City of Tucson Major Transit Investment Study
Arizona Transit Association Conference April 1,
2008
2
Why Is This Project Being Considered?
  • Connect major activity centers
  • Create economic development
  • Support population and employment growth
  • Improve transit service
  • Support Downtown and UA growth and development
  • Mitigate parking constraints
  • Preserve neighborhoods

3
Project Development Process
  • Alternatives Analysis
  • Locally Preferred Alternative
  • Circulate Draft EA
  • Small Starts Documentation
  • Final EA / FONSI
  • Project Development Approval
  • Advanced Design
  • Construction Grant Agreement
  • Construction
  • Operation

4
What is Modern Streetcar?
  • Fixed-guideway electric rail system
  • Operates in mixed traffic
  • Articulated for tight radii turns
  • Compatible with on-street parking
  • Shares lanes and stops with buses and bicycles
  • Safe in high pedestrian areas
  • Low floor with multiple doors
  • Can share track with historic trolley
  • Approximately 130 passengers/vehicle (35 seated /
    95 standing)

5
Operates Safely in Mixed Environments
  • Operates safely in pedestrian zones
  • Compatible with on-street parking
  • Shares transit stops with buses

6
Modern Streetcar Design Philosophy
  • Keep it simple and inexpensive
  • Use off the shelf equipment
  • Avoid utilities
  • Minimize street capacity impacts
  • Minimize loss of on-street parking
  • Design for ease of construction
  • Blend with urban environment and neighborhoods
  • Provided user-friendly service

7
Modern Streetcar Adopted as the Locally
Preferred Alternative (LPA)
  • Unanimous approval from the City of Tucson Mayor
    and Council on April 4, 2007
  • Local funding approved as part of the Regional
    Transportation Authority (RTA) Plan vote on May
    16, 2006
  • LPA alignment operates from University of Arizona
    to Downtown Tucson

8
(No Transcript)
9
Project Details
  • Alignment length 4 miles
  • 19 stations
  • 7 modern streetcars
  • Peak/off-peak headways 10/20 minutes
  • Ridership estimate from AA 3650 per
    weekday

10
Project Funding
  • Capital costs 145 million (YOE)
  • Some capital costs absorbed by other (e.g., 4th
    Ave Underpass)
  • RTA funding 88 million
  • Includes operating costs of 1 million annually
    starting in 2012
  • Small Starts funding
  • Will submit for a 50 percent federal share

11
Public Involvement
  • Technical Advisory Group (TAC)
  • Agency Stakeholders
  • Examples TDOT, Sun Tran, PAG, Pima County, UA,
    OPT
  • Community Liaison Group (CLG)
  • Community Stakeholders
  • Examples neighborhood associations, community
    groups, community leaders
  • Public Meetings
  • Multiple open houses at Historic Depot
  • Project Website - www.tucsontransitstudy.com

12
Project Schedule
  • Alternatives Analysis (AA)
  • May 2006
  • Locally Preferred Alternative (LPA)
  • April 2007
  • Draft Environmental Assessment (EA)
  • Sept 2007
  • Small Starts Submittal
  • Jan 2008
  • Begin Construction
  • Mar 2009
  • Operation
  • Dec 2011

13
(No Transcript)
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com