Parkwest Phase 2 Bangalore Pre launch PDF Details

About This Presentation
Title:

Parkwest Phase 2 Bangalore Pre launch PDF Details

Description:

Shapoorji Pallonji Parkwest Phase 2 is Located in central Bangalore, Parkwest is the largest residential development within the city limits. Parkwest phase 2 Apartment is part of west Bangalore. Its connectivity is what catches buyer’s attention. All the projects of shapoorji are to have increase in its value. From Binnypet, it has a short Proximity to prominent residential areas like Chamrajpet, Basavangudi, Malleshwaram, Rajajinagar, Jayanagar and Vijaynagar – PowerPoint PPT presentation

Number of Views:23

less

Transcript and Presenter's Notes

Title: Parkwest Phase 2 Bangalore Pre launch PDF Details


1
PROJECT INFORMATION DOCKET
A Project By
2
From the house of Shapoorji Pallonji
  • Legacy of 150 years of expertise in building
    residential, commercial and industrial structures
  • Group Turnover of US 3 billion with over 35000
    employees
  • The first Indian construction company to enter
    the Middle East in the 1970's.
  • List of architectural landmark include ITPL
    Bangalore, The Imperial tallest residential
    tower in India, Mantri Pinnacle tallest
    residential tower in South India, the palace of
    the Sultan of Oman among many others

SP Group Companies
The Imperial, Mumbai
3
Parkwest Phase 2 Bangalore have dedicated us to
manufacturing a bequest of power for all our
customers. It is solitary of the guiding realty
budding company of the nation by way of having
attempt on a quantity of projects recitals to the
industry. The group had started off single of its
sole residential schemes by the heading
of Parkwest Phase 2 Binnypet, Magadi
Road Bangalore which has countless unmatched
amenities. The location where the growth
assignment is situated is a well-enlarged area in
addition to be growing within additionally
apparently to become single of the extremely cosy
areas in Bangalore City.
http//www.parkwest.ind.in/
4
Parkwest Phase 2 Specification General
Specifications for Olive, Mulberry and
Emerald Structure          Earthquake resistant
structure (Seismic Zone II compliant)         
Flat plate structure, block masonry         
9.3 Floor to ceiling clear height Plastering    
      Internal walls smoothly plastered and
finished with wall care putty Painting
Polishing          Interior walls finished with
acrylic emulsion paint ceiling with water/ oil
bound distemper          Exterior walls with
textured/emulsion paint          Enamel paint
for internal doors          Enamel paint for MS
railings          PU/Melamine polish on both
sides of main door          Maids room walls
ceiling with water / oil bound distemper Flooring
         Vitrified flooring for living, dining
and family areas          Vitrified flooring in
master bedroom and other bedrooms         
Vitrified flooring in Kitchen          Anti skid
ceramic flooring in balcony Utility
area          Ceramic flooring for Maids room
5
Parkwest Phase 2 Master Plan
Write a Comment
User Comments (0)