Title: OPS 571 Final Exam Latest UOP Course Assignments
1OPS 571 Final Exam
Copyright. All Right Reserved By
www.uopetutors.com
2- 1. Which of the following is considered a major
process flow structure? - Lead Time
- Fabrication
- Lean Manufacturing
- Project
- 2. ISO audits result in certifications that are
done by first, second, or third parties. Which of
the following result in the best certification of
a firm? - Certification is sought by any firm assuming they
pay annual dues. - 2nd Party where a customer audits its supplier
- 3rd Party where a qualified national or
international standards/certifying agency serves
as an auditor - 1st Party where a firm audits itself against
ISO standards - Find the final exam answers here OPS 571 Final
Exam - 3. Which of the following is ISO 14000 primarily
concerned with? - Quality management
- Time management
- Continuous improvement management
- Environmental management
Copyright. All Right Reserved By
www.uopetutors.com
3- 4. Which is the one correct value stream
principle? - Look for efficiencies in the factory, office,
physical, procedural, and technical operations. - Eliminate waste that stops, slows down, or
diverts the value stream. - Concentrate on speeding up value-adding
operations rather than removing waste. - Keep the value stream moving at minimum velocity.
- 5. What is the starting point in developing a
capacity plan for a health care operation? - Determining the effective capacity over time
- Estimating design capacity
- Forecasting patient demand for a reasonable
length of time - Discovery of the bottleneck operation
- 6. Which of the following is considered an
organizational blueprint, which prescribes the
quantity and time frame for when each end product
will be assembled? - MRP (Material Requirements Plan)
- ERP (Enterprise Resource Planning)
- MPS (Master Production Schedule)
- WBS (Work Breakdown Structure)
Copyright. All Right Reserved By
www.uopetutors.com
4- 7. Which of the following is an element that
addresses elimination of waste under lean
production? - Kanban production control system
- Production ahead of demand
- Minimized run times
- Group plant loading technology
- Click here and download OPS 571 Complete Course
- 8. In most cases, demand for products or services
can be broken into several components. Which of
the following is considered a component of
demand? - Level elements
- Future elements
- Past elements
- Cyclical elements
- 9. Design for manufacturing and assembly delivers
product improvements by emphasizing which of the
following - Reducing product quality during the assembly
process - Designing products so they can be manufactured by
a virtual factory - Reducing equipment in the production process
- Simplification of the product by reducing the
number of separate parts
Copyright. All Right Reserved By
www.uopetutors.com
5- 10. Which of the following is one of the
principles of reengineering? - Quality at the source
- Do not select suppliers on the basis of price
alone. - Have those who use the output of a process
perform the process. - Leverage high cost employees with lower cost
employees. - 11. Which of the following is a characteristic
that can be used to guide the design of service
systems? - Services are all similar.
- Services businesses are inherently
entrepreneurial. - Quality work means quality service.
- Services cannot be inventoried.
- 12. Considering Hau Lees uncertainty framework
for classifying supply chains, which of the
following is given to a supply chain which has an
evolving supply process based on functional
products? - Risk hedging
- Forward looking
- Efficient
- Agile
Copyright. All Right Reserved By
www.uopetutors.com
6- 13. There are many applications of poka-yokes in
service organizations. Which of the following is
one of the three-T's used to classify poka-yokes? - Trust
- Teamwork
- Task
- Time
- Want help? Click to download OPS 571 Entire
Course - 14. Which of the following is a major factor that
distinguishes service design and development from
manufacturing design and development? - The service package has the same legal protection
available to manufactured goods. - Manufacturing is far more capital intensive than
services. - The service process and service product can be
developed independently. - The service package is the major output of the
development process. - 15. A project can be segmented into which of the
following? - Events
- Sub-jobs
- Work packages
- Success markers
Copyright. All Right Reserved By
www.uopetutors.com
7- 16. Which of the following is a cost impact and
payoff analysis tool from the operations
consulting tool kit? - Statistical tools
- Decision trees
- Work sampling
- Gap analysis
- 17. According to the theory of constraints, which
of the following can be a capacity-constrained
resource (CCR)? - Product design
- Inoperable equipment
- An employee
- A customer
- 18. The ability to rapidly and inexpensively
switch production from one product to another
enables which of the following - Economies of shape
- Economies of size
- Economies of scale
- Economies of scope
Copyright. All Right Reserved By
www.uopetutors.com
8- 19. According to the theory of constraints, which
of the following financial measurements can be
used to measure the firm's ability to make money? - Operating expenses
- Dividends
- Sales
- Return on investment
- Click here to download Complete Answers of OPS
571 Week 1 Complete - 20. Demings PDCA (plan, do, check, and act)
cycle underlies what inherent Six Sigma
principle? - Continuous improvement
- Control charting
- Standard deviation
- Project management
- 21. Which of the following is usually included as
an inventory holding cost? - Order placing
- Quantity discounts
- Breakage
- Typing up an order
Copyright. All Right Reserved By
www.uopetutors.com
9- 22. Which production process term best describes
the situation when activities in a stage of
production must stop because there is no work? - Blocking
- Starving
- Staging
- Buffering
- 23. In a Gantt chart the vertical axis represents
which of the following? - Time
- Revenue
- Tasks
- Cost
- 24. The Shingo system states that the way to
prevent defects from coming out at the end of a
process is to do which of the following - Redesign the process in order to mitigate the
bottlenecks. - Utilize SQC (statistical quality control).
