Title: April 6, 2006


1
Orleans Parish School Board Accounting, Human
Resources and Financial Management Plan and
Status Report 17
April 6, 2006
2
Table of Contents
  • Section Page
  • Working Group Updates
  • Financial Management Accounting 2
  • Human Resources 5
  • Procurement 8
  • Information Technology 11
  • Facilities Maintenance 19
  • Dispute Analysis and Forensics 23
  • Appendix A Detailed Workplans
  • Schedule A - Financial Management
    Accounting 29
  • Schedule B - Human Resources
    30
  • Schedule C - Procurement 33
  • Schedule D - Information Technology
    34
  • Schedule E Facilities Maintenance
    36

3
Financial Management Accounting
  • Post Katrina Key Accomplishments
  • Coordinated with insurance carriers to collect
    claims for hurricane damages. To date, 34.4M has
    been collected.
  • Community Disaster Loan application was approved
    with potential monies of approximately 20M.
  • Monitored daily cash receipts and disbursement
    transactions in each of the Districts bank
    accounts.
  • Developed preliminary projections of school and
    other operating expenses as well as anticipated
    revenue streams from federal, state and local
    governments.
  • Modified weekly cash flow forecasts for material
    changes caused by the post-hurricane environment.
    These cash flow forecasts indicate that, based
    on current assumptions, the Districts general
    fund will still have positive cash at the end of
    fiscal year 06 under the assumption that the
    District will not have to pay the approximate
    68M of unemployment benefits to the Louisiana
    Department of Labor until sometime in calendar
    year 07.
  • Obtained bond counsel opinion supporting the use
    of existing capital project funds to fund
    liquidity needs for the school building repair
    efforts.
  • Segregated pre-Katrina payables from post-Katrina
    liabilities for go-forward accounting purposes.
  • Supported payroll team in processing pre-Katrina
    payroll in an off-line system as a result of the
    damage to the District information systems as
    well as continued implementation of interim
    payroll processing solution with ADP.

4
Financial Management Accounting (cont.)
  • Post Katrina Key Accomplishments (cont.)
  • Payroll
  • Completed and transmitted over 10,000 Form W2s.
  • Completed and transmitted approximately 600 Form
    1099s.
  • Updated over 7,000 employee addresses.
  • Addressed over 4,000 calls to our call center,
    with issues ranging from multiple address
    changes, benefits and retirement questions, to
    payroll issues.
  • Developed and implemented a system of metrics to
    use in identifying root causes and action items
    for use with our call center operations.
  • Developing the ability to manage the payroll tax
    function within the payroll department rather
    than in the finance department.
  • Developing core competency within the payroll
    department to handle retirement reporting.  This
    function is typically handled by the
    retirement/benefits department.
  • Assisted the finance/accounting department in
    closing long standing, open, and un-reconciled
    issues.
  • Beginning the transition from ADP to the Munis
    payroll system.
  • Developing, and constantly revising payroll
    department quality and internal controls.
  • Prepared, and are constantly updating the
    upcoming vacation/sick payout process.  The
    payment and distribution process is settled and
    ready to go.  
  • With the assistance of the LLA, we have
    identified approximately 300 employees with
    questionable stipend and assault pay issues,
    which amounts will be offset against the
    vacation/sick payouts.
  • Developing processes to go after potential
    payroll, stipend, and assault pay overpayments.

5
Financial Management Accounting (cont.)
  • Key Deliverables to be Accomplished
  • Design, implement and permanently staff a
    scalable accounting/ finance department for a
    reconstituted OPSB system by December 2006.
  • Design a Treasury/Cash Management system that
    incorporates necessary controls to provide
    timely and reliable reporting capabilities.
  • Create a Special Revenue department with
    capabilities to develop, budget and timely
    process reimbursement claims while complying with
    all federal and state regulations.
  • Complete the termination process for all former
    employees including process final payout of
    sick/ vacation pay, prepare final W-2s and
    reconcile all associated withholdings.
  • Identify and record all unrecorded liabilities,
    compile and validate a complete accounts payable
    listing and process all valid claims for payment.
  • Design and implement Tyler/ MUNIS as a scalable
    and reliable financial reporting systems.
  • Develop alternatives to move toward a more
    optimal debt structure for the District,
    including potential refinancing/refunding options
    on 250M of existing indebtedness. Conclude a
    successful refinancing of all outstanding bond
    obligations.
  • Obtain/recover all available funds from insurance
    policies, Community Disaster Loan and other
    Federal Assistance. Complete validation and
    subsequent repayment of all outstanding
    pre-Katrina liabilities, including
    employee-related and vendor claims.

