmigan, Snow Bunting, Reindeer
  • Areas within the national park for nature
    conservation

5
PROJECT
  • The development site spans altitudes between
    600mts and 1,080mts
  • The Cairngorm lies partly within the Cairngorm
    area of conservation
  • The main principles to consider are
  • Minimise damage to the vegetation and protect
    areas surrounding the development
  • Scrap off the existing vegetation as turf for
    reinstatement
  • Excavation of the organic material situated
    between the plant root mass and granite base
  • The organic material to be removed by horizons
    for storage prior to reinstating them in their
    original position

6
MINIMISING DAMAGE
  • A two stage cable crane was erected following the
    line of the original ski lift
  • The crane was capable of lifting up to nine
    tonnes
  • This reduced the need for frequent access and
    reduced vegetation damage

7
SCALE OF THE OPERATION
  • Largest single component was the cut and fill
    operation to construct the tunnel
  • The tunnel is approximately 250metres long and
    50metres wide (including excavation area) and is
    situated at an altitude of 1,080 metres
  • Vegetation, contours and soil profiles were
    plotted and photographed prior to commencement of
    the construction

8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
PRINCIPLES OF HABITAT RENOVATION
  • Minimising damage
  • Removal and replacement of vegetation in exact
    location
  • Storage and documentation of soil profiles and
    vegetation

15
WHY USE AMENITY GRASSES?
  • Varieties easier to control by nutrient
  • Establish under more varied conditions
  • Can be controlled by nutrient to avoid
    contamination of local flora
  • Wider portfolio of grasses available

16
ADVANTAGES OF AMENITY GRASSES
  • Can formulate mixtures to create a long- term
    vegetation structure, which encourages
    development of new flora, i.e. crowberry from the
    peat root zone material
  • Rapid root establishment for stabilization
  • Protects sensitive vegetation during the
    regenerating process
  • Less risk of contamination

17
TIME SCALE OF GRASS TRIALS
  • Initial trials 8890
  • Mixture trials 95-99

18
TRIAL MIXTURE 1
19
TRIAL MIXTURE 3
20
TRIAL MIXTURE 4 Northern Carries (SSI Area)
21
MIXTURE OBSERVATIONS
  • Within three years, local heather Nardus stricta
    and Deschampsia flexuosa grasses were noted to be
    developing in the base of the original sward.
  • Heathers and local flora were noted to have
    increased by 30 over the initial 3 years of the
    trials.
  • The level and seed of colonisation by local flora
    and the existing numbers of seed heads generated
    by individual plants.
  • Altitude contrasts in the formulation of the
    mixtures. Monitoring of the mosses that develop.

22
WIND CHILL / GERMINATION TRIAL
  • Perennial Rye Grass cultivars from STRI lists.
  • 20 cultivars selected and monitored at the
    following height
  • 1,000metres
  • 750metres
  • 500metres

23
IDENTIFYING GROWTH PATTERNS IN RAPIDLY CHANGING
TEMPERATURES
  • Example
  • 8 weeks 8th October to 30th November
  • Monitored growth and temperature at which plants
    become dormant

24
SCOTTISH NATIONAL HERITAGE APPROVED RENOVATION
MIXTURE SELECTED FOR THE CAIRNGORM PROJECT
25
(No Transcript)
26
Thank you for your attention
  • Have a nice day!
Write a Comment
User Comments (0)
About PowerShow.com