How to Set Up a Construction Site Crane
2
  • Cranes are used in most major construction, since
    the development of the smallest houses in the
    largest skyscrapers. There is a wide range of
    crane sizes, and each crane should be handled by
    a qualified operator. Installation of the crane
    it must be carried out by those who are trained.
    Improper installation of the tap can lead to
    accidents that can be fatal.

3
  • Install mast section of tower crane concrete with
    steel anchors, making sure it is perfectly
    vertical using a level.
  • Add each mast section by means of bolts in the
    section below, we have not yet reached the
    required height. You will have other machines to
    it, such as lifting equipment scissors or
    telescopic boom.
  • Assemble the jobs (horizontal sections) of the
    crane, lifting them into place with another
    crane. It also needs to be placed on the mast
    steel bolts. You will have two jibs one that
    carries the chains, used for the lifting
    materials, and one that is used as a
    counterweight to prevent the crane from toppling
    over.

4
  • Crane load test 100 of capacity Once this
    happens, you can use a tower crane for the
    construction of your building.
  • If you want to views and buy cranes in myanmar,
    visits at baganmart.com, which is Myanmar B2B
    e-commerce platform and online shopping for
    Myanmar business products buyers.

5
Thanks For Watching
  • www.baganmart.com
  • www.facebook.com/Baganmart
Write a Comment
User Comments (0)