6
Human Resources
  • Post Katrina Key Accomplishments
  • General Employee Communications and HR Operations
  • Managed Call Center and HR related content on the
    NOPS Website to include updating call center
    scripts, FAQs, and responding to employees
    questions and requests.
  • Responded to walk-ins and processed employment
    verification requests, resignations, retirements,
    mortgage/auto loan requests, payroll questions,
    student records requests, benefits requests, etc.
  • Processing verifications of unemployment
    eligibility for the DOL.
  • Continue to approve/disapprove and process
    administrative employees brought back from
    disaster leave. Compile and maintain list of
    all employees/salaries (administration
    school-based).
  • Finalizing analysis and audit of final vacation
    payouts for terminated employees less any
    offsets. Researching stipend offsets
    payments over 5,000 prior to any payment.
  • Executing on capacity building strategy, to
    include
  • Identified skill gaps and human capital needs
  • Drafting descriptions for identified position
    needs
  • Interviewed candidates for accounting/payroll
    functions, checked references, conducted
    compensation market analysis.
  • Developed recruiting status matrix (See
    Attachment).
  • Processed transferred sick balances to other
    School districts upon employees request.
    Transferred out and reduced OPSBs sick leave
    liability by over 46,000 hours.
  • Updated preliminary 2006 2007 OPSB organization
    charts and employee roll-off dates (See
    Attachment).
  • Beginning implementation of Tyler-Munis
    HR/Payroll module.
  • Contacted and hired permanent temporary at
    will employees, as required.
  • Supporting finance with the preliminary
    development of a 2006-2007 budget for
    administration and school-based employees.
  • Continue to supporting school-based staffing
    needs.
  • Continue to support finance cash flow forecasts
    (i.e., payroll costs, benefit expenses,
    unemployment benefit projections, workers
    compensation costs, sick/vacation balances).

7
Human Resources (cont.)
  • Post Katrina Key Accomplishments
  • Retirement/Benefits
  • Began drafting healthcare RFP.
  • Continued to administer the Self-Insured
    Healthcare plan. Auditing account for claims
    paid through March 29, 2006.
  • Completed the transfer of data to the COBRA and
    Retiree direct billing vendor. COBRA elections
    and notifications, as well as Retiree invoices
    will by mailed to participants by March 31, 2006.
  • Reviewing Coventry invoice for claims prior to
    the February 1st self-funded plan, including the
    reconciliation of the December January COBRA
    participants to the payments received by FBMC.
  • Received and recorded payments received in the
    OPSB Healthcare P.O. Box from Retirees and
    COBRA participants for February. Also recorded
    cancellation notices from Retirees who are
    switching from the district plan to another
    provider.
  • Finalized the mediated Settlement Agreement with
    Coventry regarding increased Retiree monthly
    premiums.
  • Provided updated census information to the
    Dental, Life and Vision providers for valuation
    purposes.
  • Responded to requests for information from
    various state agencies (TRSL, LSERS, LDI, etc.)
  • Approved the release of payments for March
    Workers Compensation payments and the 1st Quarter
    Retiree Life Insurance Payments.
  • Developed cost analysis to move OPSB retirees to
    the Office of Group Benefits state plan (see
    Attachment).

