Cost Improvement Program Fire Hydrant O - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Cost Improvement Program Fire Hydrant O

Description:

Daily notification of operation and maintenance along with location. ... Mini Pickups VS hydrant trucks. Stay task oriented. COST CUTTING. Eliminate Area Jumping ... – PowerPoint PPT presentation

Number of Views:127
Avg rating:3.0/5.0
Slides: 16
Provided by: monica75
Category:

less

Transcript and Presenter's Notes

Title: Cost Improvement Program Fire Hydrant O


1
Cost Improvement Program Fire Hydrant OM
  • Presented by
  • Charles Haight

2
Purpose of COA OM is . . .
  • To insure readiness of hydrants for emergency
    service.
  • Maintain high quality and aesthetic water in the
    distribution system.

3
COA Hydrant Program
  • The COA Hydrant Program Qualities are enforced by
  • Operating all 8457 COA hydrants twice a year.
  • These two yearly operations are referred to as
  • Maintenance Operation
  • Flushing Operation

4
Maintenance Operation
  • The Maintenance Operation consists of . .
  • 1) Hydrant Cap Operation
  • 2) Effort to operate hydrant

5
Maintenance Operation
  • 3) Flush is permitted until water is
    aesthetically clean. Shut off and observe
    draining.
  • 4) Hydrant caps replaced
  • 5) Check hydrant lubrication levels and grease
    if necessary

6
Flushing Operation
  • The Flushing Operation consists of . . .
  • 1) Check for ease of hydrant operation
  • 2) Flush until the water is aesthetically clean

7
Privatization
  • By council direction the Utilities Department
    selected to out source (privatize) 1/2 of all
    hydrant operation and maintenance.

8
Assembled Scope of Service
  • Assembled scope of service to include
  • Maintenance and flushing of 4613 hydrants
  • Paint 1450 hydrants
  • Receive bid on all hydrant repair costs

9
Assembled Scope Of Service
  • Detail of procedures COA desires to have
    contractors follow
  • Daily notification of operation and maintenance
    along with location.
  • Emergency phone numbers to call
  • Supply 2 map books with list of hydrants to be
    maintained.

10
BID PRICE
  • Bid price per hydrant was 19.00
  • COA cost (to include maintenance, 1996 cost) was
    23.12

OUCH! WOW!
11
COST CUTTING
  • Cut Costs BY
  • Employee selection
  • Temporary employees
  • Mini Pickups VS hydrant trucks
  • Stay task oriented

12
COST CUTTING
  • Eliminate Area Jumping
  • Recycle hydrant parts
  • Develop personnel initiative
  • Develop a simple task oriented complimentary
    database

13
City of Auroraeffective efficient
  • COA and the contractors continually shared
    information.
  • The contractors came back to COA several times
    trying to bid within a range that was comparable.
    They failed to do so. They could not match our
    costs.
  • There was also an increase in efficiency.

14
Hydrant Service Repair Cost2001 Database Report
  • Average cost per hydrant
  • Contractor
  • Service 11.83
  • Flush 7.75
  • Paint 18.59
  • Total 11.05
  • COA
  • Service 4.57
  • Flush 32.39
  • Paint 22.25
  • Total 5.10
  • Repair 14.79
  • Total 9.26
  • City of Aurora is still below contractor bid
    including repair costs

15
RESULTS
  • Results were
  • Contractor cannot compete - profit index of bid
  • Developed pride in the employee efforts