Guadalupe Watershed Model Year 1 - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Guadalupe Watershed Model Year 1

Description:

Guadalupe Watershed Model Year 1 – PowerPoint PPT presentation

Number of Views:49
Avg rating:3.0/5.0
Slides: 20
Provided by: Miche96
Category:

less

Transcript and Presenter's Notes

Title: Guadalupe Watershed Model Year 1


1
Guadalupe Watershed ModelYear 1
Item 3b
  • Presentation to SPLWG Dec. 8, 2008
  • Michelle Lent, John Oram, Lester McKee

2
Item 3b
  • Basic Objective
  • To understand the source, release, and transport
    of suspended sediment, Hg and PCBs from Guadalupe
    Watershed to San Francisco Bay
  • Timeline
  • Year 1 (2008) Hydrologic model
  • Year 2 (2009) Sediment and contaminants model
  • Details (The how, what, and why)
  • Estimate/confirm mercury and PCB loads
  • Determine proportional loads
  • When, and from where, are constituents
    transported
  • Assess potential effects of BMPs
  • Refine assumptions of the Hg TMDL

3
Watershed Modeling Overview
Item 3b
Hydrological Simulation Program - FORTRAN (HSPF)
4
Required Hydrology Model Inputs
Item 3b
  • Meteorological data
  • Precipitation
  • 15 min. data from SCVWD
  • Evapotranspiration
  • Hourly data from CIMIS
  • Geographic data
  • Topography
  • 30 m DEM from NED
  • Landuse data
  • ABAG 2000 Landuse map
  • Soil data
  • Hydrologic Soil Group map from SCVWD
  • Water import/export data
  • Reservoir releases
  • 15 min. data from SCVWD
  • Diversions
  • 15 min. data from SCVWD


5
Data Richness of Guadalupe River Watershed
Item 3b
6
Watershed Delineation
Item 3b
7
Subbasin Delineation
Item 3b
8
Meteorological Segmentation
Item 3b
9
Calibration/Validation Process
Item 3b
Adjust parameters and/or model setup
Run model compare output to WY 2000 - 2005
data
No
Satisfactory performance?
Yes
Run model compare output to WY 2006-2007 data
10
Calibration Sites
Item 3b
  • Guadalupe River
  • Most downstream gauge
  • Canoas Creek
  • Mostly urban/developed
  • Mostly low elevation
  • Not reservoir fed
  • Guadalupe Creek
  • Mostly undeveloped
  • Mostly higher elevation
  • Reservoir fed

11
Model Calibration - Annual Flow
Item 3b
Guadalupe River
12
Model Calibration - Daily Flow
Item 3b
Guadalupe River
13
Model Calibration - Hourly Flow
Item 3b
Guadalupe River
14
Model Validation - Annual Flow
Item 3b
Guadalupe River
15
Model Validation - Daily Flow
Item 3b
Guadalupe River
16
Model Validation - Hourly Flow
Item 3b
Guadalupe River
17
Summary of Model Performance
Item 3b
  • Captures general watershed hydrology
  • Captures storm events
  • Needs improvement for
  • Annual flow volume
  • Base flow
  • Storm event peak flow and timing

18
Model Improvement Plan
Item 3b
  • Extend calibration period
  • Add urban irrigation into model
  • Revise imperviousness estimates
  • Adjust meteorological segmentation
  • Re-evaluate calibration parameters

19
Model Application
Item 3b
Write a Comment
User Comments (0)
About PowerShow.com