8
Human Resources (cont.)
  • Key Deliverables to be Accomplished / Next two
    weeks
  • General Employee Communications and HR Operations
  • Continue to oversee OPSB in-house call center
    website to include updating call center scripts
    and website FAQs and responding to researching
    employees questions and requests.
  • Continue to respond to walk-ins and process OPSB
    employment verification requests, resignations,
    retirements, mortgage/auto loan requests, payroll
    questions, student records requests, benefits
    requests, etc.
  • Continue to process verifications of unemployment
    eligibility for the DOL
  • Continue to audit and verify stipend
    overpayments prior to any distribution.
  • Update 2006-07 organizational charts and the plan
    for the estimated release dates for OPSB
    employees.
  • Capacity Building Continue to develop job
    descriptions, source, screen and interview
    candidates to fill capacity gaps.
  • Continue to approved/disapprove and process
    employees brought back from disaster leave.
  • Continue to process and transfer sick leave hours
    upon employees request.
  • Finalize review and update of HR policies and
    practices.
  • Provide finance with HR expenses to include
    health insurance claims paid for last two years,
    a SAS 70 report on the internal controls of the
    TPA, and preparing a schedule of all employer
    retirement contributions by month for all plans.
  • Finalize PIP payment reports (OPSB Type 4
    Charters).
  • Finalize HR reports for financial Audit including
    retirement and benefit information.
  • Continue to provide staffing support and
    employment processing to schools and central
    administration.
  • Continue to coordinate donor relation activities
    and distribution of donated items.
  • Continue to support the budgeting process (i.e.,
    headcount, payroll/benefit costs)
  • Retirement/Benefits
  • Finalize and post/disseminate healthcare RFP.

9
Procurement
  • Post Katrina Key Accomplishments
  • Arranged/Coordinated tours of the Council for the
    Great City Schools at various school
    facility/properties.
  • Worked with Facilities to properly procure
    emergency repairs on nearly all NOPS schools.
  • Developed and maintained an interim, manual,
    non-Oracle based Requisition and Purchasing
    process.
  • Drafted, distributed, received and awarded RFPs
    related to the following services
  • General Contracting Parsons
  • Environmental Parsons
  • HVAC Johnson Controls
  • Custodial and Grounds Sodexho
  • Assisted the IT department in the recovery of IT
    assets from 3510 General DeGualle.
  • Assisted in the drafting and distribution of RFPs
    for Transportation Services.
  • Assisted in the drafting and distribution of RFPs
    for Food Services.
  • Assisted in the drafting and distribution of an
    RFP for Security Services.
  • Assisted in the drafting and distribution of a
    bid package for the sale of land.
  • Assisted in the drafting and distribution of an
    RFP for an E-rate Service Provider
  • Discussed proposals related to waste/trash
    removal and pest control with a few vendors.
  • Maintained interim contract management system.

10
Procurement (cont.)
  • Post Katrina Key Accomplishments (cont.)
  • Worked with Real Estate group to procure services
    and coordinate moves from Henderson Elementary to
    McDonogh 7, then from McDonogh 7 to Arthur Ashe
    Elementary.
  • Work with OPSB General Counsel to terminate
    copier/printer leases with Xerox. Replaced with
    Imagistics copier/printer leases to support NOPS
    sites (Franklin Elementary, McMain H.S., McDonogh
    35, Ashe, Bauduit) pursuant to state contract
    rates. Agreement runs through June 30, 2006 at
    which point it will be up to OPSB discretion to
    renew or put out to public bid.
  • Installed agreement with Allied Waste to provide
    waste removal services at current NOPS sites
    (Franklin Elementary, McMain H.S., McDonogh 35,
    Ashe, Bauduit). Agreement runs through end of
    March, 2006. RFP for waste removal services
    advertised and distributed on February 14, 2006.
  • Released, per Emergency Procurement guidelines,
    RFPs for the repair and reconstruction of Bauduit
    Elementary, Gaudet Elementary (RSD), Ashe
    Elementary.
  • Released, per States Public Bid Policy, RFP for
    the repair and reconstruction of Easton Senior
    High School on February 17, 2006.
  • Preparing bid packages for Hynes Elementary as
    well as other schools identified by the RSD to
    open in August, 2006.
  • Attended the Mayors Contractor Seminar on
    February 22, 2005 at the Convention Center,
    whereby we made contact with over 100 local and
    regional construction firms. We handed out
    nearly 100 copies of the Easton RFP and informed
    contractors on how they may obtain information in
    the future on upcoming RFPs.

