Renewable Power from Poultry Litter Presentation
by Eric Jenkins VP Commercial Development,
Fibrowatt LLC February 2007
2
Outline
  • What we do
  • How we do it
  • How to structure projects
  • Why it is worth doing

3
1. Fibrowatt has commissioned Americas
firstPoultry Litter Fuelled Power Plant
3
4
The 55MW Fibrominn Plant
Commissioning began in May 2007
4
5
Poultry Litter Fueled Power Plants
  • Generating renewable electricity from poultry
    litter
  • Well proven technology (14 year operating record
    in the UK)
  • Carbon neutral
  • Improves and protects water resources
  • Improves sustainability and biosecurity for
    poultry farmers
  • Recovering value from the nutrients by selling
    the ash fertilizer
  • Biomass power has an important place in rural
    communities

6
Who is Fibrowatt?
  • Fibrowatt LLC, based in PA
  • The founders built the worlds first three
    poultry litter fuelled power plants in the UK
  • Fibrowatts Minnesota plant is currently being
    commissioned
  • A 55 megawatt, 700,000 ton/year turkey litter
    plant
  • The first in the US
  • Development work began 1999
  • Financed with 202m of investment grade rated
    debt in December 2004
  • Commercial Operations will commence in August
    2007
  • 50MW Projects under development in North
    Carolina, Arkansas, Mississippi and Maryland

7
2. How Power From Poultry Litter Works
7
8
Poultry Houses
9
Covered Conveyor
10
Loading the Truck
11
Tarpaulin Cover
12
Truck on Scales
13
Fuel Delivery
14
Trucks Unloading
15
Thetford Fuel Hall
16
TruckCleaning
17
How it Works
18
Inside the Boiler
19
3. How to Jump-Start Projects
19
20
How Long Does It Take?
1. Development phase 2 - 4 years 2. Constructi
on phase 2 3 years TOTAL 4 7 YEARS
20
21
What Does It Cost?
1. Development phase 3-10M 2. Construction
phase 150-200M
21
22
What are the key requirements?
1. Fuel adequate fuel already
available 2. Sites multiple sites already
offered 3. Electricity contracts federal
incentives needed
22
23
Facilitating the Projects
  • 1.9 /kWh Production Tax Credit (45)
  • To level the playing field
  • Poultry Litter should get the same incentives as
    Wind
  • Placed-in-Service Deadline needs to be 7-10 years
    out
  • Our plants take 2-4 years to develop, design,
    permit finance
  • Construction takes at least a further 2½ years
  • Option to select 30 Investment Tax Credit
  • Same incentive as Solar Power
  • Ability to utilize tax-exempt bonds

23
24
4. Why it is worth doing
24
25
Multiple Benefits of our Plants
  • Renewable Energy
  • Producing green, carbon-neutral power from
    domestic resources
  • 750MW of identifiable projects
  • Pollution Reduction
  • Reducing groundwater contamination from excess
    animal waste
  • Agricultural Sustainability
  • Rural economic development
  • Enabling the poultry industry to maintain
    sustainable growth
  • Enhancing bio-security for poultry farmers
  • Supporting the Family Farmer

25
26
(No Transcript)
27
(No Transcript)
28
Challenge Opportunity
  • Renewable Power from Poultry Litter is
    (currently) more expensive than Coal
  • There is significant potential
  • The poultry industry is concentrated in Southern
    States, which have little wind resource
  • A viable renewable energy option for Southern
    States

28
29
The Carbon Cycle
CARBON (CO2)
Flue Gases
ENERGY
BEDDING FEED
ELECTRICITY
MANURE
BIOMASS
Ash
NUTRIENTS
Write a Comment
User Comments (0)
About PowerShow.com