2- Question No 1
- Return on Assets (ROA) is determined by
- Net income/Total assets
- Gross income/Total assets
- Revenue/Total assets
- Net income/Maintenance costs
- Answer C Question No 2
- As the maintenance manager at a new plant
(facility) you are developing the maintenance
workforce strategy for start-up. Select the best
workforce attributes for maximum effectiveness,
assuming that unit labor costs are equal - An annual bid and selection of a maintenance
labor contractor is performed, using unitcosting
of tasks normally required. - A managing contractor is brought on site to
handle all aspects and provision of maintenance
labor. - Multi skilled mechanical crafts (trades) and
instrument electrical crafts (trades) are hired
and developed. - Operations performing minor maintenance and
company multi-skilled technicians - performing complex maintenance tasks.
- Answer D Question No 3
- Which of the following are leading tools or
techniques to identify Maintenance and
Reliability process improvements? - Total Productive Maintenance
- Reliability Centered Maintenance
- Historical analysis of spending patterns
- Process benchmarking with industry leaders
3- Question No 4
- For the oil in a pressurized lubrication system,
oil samples for analysis and trending should be
taken from - The center of flowing oil line upstream of the
oil filter, to assure that the sample is
representative of the oil leaving the lubricated
components. - The center of a flowing oil line downstream of
the oil filter, to assure that the sample is
representative of the oil being supplied to the
lubricated components. - A low point in the oil sump, to assure that the
sample includes wear particles, water, and other
contaminants that may have settled out of the
oil. - The oil sump at a point above the bottom, to
assure that the sample does not include - wear particles, water, and other contaminants
that may have settled out of the oil. - Answer D Question No 5
- What are the three most significant constraints
when developing a Maintenance and
Reliability-organization? - Engineering/Human/Resources/Budget
- Budget/Operations/People
- Culture/People/Resources
- Culture/Engineering/Budget
- Answer C Question No 6
- The 'Karl Fischer Method' measures
- The count in parts per million (ppm), of coliform
bacteria in a sample of cooling tower water. - The viscosity of an oil sample based on its flow
rate through a calibrated orifice. - The conductivity in micro-ohms, of a sample of
cooling tower water. - The amount of water in a sample of oil, in ppm.
4- Question No 7
- When developing and presenting a new strategic
plan to stakeholders, which of the following is
the most important? - Implementation timetable
- Gaining the trust of stakeholders
- Craft (trade) flexibility
- Establishment of a common goal
- Answer B Question No 8
- On Monday, the maintenance manager sent an e-mail
memo to the production manager saying that the
date and time of the next planned outage would be
on the third shift of the coming Friday. When
the maintenance manager arrived at the unit on
Friday third shift, the equipment was still
operating at full capacity. The operator said he
knew nothing of a planned outage and he had to
make up production on this shift. Which of the
following is the most likely reason the
equipment was still running? - The maintenance manager did not know if the
production manager had communicated the plan to
the shift leader. - The maintenance manager did not know if the
production manager received his e-mail
communication. - The maintenance manager made a unilateral
decision it was time to do the outage. - The maintenance manager did not know if the
production schedule allowed for the planned
downtime. - Answer C Question No 9
- Reliability predictions are often expressed in
terms of Mean Time Between Failures (MTBF) or
its reciprocal The reciprocal is known as the - Failure Rate.
- Failure Mode.
- Mean Time To Failure.
- Service Life.
- Answer A
5- Buy Complete Questions Answers File from
- PDF Version Test Engine Software Version
- 90 Days Free Updates Service
- Valid for All Countries
http//www.certs4you.com/SMRP/CMRP-dumps.html