11
Procurement (cont.)
  • Key Deliverables to be Accomplished
  • Continue to exercise joint authority with OPSB,
    requiring written concurrence of both parties in
    matters of procurement, execution, amendment and
    termination of contracts.
  • Design and develop District procurement policies
    and procedures
  • Ensure consistency with state, local and federal
    laws and regulations.
  • Incorporate best practices from LDE, other
    districts, other states.
  • Codify processes and procedures including a
    written code of conduct for employees involved in
    purchasing and contracting on behalf of the
    District.
  • Codify areas of authority, delegation and ensure
    actions require proper authorization.
  • Work on all the above in concert with MUNIS
    implementation
  • Design and develop District policies and
    procedures involving the bidding process from
    informal bids (i.e. price verifications) to
    formal Request-for-Proposals.
  • Design and develop the District Contract
    Administration function.
  • Continued support of Real Estate Group with RFP
    process for construction projects.

12
Information Technology
  • Post Katrina Key Accomplishments
  • Oracle Operations
  • Submitted 2005 W2/1099 Electronic transmittal to
    IRS and SSA using Oracle System
  • Submitted 2005 W2 Employer File successfully
    uploaded to the SS Administration
  • 2005 LA L2 were successfully transmitted to the
    Department of Revenue State of Louisiana 
  • Prepared for master file update and termination
    of 7500 employees in Oracle System for audit and
    control purposes
  • Developed final scripts and completed data
    extract of employees from Oracle System for final
    termination Vacation/Sick payout file to ADP for
    processing and payment
  • Continued contract revisions with Oracle to
    implement reduction of monthly Oracle On-Demand
    contract by an estimated 20
  • Continued to manage production related business
    requests and issues related to Oracle LINUX
    conversion
  • Continued to revise and execute Oracle to MUNIS
    Transition plan and key milestones, including
    access to historical data
  • Tyler MUNIS Enterprise K-12 Design /
    Implementation project GL, AP, Procurement,
    Grants, and Budgeting
  • Finalized Finance roles responsibilities for
    NOPS
  • Completed additional training needs for key users
    in General Ledger, Accounts Payable, Purchasing
    and Requisitions applications
  • Conducted successful systems test for GL, AP,
    Procurement and Requisitions
  • Went Live on MUNIS GL, AP, Procurement and
    Requisitions 4/3

13
Information Technology (cont.)
  • Post Katrina Key Accomplishments (cont.)
  • Tyler MUNIS Enterprise K-12 Design /
    Implementation project Human Resources and
    Payroll
  • Delayed implementation of Phase 1 MUNIS
    Financials from 2/1 to 4/01, has delayed Phase 2
    of HR/Payroll systems implementation from April
    to May, 06
  • Completed visit with NOPS HR/Payroll/IT
    representatives to MUNIS development center in
    Portland, Maine, to expedite design and
    configuration of sub-systems
  • Continued to design and configure key HR and
    Payroll business processes for MUNIS
    implementation
  • Continued to define MUNIS security requirements
    to determine which employees, deductions, pay
    types and tables each user has access to view or
    modify
  • Continued to finalized enhanced business process
    outsourcing services with ADP, specifically
    focused on
  • Check Printing and Distribution
  • W2 Printing and Distribution
  • Tax Reporting and Filing
  • Garnishment Processing
  • Help Desk / PC Support RFP
  • Continued to initiate Help Desk / PC support
    outsourcing end user capability
  • Completed communication plan and process
    definition for the outsourced PC Support Help
    Desk capability
  • Continued to build NOPS IT customer service
    capacity

14
Information Technology (cont.)
  • Post Katrina Key Accomplishments (cont.)
  • IT Shared Services capability
  • Continued to meet with each school to finalize IT
    costs and budgeting
  • Issued final IT Shared Service center Endeavor
    Agreements to Charter and RSD schools
  • Continued to support on-going IT operations
  • Continued to build NOPS IT business capacity
  • Issued first quarter invoices to customers
  • Data Center Operations
  • Continued to expand Microsoft Exchange email
    service to specific charter schools requesting
    NOPS K12 email accounts
  • Continued to implement VOIP telephone capability
    at schools along with upgrades to the Cox Centrex
    system
  • Continued to document NOPS data center assets at
    Cox facility to support disaster recovery
    planning
  • Implemented initial off-site storage rotation
    with Iron Mountain
  • Summarize redundancy options
  • Student Information Systems
  • Continued to conduct on-site SASI training and
    operations support for all charter and NOPS
    schools in Orleans Parish, including SIS, Master
    Schedule, and Grading. Recovery schools have
    elected not to use SASI.
  • Implemented the technical support and training
    calendar for SASI technical software support
  • Begin enrollment of RSD schools opening April 17,
    2006
  • E-Rate Filing and Management

