A focus on alleviating the build up of surface water on the mall and meeting ... TEAL = Stormwater 360 Treatment Unit. Phase II Cost Analysis. Estimated Project Cost ... – PowerPoint PPT presentation

Number of Views:46
Avg rating:3.0/5.0
Slides: 23
Provided by: nathanpat
Category:

less

Transcript and Presenter's Notes

Title: UMaine Drainage Improvements A focus on alleviating the build up of surface water on the mall and me


1
UMaine Drainage ImprovementsA focus on
alleviating the build up of surface water on the
mall and meeting discharge requirements into
Stillwater River set by DEP
NATO Name Hotel
2
Members of Team Smahties
  • Nathan Belz (aka Jeff Goldblum)
  • Anthony Dumais (aka Jesse Bradford)
  • Stephen LaPlante (aka John Belushi)
  • Nathan Seguin (aka Napoleon Dynamite)
  • Ian Simpson (aka Jason Statham)

3
Primary Contacts
  • UMaine Facilities Management
  • Ron Brown
  • Brian Foley
  • CES, Inc.
  • Shawn Small, PE
  • Contech (Stormwater 360)
  • Richard Tibbetts, Sales Engineer
  • Invisible Structures (Rainstore)
  • Kevin Cobaugh, Sales Engineer

4
Problem Identification
  • Puddles on the University Mall make travel
    inconvenient for pedestrians and are
    aesthetically unappealing
  • Improper grading of the Mall
  • Lack of drainage to move surface water away from
    Mall
  • Discharge into Stillwater River does not meet DEP
    standards and regulations
  • Increase in impervious areas on campus
  • Editorial published in Maine Campus on October
    27, 2005 We Need to Clean Up Our Ugly Mall

5
(No Transcript)
6
(No Transcript)
7
Schedule of Events
8
Phase I
Drainage Improvements on The UMaine Mall
  • Perform hydraulic analysis of the Mall
  • Install French Drains along pedestrian walkways
    for storm water runoff collection
  • Tie French Drains into the current storm water
    collection system that exists in Drainage Region
    5
  • Regrade the Mall to facilitate drainage of
    surface water towards the French Drains

9
Hydraulic Analysis of The Mall
  • Land area 4 acres
  • Obtained data from USDA TR-55 Method (Developed)
  • 2-Year Event gt 4.2 ft³/s
  • 10-Year Event gt 7.4 ft³/s
  • 25-Year Event gt 9.2 ft³/s
  • Discharge to be used in French Drain Design based
    on 25-year event gt 9.2 ft³/s

10
Install French Drain and Regrade the Mall
  • French Drain Dimensions
  • 18 wide x 24 deep
  • 1800 linear feet of 6 perforated pipe
  • 2 slope from center of Mall towards French
    Drains

11
Tie French Drain System into Existing Drainage
Structure
  • Use two Type F catch basins to tie French Drain
    system into existing

12
Phase I Cost Analysis
13
Phase II
Hydraulic Analysis and Design for UMaine Storm
Water Drainage Region 5
  • Hydraulic analysis of current Drainage Region 5
    using TR-55 Method
  • Design of water retention and treatment
    facilities in proximity to Stillwater River based
    on 25-year storm event
  • RainStore³ Retention Facility
  • Stormwater 360 Treatment Unit

14
(No Transcript)
15
Hydraulic Analysis of UMaine Storm Water Drainage
Region 5
  • Land area 20 acres
  • Obtained data from USDA TR-55 Method (Developed)
  • 2-Year Event gt 21 ft³/s
  • 10-Year Event gt 37 ft³/s
  • 25-Year Event gt 46 ft³/s
  • Discharge to be used in retention and treatment
    design based on a 25-year event gt 46 ft³/s

16
Water Treatment Facility
  • Used 25-year storm event storage volume to design
    a Vortechs water treatment facility
  • Vortechs Model 1000
  • 9 long x 6 wide x 7 deep
  • Removes sediment, trash, free oil grease

17
Water Retention Facility
  • Used 25-year storm event storage volume to design
    retention facility with Rainstore³ Estimator
  • 13,557 units
  • Chamber size gt 95 x 128 x 4 deep
  • Capacity of 45,000 ft³ of water (336,000 gallons)
  • Obtained design details and technical
    specifications from Rainstore³ site
  • Place Rip Rap around opening of outlet pipe to
    prevent erosion

18
94 Void space provides 25 gallons of water
storage per unit
19
Proposed Facility Locations
GREEN Rainstore³ Retention Facility TEAL
Stormwater 360 Treatment Unit
20
Phase II Cost Analysis
21
Estimated Project Cost
  • Phase I 158,000
  • Phase II 477,000
  • Total Project Cost 635,000

22
Questions???
Write a Comment