JustInTime Systems - PowerPoint PPT Presentation

About This Presentation
Title:

JustInTime Systems

Description:

Roots of JIT (Toyota Production System) Philosophical tenets of JIT ... Paperwork reduction in receiving and inspection. Westfield State College ... – PowerPoint PPT presentation

Number of Views:74
Avg rating:3.0/5.0
Slides: 20
Provided by: mehdikai
Learn more at: http://wwwbus.wsc.ma.edu
Category:

less

Transcript and Presenter's Notes

Title: JustInTime Systems


1
Just-In-Time Systems
  • Chapter 9

2
Outline
  • Philosophy of JIT
  • Elements of a JIT system
  • Stabilizing the Master Schedule
  • The Kanban System
  • Reducing Setup Time and Lot Sizes
  • Layout and Equipment
  • Effect on Workers
  • Suppliers
  • Implementation of JIT
  • Comparison of JIT and MRP
  • Beyond JIT to Time-Based Competition

3
Philosophy of JIT
  • Roots of JIT (Toyota Production System)
  • Philosophical tenets of JIT
  • Root of JIT in repetitive manufacturing

4
Elements of JIT
  • Small lot sizes
  • Use of Kanban system
  • Quick changeover
  • Multifunction workers
  • Efficient layout
  • Close relationship with supplier
  • Frequent delivery of supplies

5
Elements of JIT
6
Kanban System
  • A pull production system
  • A physical control system
  • Composed of cards and containers (production card
    and withdrawal card)
  • Number of containers

7
Kanban System
8
Kanban Cards
9
Reducing Setup Time and Lot Sizes
  • Reducing setup time
  • increases available capacity
  • increases flexibility
  • reduces inventory
  • Reducing setup times and run times simultaneously
  • Single-digit Setup Times

10
JIT Layout
Final Assembly
Work Centers
Stockrooms
Supplier A
Supplier B
Initial Layout
11
JIT Layout
Final Assembly
Supplier A
Supplier B
JIT Layout
12
JIT Layout
Final Assembly
Line 1
Line 2
Supplier A
Supplier B
JIT Layout with GT
13
Effect of JIT on Workers
  • Multifunction workers
  • Cross-training
  • New pay system to reflect skills variety
  • Teamwork
  • Suggestion system

14
Suppliers
  • Very close relationship with suppliers
  • Frequent deliveries demanded from suppliers
  • Sole-sourcing
  • Integrated supplier program

15
Features of Integrated Supplier Programs
  • Early supplier selection
  • Family of part sourcing
  • Long-term relationship
  • Cost-analysis-based price negotiations
  • Paperwork reduction in receiving and inspection

16
Implementation of JIT
  • Obtain commitment from top management
  • Gain the cooperation of workforce
  • Start with final assembly line
  • Reduce setup times and lot sizes working backward
    from the final assembly line
  • Balance fabrication rates with final assembly
    production rates
  • Extend JIT to the suppliers

17
Comparison of MRP and JIT
  • Pull versus Push production systems
  • Situations for comparing MRP and JIT
  • Pure repetitive manufacturing situation
  • A batch process
  • A job shop

18
Uses of MRP and JIT
19
Time-Based Competition (TBC)
  • Basic idea Compete on time, as well as quality,
    flexibility, and cost.
  • Use of technology (CAD, CAE, CAM) in TBC
  • Extending JIT beyond the factory floor (to sales,
    finance, accounting, etc.)
  • Application of TBC in the service sector
Write a Comment
User Comments (0)
About PowerShow.com