15
Information Technology (cont.)
  • Post Katrina Key Accomplishments (cont.)
  • E-Rate Filing and Management
  • Continued to follow up with the SLD on the status
    of the Year 8 (2005/2006) selective review until
    funding is approved
  • Prepare for E-Rate services and support RFP
  • IT Asset Inventory
  • Evaluated the potential storage facility for the
    transfer of valuable IT assets
  • Completed Best Buy PC deployment for media event
    in March

16
Information Technology (cont.)
  • Key Activities to be Accomplished
  • Oracle Operations
  • Complete termination of 7500 employees in Oracle
    System for audit and control purposes
  • Send final termination Vacation/Sick payout file
    to ADP for processing and payment
  • Continue contract revisions with Oracle to
    implement reduction of monthly Oracle On-Demand
    contract by an estimated 20
  • Continue to manage production related business
    requests and issues related to Oracle LINUX
    conversion
  • Continue to revise and execute Oracle to MUNIS
    Transition plan and key milestones, including
    access to historical data
  • Tyler MUNIS Enterprise K-12 Design /
    Implementation project GL, AP, Procurement,
    Grants, and Budgeting
  • Continue to monitor and train NOPS Finance and
    Accounting capacity building for Tyler MUNIS
    operations
  • Configure test Budget Grants applications
  • Complete user procedures for budget set up,
    grants set up closing the books
  • Define additional reports as needed
  • Finalize the design framework of the combined AFR
    and budget reporting for NOPS, Algiers and the
    other charter schools with the LDE LLA

17
Information Technology (cont.)
  • Key Activities to be Accomplished (cont.)
  • Tyler MUNIS Enterprise K-12 Design /
    Implementation project Human Resources and
    Payroll
  • Continue design, definition and configuration of
    key HR business processes for MUNIS design
  • Continue definition of MUNIS security
    requirements to determine which employees,
    deductions, pay types and tables each user has
    access to view or modify
  • Continue design, definition and configuration of
    key ADP business process outsourcing services
  • Continue to refine enhanced business process
    outsourcing services from ADP

18
Information Technology (cont.)
  • Key Activities to be Accomplished (cont.)
  • Help Desk / PC Support RFP
  • Fully deploy the Help Desk / PC support
    outsourcing end user capability
  • Continue to build NOPS IT customer service
    capacity
  • IT Shared Services capability
  • Finalize the IT Shared Service Center Endeavor
    Agreements to Charter and RSD schools
  • Continue to support on-going IT operations
  • Continue to build NOPS IT business capacity
  • Issue first quarter invoices to customers
  • Data Center Operations
  • Continue to expand Microsoft Exchange email
    service to specific charter schools requesting
    NOPS K12 email accounts
  • Continue to implement VOIP telephone capability
    at schools along with upgrades to the Cox Centrex
    system
  • Continue to document NOPS data center assets at
    Cox facility to support disaster recovery
    planning
  • Implement initial off-site storage rotation with
    Iron Mountain
  • Begin requirements discussion for
    server/application co-location that will support
    disaster recovery procedures.
  • Student Information Systems
  • Continue to conduct on-site SASI training and
    operations support for all charter and NOPS
    schools in Orleans Parish, including SIS, Master
    Schedule, and Grading. Recovery schools have
    elected not to use SASI.
  • Implement the technical support and training
    calendar for SASI technical software support

19
Information Technology (cont.)
  • Key Activities to be Accomplished (cont.)
  • IT Asset Inventory
  • Maintain PC distribution processes and school
    site surveys
  • Execute storage facility agreement for 2006
  • E-Rate Filing and Management
  • Continue to follow up with the SLD on the status
    of the Year 8 (2005/2006) selective review until
    funding is approved
  • Prepare for E-Rate services and support RFP