- Introduce controls within the process.
- Slow down production rates until the process is
in control.
Copyright. All Right Reserved By
www.uopetutors.com
10- 25. Which of the following terms describes the
time a unit spends actually being worked on
together with the time spent waiting in a queue? - Flow time
- Build time
- Cycle time
- Run time
- Quiz Answers just a click away OPS 571 Week 1
Quiz - 26. Which of the following is one of Dr. Eli
Goldratt's rules of production scheduling for
optimized production technology? - An hour saved at a bottleneck operation does not
increase the process flow. - If you lose an hour at a bottleneck it is better
than making scrap. - Do not allow bottlenecks to govern the flow of
the line. - Utilization and activation of a resource are not
the same. - 27. During the implementation of a project, which
of the following should be the primary focus of a
consulting firm? - The correct project software
- Application of the learning curve theory
- Tools and materials availability
- People management skills
Copyright. All Right Reserved By
www.uopetutors.com
11- 28. Which of the following is an analytical tool
used in Six-Sigma quality improvement programs? - Gantt charts
- Pareto charts
- Tree charts
- Pedigree charts
- 29. A project manager must consider several
components when overseeing the planning process
of aggregate operations specifically, whether
such components are factors that are internal or
external to the organization. Which of the
following factors would be classified as an
internal component for an organization? - Inventory levels and economic conditions
- Market demand and subcontractor capacity
- Current physical capacity and current workforce
- Competitor behavior and current workforce
- Download Complete Answers OPS 571 Week 1 Complete
- 30. Which of the following is the net requirement
using an MRP program if the gross requirement is
10,000 and the inventory on hand is 4,000? - 10,000
- 14,000
- 6,000
- 4,000
Copyright. All Right Reserved By
www.uopetutors.com
12- About Author
-
- This article covers the topic for the University
Of Phoenix OPS 571 Final Exam. The author is
working in the field of education from last 5
years. This article covers the basic of OPS 571
Final Exam Assignment from UOP. Other topics in
the class are as follows -
- OPS 571 Week 1 DQ 1
- OPS 571 Week 1 DQ 2
- OPS 571 Week 1 DQ 3
- OPS 571 Week 1 DQ 4
- OPS 571 Week 1 Process Design Matrix and Summary
- OPS 571 Week 1 Quiz (Latest)
- OPS 571 Week 1 Complete
- OPS 571 Week 2 DQ 1
- OPS 571 Week 2 DQ 2
- OPS 571 Week 2 DQ 3
- OPS 571 Week 2 DQ 4
- OPS 571 Week 2 Process Designs and Supply Chains
Copyright. All Right Reserved By
www.uopetutors.com
13- OPS 571 Week 2 Quiz (Latest)
- OPS 571 Week 2 Complete
- OPS 571 Week 3 DQ 1
- OPS 571 Week 3 DQ 2
- OPS 571 Week 3 DQ 3
- OPS 571 Week 3 DQ 4
- OPS 571 Week 3 DQ 5
- OPS 571 Week 3 Process Designs and Supply Chains
Part II - OPS 571 Week 3 Quiz (Latest)
- OPS 571 Week 3 Complete
- OPS 571 Week 4 DQ 1
- OPS 571 Week 4 DQ 2
- OPS 571 Week 4 DQ 3
- OPS 571 Week 4 DQ 4
- OPS 571 Week 4 Supply Chain Design Paper
- OPS 571 Week 4 Quiz (Latest)
Copyright. All Right Reserved By
www.uopetutors.com
14- OPS 571 Week 4 Complete
- OPS 571 Week 5 DQ 1
- OPS 571 Week 5 DQ 2
- OPS 571 Week 5 DQ 3
- OPS 571 Week 5 DQ 4
- OPS 571 Week 5 Project Management Recommendation
- OPS 571 Week 5 Quiz (Latest)
- OPS 571 Week 5 Complete
- OPS 571 Week 6 DQ 1
- OPS 571 Week 6 DQ 2
- OPS 571 Week 6 DQ 3
- OPS 571 Week 6 DQ 4
- OPS 571 Week 6 Process Improvement Presentation
- OPS 571 Week 6 Quiz (Latest)
- OPS 571 Week 6 Complete
- OPS 571 Week 6 Final Exam
-
- Want to check other classes..?? Visit
www.uopetutors.com
Copyright. All Right Reserved By
www.uopetutors.com