CMRP Practice Test

About This Presentation
Title:

CMRP Practice Test

Description:

Are you looking for the best study material of CMRP exam? Now take a deep breath and visit Certs4you for the best and accurate study material of CMRP. We provide you real exam questions at cheap price so everybody can afford it easily. We will ensure you that you will pass your exam in first attempt. Pass your exam in just 24 hours by the help of our CMRP Practice Questions. Visit us for more discount packages and for more information. – PowerPoint PPT presentation

Number of Views:26

less

Transcript and Presenter's Notes

Title: CMRP Practice Test


1
SMRP CMRP - Certified Maintenance Reliability
Professional exam in just 24 HOURS! 100 REAL
EXAM QUESTIONS ANSWERS SMRP CMRP - Certified
Maintenance Reliability Professional Buy
Complete Questions Answers File
from http//www.certs4you.com/SMRP/CMRP-dumps.html
100 Exam Passing Guarantee Money Back
Assurance
Sample Questions
2
  • Question No 1
  • Return on Assets (ROA) is determined by
  • Net income/Total assets
  • Gross income/Total assets
  • Revenue/Total assets
  • Net income/Maintenance costs
  • Answer C Question No 2
  • As the maintenance manager at a new plant
    (facility) you are developing the maintenance
    workforce strategy for start-up. Select the best
    workforce attributes for maximum effectiveness,
    assuming that unit labor costs are equal
  • An annual bid and selection of a maintenance
    labor contractor is performed, using unitcosting
    of tasks normally required.
  • A managing contractor is brought on site to
    handle all aspects and provision of maintenance
    labor.
  • Multi skilled mechanical crafts (trades) and
    instrument electrical crafts (trades) are hired
    and developed.
  • Operations performing minor maintenance and
    company multi-skilled technicians
  • performing complex maintenance tasks.
  • Answer D Question No 3
  • Which of the following are leading tools or
    techniques to identify Maintenance and
    Reliability process improvements?
  • Total Productive Maintenance
  • Reliability Centered Maintenance
  • Historical analysis of spending patterns
  • Process benchmarking with industry leaders

3
  • Question No 4
  • For the oil in a pressurized lubrication system,
    oil samples for analysis and trending should be
    taken from
  • The center of flowing oil line upstream of the
    oil filter, to assure that the sample is
    representative of the oil leaving the lubricated
    components.
  • The center of a flowing oil line downstream of
    the oil filter, to assure that the sample is
    representative of the oil being supplied to the
    lubricated components.
  • A low point in the oil sump, to assure that the
    sample includes wear particles, water, and other
    contaminants that may have settled out of the
    oil.
  • The oil sump at a point above the bottom, to
    assure that the sample does not include
  • wear particles, water, and other contaminants
    that may have settled out of the oil.
  • Answer D Question No 5
  • What are the three most significant constraints
    when developing a Maintenance and
    Reliability-organization?
  • Engineering/Human/Resources/Budget
  • Budget/Operations/People
  • Culture/People/Resources
  • Culture/Engineering/Budget
  • Answer C Question No 6
  • The 'Karl Fischer Method' measures
  • The count in parts per million (ppm), of coliform
    bacteria in a sample of cooling tower water.
  • The viscosity of an oil sample based on its flow
    rate through a calibrated orifice.
  • The conductivity in micro-ohms, of a sample of
    cooling tower water.
  • The amount of water in a sample of oil, in ppm.

4
  • Question No 7
  • When developing and presenting a new strategic
    plan to stakeholders, which of the following is
    the most important?
  • Implementation timetable
  • Gaining the trust of stakeholders
  • Craft (trade) flexibility
  • Establishment of a common goal
  • Answer B Question No 8
  • On Monday, the maintenance manager sent an e-mail
    memo to the production manager saying that the
    date and time of the next planned outage would be
    on the third shift of the coming Friday. When
    the maintenance manager arrived at the unit on
    Friday third shift, the equipment was still
    operating at full capacity. The operator said he
    knew nothing of a planned outage and he had to
    make up production on this shift. Which of the
    following is the most likely reason the
    equipment was still running?
  • The maintenance manager did not know if the
    production manager had communicated the plan to
    the shift leader.
  • The maintenance manager did not know if the
    production manager received his e-mail
    communication.
  • The maintenance manager made a unilateral
    decision it was time to do the outage.
  • The maintenance manager did not know if the
    production schedule allowed for the planned
    downtime.
  • Answer C Question No 9
  • Reliability predictions are often expressed in
    terms of Mean Time Between Failures (MTBF) or
    its reciprocal The reciprocal is known as the
  • Failure Rate.
  • Failure Mode.
  • Mean Time To Failure.
  • Service Life.
  • Answer A

5
  • Buy Complete Questions Answers File from
  • PDF Version Test Engine Software Version
  • 90 Days Free Updates Service
  • Valid for All Countries

http//www.certs4you.com/SMRP/CMRP-dumps.html
Write a Comment
User Comments (0)