20
Facilities Maintenance
  • Key Accomplishments
  • McMain
  • Performed walk-through with new general
    contractor foreman. Installed doors and window in
    kitchen office. Re-installed warmers, ovens and
    sinks into McMain kitchen. Completed scraping and
    painting of kitchen area. Began installation of
    18 external doors. Performed walk-through of
    facility with Principal Frick.
  • Banneker
  • Handed over keys to Recovery School District on
    Monday, March 20th. Continued to make repairs,
    including Installation of tile in the cafeteria,
    East and West stairwell, room 313, teachers
    lounge and 2nd and 3rd floor foyers. Repairing 2
    lights on the outside of building. Installation
    of new curtain wall in West stairwell. Demolition
    and removal of walk-in freezer and 3 reach-in
    refrigerators. Performed pre-fire marshal
    walk-through review on Monday, March 20th.
    Outstanding items addressed prior to final fire
    marshal review, including 3 exit signs and
    install of 6 fire rated doors. Registration began
    at the school on March 29th.
  • Lusher
  • Developed plan for performing permanent roof
    repairs, including repairing clay tiles,
    replacing gutters and downspouts, covering up
    temporary vent repairs and installing roof
    hatches. Plan was communicated to Principal.
    Work began on Sunday, March 26th and will
    continue through April 12th (dependent on weather
    conditions). Provided FEMA PO with detailed
    documentation to support reimbursement.
  • Ben Franklin Elementary
  • Repaired roof issue over room 319 over the
    weekend (March 18th and 19th) to address problem
    prior to LEAP testing, which began on Monday,
    March 20th. Repaired schoolyard fence. All
    outstanding punch list items have been addressed.
    Although original air quality testing was
    negative, we followed the recommendations of the
    environmental company to scrape and further dry a
    wall in room 106. Addressed air conditioning
    issues associated with condensation build-up on
    pipes.
  • Capdau
  • Completed all punch list repairs at Capdau with
    the exception of some tile issues. Met with
    moisture consultant to better understand root
    cause of popping tile. Performed walk-through
    of Capdau with FEMA project officers on March
    27th.
  • Fischer
  • Opened the school on Thursday March 30th for the
    Algiers Charter.
  • McDonogh 15
  • Released RFP for hurricane related repairs. Bids
    are due on April 20.
  • Lafayette
  • Continuing with damage assessment.

21
Facilities Maintenance (cont.)
  • Key Accomplishments
  • Booker T. Washington
  • Damage assessment is scheduled to be complete on
    April 14, 2006.
  • Gentilly Terrace
  • Damage assessment is complete with the exception
    of eleven rooms that were inaccessible. Damage
    assessment of those eleven rooms is scheduled to
    be complete on March 31, 2006.
  • Martin Luther King
  • Damage assessment is continuing and scheduled to
    be complete on April 5, 2006.
  • Benjamin Franklin High School
  • Continue to make progress on first floor
    restoration. Case goods orders are being placed
    including lockers and built-in cabinetry. Roof
    repairs to the gymnasium and auditorium complexes
    are near completion. Gymnasium floor delivery is
    on schedule and will arrive on April 17. Floor
    preparations will commence a week prior to
    delivery. Preparations are being made to scrape
    and biocide paint Auditorium ceiling. Mechanical
    equipment (air handlers, water tank) on order.
  • McDonogh 35 High School
  • Continue to make progress on first floor
    restoration. First floor lockers and door order
    being placed. GC punch list / close out plan to
    be developed on March 30.
  • Wicker
  • Continue to make progress of general restoration.
    Structural assessment received awaiting
    contractor bids to address structural deficiency.
  • Tureaud
  • Progress continues for a April 10th opening
    (faculty only) general occupancy to be on April
    17th per the States request. Mold abatement
    complete included scraping and biocide painting.
    Interior painting to commence week of April 3rd.
    Electricity has been restored. Fire Marshal
    walkthrough pending.
  • Craig
  • Progress continues for April 10th occupancy
    (faculty) and general occupancy on April 17th.
    Floor tile replacement complete. Roof access area
    and roof compromise being remediated. Fire
    Marshal has approved the school for occupancy.
  • Clark
  • NOPS Board resolved to let contract on an
    emergency basis. GC award pending. School being
    prepared for an April 17 general occupancy.

