Title: Transition from SKADS to PrepSKA
1Transition from SKADS to PrepSKA
- Richard Schilizzi
- Lisbon, 3 October 2008
2PrepSKA deliverables
- Produce a deployment plan for the full SKA and a
detailed costed system design for Phase 1 - Integrate all of the activities, reports, and
outputs of the various working groups to form an
SKA implementation plan including a build plan -
- proposal for construction funding in 2012
3PrepSKA Work Program
- WP1 PrepSKA management
- WP2 Costed telescope design
- WP3 Further site characterization in Australia
and Southern Africa - WP4 Governance
- WP5 Procurement and involvement of industry
- WP6 Options for funding
- WP7 Impact on broad government priorities
4PrepSKA
5SKA timeline
SKA-midlow Complete
Site Select
Reference Design selected
SKA Pathfinders Complete
Phase 1 complete
Preliminary SKA specs
External Engineering Review of design
Sites short-listed
Pathfinder science
Full science operations SKA midlow
Early Science SKA midlow
06 08 10 12 14 16 18 20
22 24
System Design
SKA mid low construction and commissioning
Concept Design
Detailed Design/Phase 1 construction and
commissioning
SKA-high Construction
Design Studies /Pathfinder Suite Construction
System design SKA-hi
Concept design for SKA-high
6WP2 deliverables(Peter Dewdney Guiding
Principles, Activities and Targets for WP2)
- Technology selection
- System Design
- including operational construction tradeoffs
- Science Performance vs Reference Science Mission
- Total cost estimate for Baseline Design (incl.
contingency) - Risk assessment
- Design and deployment plan
- Top-level build schedule
- Upgrade paths
7National PrepSKA SKADS TDP LOFAR ASKAP KAT7
ATA EVLA MWA eMERLIN eEVN Path2SKA
8Approach
- Focus WP2 Description of Work in a different way
- Move from 40 technology development tasks,
including an ill-defined IVS to assembly and
verification of large SKA sub-systems - identify and fill gaps
- Note Need an integrated systems approach at
sub-unit level, eg - Feed dish design LNA feed design
- Dish Verification Program
- PAF Verification Program
- AA Verification Program
- Signal transport Verification Program
- ..
9Original WP2 technology matrix
10Dish Verification Program
11WP2 approach
- Required parameter space can be covered with a
small no. of models - Contributing institutions contribute designs to
several models - Verification Programs will need to include a
build and test phase, on the way to deriving the
cost by 2012Q1 (end of PrepSKA) - VPs are self-evaluating
- SKA Design Studies and Pathfinders provide the
RD basis for the VPs - Need to target those aspects that map into the
SKA - Documentation essential
- Effectively evaluate the feasibility of
implementations outlined in Memo 100
12Representative implementations Phase 1
13Representative implementations Phase 2
14SPDO in the PrepSKA era
15SPDO Engineering Team
- Project Engineer Peter Dewdney
- System Engineer Kobus Cloete
- Domain Specialist Receptors Neil Roddis
- Domain Specialist Signal Transport Roshene McCool
- Domain Specialist Computing Duncan Hall
- Software
- Domain Specialist Signal Processing advertised
- Site Engineer Rob Millenaar
- Project Management Officer interviews next week
16Liaison Engineers
- Senior engineering managers
- Roles
- Lead design teams for which the Lead Institution
has assumed responsibility - Serve as communication person for relations
between SPDO and Lead Institution
17WP2 Schedule
- SPDO staffing, familiarisation and training
(ongoing) - Appoint liaison engineers (ongoing)
- WP2 Kickoff meeting, 10-14 Nov (Deliverable 1)
- MoAs with organisations/lead institutions
(ongoing) - Review Reference Science Mission, Dec08
- State of SKA technology
- call for documentation (Jan 09)
- Review by International Engineering Advisory
Committee, Mar 09 (Deliverable 2)
18WP2 deliverables