Title: HOMEGUARD READINESS
1CVN-71/CVW-8
Operation Iraqi Freedom (SEP05 MAR06)
7 JUNE 2006
CDR Craig Washington AIMD Officer
CDR Tim OBrien Supply Officer
LCDR Gerald Cook CVW-8 Maintenance Officer
2OUTLINE
- Introductions
- CVW-8 Maintenance
- AIMD Support
- Supply Support
- Summary
3IntroductionsTR Carrier Strike Group
4Introductions The Triad
SUPPO Supply Officer (TR) AIMDO Aircraft
Intermediate Maintenance Department Officer, AKA
FIXO (TR) CAGMO Airwing Maintenance Officer
(CVW-8)
5IntroductionsThe Triad
SQUADRON (The Customer)
Request NRFI
RFI Parts (EXREP)
RFI Parts
NRFI Induction, Parts
SUPPLY (Inventory Expediting)
AIMD (Repair)
Offship Reqn, Stock Replen
Parts requests, BCM, RFI
Receipts
The Providers
6IntroductionsDeployment Info
- 1 Sep 05 11 Mar 06
- 192 days away from homeport
- 156 days at sea
- On station in NAG from 5 Oct 7 Feb
- 97 fly days out of 99 days on the line
- 56 instances of ordnance expended
7CVW-8 MAINTENANCE
- CVW-8 Team
- CVW-8 Squadrons/Readiness
- Deployment Statistics
- Maintenance/Logistic Support Challenges
8CVW-8 Team
9CVW-8 Deployment Statistics
- Flight Hours 30,630
- Sorties Completed 10,500 (98.72)
- RFT 6 of 7 squadrons maintained average
- Mission Capability Rate 82
- Full Mission Capability Rate 79
- Engine Changes 56
- External/Internal FOD 8/4
- Other 44
- OIF Cannibalization Actions 2,406
- ROVER installed in 22 TOMCATS (F-14s)
10Aircraft Readiness 10FEB06 / JD 6041 (0700)
11Rotary Wing
12Mission Systems
13Deployed Capability
14Ready for Tasking
15AL ASAD
16Dirt Detachment Challenges
- Environment
- Maintenance Learning Curves
- Logistics Issues
- Body Armor, DCUs, Weapons/Quals,
- Transportation of personnel/equipment
- Support Equipment (Ali Al Salem)
- Parts Support (AFM/AVDLR)
- Al ASAD (MALS Supply/MMFs)
- EA6Bs TR SUPPO Pack-up/ Whidbey Island AFM
Pack-up - F/A-18 TR SUPPO Pack-up
- Ali Al Salem (non-existent)
17AIMD
- AIMD TEAM
- Deployment Statistics
- Deployment Challenges
18AIMD Organization
AIMD OFFICER CDR C. Washington
AIMD AMO LTC. Haas
Quality Assurance LCDR Simon AZCS Givens
Maintenance/Material LCDR Nolte MMCO AFCM
Bennett - MMCPO
Administration ATC Hoard - LCPO
Manpower, Personnel Training Coordinator AVCM
Kadi
Production Control ATCS Carillo ADCS Torbert ATCS
Hubbell
Supply Department
Material Control SK1 Williams
General Maint IM-2 LT Phillips ADCS Duranjacome
3M/DC ASC Mejorada AS1Bondoc
AV/ARM IM-3 LT Haas CWO2 Moes ATCS Maurin
SE MAINT IM-4 LT Horsey ASCS Cordero ASCS Elswick
Power Plants ADCS Wheeler
Airframes AMC Nichols
ALSS PRC Roa
Avionics ATCS Rodriguez ATC Emmendorfer ATC
Solomon ATC Patrick ATC Oren
Armament Equipment AOC Brennan
19AIMD TEAM
- AIMD CORE
- 240 Bench Technicians
- Includes SE, Test Cell, Cal Lab, Admin, etc.
- SEAOPDET
- 160 I-level technicians
- I-level Augment from shore AIMDs
- Bring specialized skill to match bench to WRA
20AIMD Stuff
- Responsible for 9,980 IMRL assets with a total
value in excess of 120,000,000 - 300 major aircraft component test fixtures
- Forty-seven production work centers
21AIMD Deployment Statistics
- gt 50,000 Components Inducted
- gt 300,000 Manhours expended
- Repair Rate
- gt 70 - All inductions
- gt 97 - Excluding auto-BCM (BCM-1s)
22AIMD Inductions
The brown area represents the average number of
inductions TRs AIMD received as compared to
fleet averages during recent deployments.
23AIMD BACKLOG
24AIMD AWP