22
Facilities Maintenance (cont.)
  • Key Accomplishments
  • Warren Easton
  • GC awarded to Construction Masters. Project
    kick-off pending. Debris Removal (White Goods)
    LVI Debris Removal progress continues.
  • Fortier
  • Remediation and general construction continue.
    Continued discussions with Lusher charter on
    additional renovation plans.
  • Johnson and Nelson
  • Detailed assessment completed and will be ready
    to go out for RFP on April 5.
  • Frances Gaudet Elementary School
  • Environmental remediation completed. Floor tile
    has been removed. Debris has been removed from
    the front of the school. Ceiling tile has been
    removed. Temporary power has been provided for
    the opening of the school. Met with Entergy and
    OPSB facilities personnel to discuss the options
    for establishing permanent power. Fire Marshal
    inspection at Frances Gaudet Elementary is
    scheduled for Friday March 31, 2006 at 1000
    scheduled to open on April 3, 2006. Floor tile
    will arrive Monday and will be installed after
    school early next week. Fences to be repaired and
    pool is to be cleaned.
  • Sarah T. Reed Senior High
  • Completed detailed assessment. Awaiting
    reassignment of a FEMA PO to Reed High School.
  • Village de Lest
  • Completed detailed assessment.
  • Various
  • Performed kitchen equipment assessments at Sophie
    B. Wright, McMain, Capdau, Green and Audobon.
  • Performed walk-through of Green with new FEMA
    project officer on March 27th.
  • Continued repairs on all West Bank schools.
  • Debris Removal progress continues for white
    goods.
  • Corp of Engineers continues to progress on
    external debris removal.

23
Facilities Maintenance
Facilities Maintenance (cont.)
  • Key Deliverables to be Accomplished
  • Perform Real Estate Construction and Repairs -
    CM/PM
  • Complete building assessments for 124 schools
  • Create RFPs, review bids, and award the winning
    bid
  • Monitor the progress of GC, Environ, HVAC, and
    Janitorial
  • Work with FEMA and DAF on Scope of Repairs
  • Develop a school readiness checklist to be used
    for each school
  • FEMA project work sheets, building assessments,
    and cost estimates
  • OPSB School Openings - FM
  • Develop custodial, grounds, and maintenance
    contracts
  • Obtain and maintain all facilities maintenance
    programs
  • NOPS Master Planning Strategic Planning
  • Master planning, community Development
  • RF AE firms, manage process
  • Surplus property transaction program
  • Create process program to identify and sell
    surplus land

24
Dispute Analysis and Forensics
  • Key Accomplishments
  • Continued to compile supporting documentation for
    property files
  • Created master list of properties that lists
    acquisition values, carrying values, and damage
    caused due to Katrina for each OPSB owned
    property.
  • Created list of surplus properties which will be
    eligible for sale in the coming months.
    Initiated research to determine any leases
    involving surplus properties.
  • Compiled complete documentation on 42 of 140 OPSB
    owned properties.
  • Continued historical cost property valuations.
  • Advanced insurance claims and inventory process
  • UBS (Insurance Adjusters) has assessed 140
    facilities.
  • AAA (Capital Asset Valuation) has inventoried 93
    facilities and has produced 8 asset reports.
  • Eighteen asset reports will be delivered by AAA
    on 3-31-06.
  • Stoner (Wind damage contents) has assessed 25
    wind damaged properties.
  • Continued to meet with FEMA and provide
    documentation to build Project Worksheets
  • Confirmed Project Worksheets for approximately
    4.8 million in reimbursements to date. Pressed
    FEMA to complete Project Worksheets on 22.2
    million in construction costs in which FEMA has
    all necessary documentation, but OPSB has
    received no Project Worksheet.
  • Worked with building contractors to reconcile
    contractor bidding/invoicing with FEMAs
    bidding/invoicing requirements to ensure maximum
    reimbursement for eligible reconstruction costs.
    Worked extensively with Parsons Construction and
    Satterfield Pontikes Construction to recreate
    invoice detail ensuring FEMA reimbursement for
    eligible construction costs.
  • Compiled, created, and refined school
    reconstruction (temporary and permanent repairs
    caused by Hurricane Katrina) documentation for
    submittal to FEMA.

