Technology Update - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Technology Update

Description:

Exchanged one-set of bugs for another. Interoperability of Enterasys ... Friday June 4 2004 (Last day of academic year) Reasons for the End of Life on Campus ... – PowerPoint PPT presentation

Number of Views:34
Avg rating:3.0/5.0
Slides: 12
Provided by: EricS120
Category:

less

Transcript and Presenter's Notes

Title: Technology Update


1
Technology Update
  • TSAG Meeting 12/11/03

2
Outage Dec 20
  • Saturday 1000PM --gt Sunday 1200PM
  • PPM will be replacing electrical panel in the MDF
  • The MDF will have limited power during this time
  • Affected systems
  • All inter-building network connectivity
  • All Internet network connectivity
  • Hence all non-local (via subnet) services will be
    unavailable
  • Telephone systems will be operational
  • Intermittent outage just at the beginning and at
    the end of the outage window

3
Holiday Operations Coverage
  • Dec 25 Jan 1
  • On-call operator
  • Dec 26-31 Jan 2-4
  • On-duty operator 800am - 500pm
  • On-call operator during other times
  • Standard Off-hours (Network/Systems) Analysis
    Support

4
Email Quotas are being Applied
  • Enforcement is underway for
  • All new accounts
  • All student accounts (to be complete by Dec 15)
  • 100 MB limit for all accounts below this limit
  • Over quota No E-mail!
  • Faculty/Staff maximum email storage limits
  • 400 MB by Dec 15, 2003
  • 300 MB by Feb 15, 2004
  • 200 MB by March 15, 2004
  • 100 MB by April 15, 2004
  • E-mails those above 400MB (22 43), 25 still over
    quota
  • Yearly review of quotas by ATC is underway

5
TII Close-out
  • Summary
  • Stage 1 wiring, Stage 2 electronics
  • One of three campus within Phase 1 that are
    completed
  • Lessons Learned
  • Course Knowledge on Cisco Equipment
  • Exchanged one-set of bugs for another
  • Interoperability of Enterasys and Cisco
  • What remains
  • Return Enterasys equipment
  • We are short hubs to comply with our trade-in
    agreement (500 ports)
  • Give us your old, broken, worn huddled hubs!

6
Post TII Activities
  • CENIC (phase out of 4CNET)
  • Wireless Enhancements
  • Packeteer and Dragon
  • Intracampus Network ACLs
  • Classifying Subnets, e.g.,
  • Student Lab subnets
  • Administrative subnets
  • Open Area subnets (live jacks)
  • Authenticate to the wire (802.1X) ??

7
End of Life IPX and Appletalk
  • Original Announcement of Intent
  • TSAG Meeting, Nov Dec 2002
  • Proposed Last Date of support
  • Friday June 4 2004 (Last day of academic year)
  • Reasons for the End of Life on Campus
  • To reduce load on and to simplify management of
    Network Services
  • IPX is 20 of load for 5 of population
  • To reduce the load on NetWare/NDS servers
  • Novell and Apple have adopted pure IP
  • Your tasks
  • Migrate Novell/Apple services off of
    IPX/Appletalk
  • Need Netware 5 or above
  • Need Mac OS 8.1 or above
  • Provide early feedback on problems and concerns
  • Sourceshttp//www.novell.com/info/collateral/doc
    s/4621162.01/4621162.html
  • http//docs.info.apple.com/article.html?artnum308
    22

8
Campus IT Status Page
  • Summary information from Big Brother, MRTG,
    Spectrum, etc.
  • Provides
  • Summary status of Enterprise systems
  • Pending Maintenance Announcement (if any)
  • Black Lists
  • Spammers E-mail messages blocked
  • Irresponsible ISP or Host Internet
    connectivity blocked
  • Compromised Computers (ports disabled) Network
    connectivity blocked
  • Consult as part of IT diagnosis process

9
Registry of Computer Labs
  • ATC requested Campus-wide Lab Schedule
  • Intent To allow students to more easy locate IT
    resources
  • Information Needed
  • Location of Lab Purpose of the Lab
  • Provided Equipment (e.g., 24 Windows XP, )
  • Supported Users (e.g., only COMP 100 students)
  • Hours of Operation
  • Restricted Access
  • Open Access
  • Contact point for more info (e.g., URL)
  • We need you to provide the information

10
FISMA Audit Preparation
  • Financial Integrity and State Manager's
    Accountability (FISMA)
  • Focus has been on Mainframe type of operations
  • Higher focus on Client/Server types of operations
    (e.g., CMS)
  • Some Emphasis this year
  • Account Lifecycle
  • Access Controls Vendors, Passwords, Audit,
    Review,
  • Confidentiality Protection
  • DRP and BCP
  • Non-Enterprise level operations (more coming in
    the future)
  • We will starting preliminary discussions with
    local IT units

11
ProposalBlocking Administrative Lists
  • We have three types of lists
  • -l_at_csun.edu Department/Official Lists
  • -c_at_csun.edu Class Lists
  • -g_at_csun.edu General Purpose Lists
  • Goal to prevent spam on Administrative lists
  • Tested with tsag-l_at_csun.edu (thanks Peter!)
  • Ramification
  • Only individuals with a campus accounts can send
    e-mail to Administrative Lists
  • Home users use Webmail or configure e-mail
    client to use SMTP.csun.edu
  • But whatif I dont want my list blocked!
  • Transform your list to a -g list (e.g.)
  • Set up your list to Reply-to the owner
Write a Comment
User Comments (0)
About PowerShow.com