25
Dispute Analysis and Forensics (cont.)
  • Key Accomplishments (cont.)
  • Advanced divesture of vehicles and managed
    vehicle inventory
  • Accepting bids from firms interested in acquiring
    the flood damaged vehicles located at the
    Almonaster (Central Services) facility.
  • Filed police reports for vehicles which have been
    stolen from OPSB facilities.
  • Obtained all titles on vehicles owned and leased
    by OPSB.
  • Converting all titles from original to salvage.
  • Auctioning buses on EBAY.
  • Collected additional 2 million in insurance
    proceeds.
  • Advanced flood insurance collections
  • Facilitated the collection of 5.5 million.
  • Expecting receipt of an additional 7.7 million.

26
Dispute Analysis and Forensics (cont.)
  • Key Deliverables to be Accomplished
  • Property
  • Investigate ownership of 150 properties with the
    Office of Conveyance
  • Document titles to those properties in which we
    have ownership
  • Research all Section 16 lands owned by District
    and royalty entitlements
  • Work with Real Estate in divesting of unnecessary
    properties
  • Ensure all FEMA PW worksheets are complete for
    properties owned
  • Work with Real Estate to declare certain
    properties for Alternative use for FEMA per
    direction of State and Board of Education
  • Vehicles
  • Establish number of vehicles owned, vin numbers
    and locations
  • Document ownership of vehicles
  • Determine which vehicles are damaged and which
    are salvageable
  • Find Titles and assign to inventory
  • Make recommendation for divestiture of vehicles
  • Identify those vehicles missing and file police
    reports
  • Negotiate with Insurance Carriers for payment
  • Ensure all FEMA PW worksheets are complete for
    vehicles owned and damaged
  • Asset Inventory
  • Perform assessment of each District property and
    take detailed inventory of all assets

27
Dispute Analysis and Forensics (cont.)
  • Key Deliverables to be Accomplished
  • Contents FEMA claim
  • Perform assessment of cost to repair/replace
    contents of each District building.
  • File Documents for Project Worksheets for FEMA
  • Fixed Assets
  • Obtain and analyze a check register for the past
    four years
  • Recreate asset list based on check register
  • Reconcile with inventory
  • File Documents for Project Worksheets for FEMA
  • Temporary Classrooms
  • Coordinate placement of classrooms
  • Coordinate FFE for temp classrooms
  • File Documents for Project Worksheets for FEMA

28
Dispute Analysis and Forensics (cont.)
  • Key Deliverables to be Accomplished
  • FEMA Documentation
  • Manage all document request for FEMA and prepare
    documentation for OIG audit
  • File, document and classify all FEMA Project
    Worksheets and documentation
  • Utilize FTP site to streamline submission process
  • Loss Payees
  • Determine contractual obligations to loss payees
  • Coordinate with Loss Payees to retrieve equipment
    per contractual obligations
  • Negotiate and recommend settlements with Loss
    Payees
  • Insurance Company Claims
  • Prepare Proof of Loss for Insurance Companies
  • Coordinate inspections for all insurance
    adjusters and their representatives
  • Negotiate claim, manage claim efforts and
    document all repair work in compliance with the
    insurance claim
  • Expert witness testimony in the event litigation
    becomes necessary
  • Cash Reconciliation and Overall Recordkeeping
  • Prepare documentation to support inflows and
    outflows of cash
  • Prepare reports for State and Board of Education
    documenting uses of funds
  • Maintain data repository

29
Appendix
30
Schedule A Financial Management Accounting
31
Schedule B Human Resources
32
Schedule B Human Resources (cont.)
33
Schedule B Human Resources (cont.)
34
Schedule C Procurement
35
Schedule D - Information Technology
36
Schedule D - Information Technology (cont.)
37
Schedule E - Facilities Maintenance