Title: Slide no.1
1Trinity College Universal Design IssuesAccess
Cobble Reduction
Access to Historic (Protected) Buildings
2Trinity College Universal Design IssuesAccess
Hide
Erase
3Trinity College Universal Design
IssuesTemporary/immediate solutions
Hide
Erase
House 39 Law School
Anatomy Building
4Trinity College Universal Design Issues
Permanent solutions Historic Buildings
Hide
Erase
Front Square Houses New access ramps
5Trinity College Universal Design IssuesPermanent
solutions - Historic Buildings
Hide
Erase
House 27
Entrance to Catex
6Trinity College Universal Design Issues
Permanent solutions Historic Buildings
Hide
Erase
The Old Library
The GMB (Sounder/beacon retrofitted)
7Trinity College Universal Design Issues
Permanent solutions Historic Buildings
Hide
Erase
Cobble Reduction
8Trinity College Universal Design IssuesPermanent
solutions - New Buildings
Hide
Erase
SNIAMS (automatic doors)
East End 4/5
9Trinity College Universal Design IssuesPermanent
solutions - New Buildings
Hide
Erase
Berkeley Podium (ramp)
Ussher Podium (platform lift) Sounder/beacon
retrofitted)
10Trinity College Universal Design IssuesPermanent
solutions - Existing Buildings
Hide
Erase
Lecky Library (Arts Building)
11Trinity College Universal Design IssuesPermanent
solutions- New Buildings
Hide
Erase
Ussher/Berkeley Library (ramp and lift)
12Trinity College Universal Design IssuesGeneral
Facilities
Hide
Erase
UA Toilet
Desiginated Parking Bay
13Trinity College Universal Design IssuesPermanent
solutions- New Buildings
Hide
Erase
Ussher/Berkeley Library (ramp and lift)
14Trinity College Universal Design IssuesInterim
solutions
Hide
Erase
Portable Ramp
15Trinity College Universal Design IssuesGeneral
Requirements
- Mobility ease of access for all
- Hearing Induction loops, strobe alarms
- Vision Tactile clues, lighting, audible alarms
Hide
Erase
16Trinity College Universal Design IssuesCompleted
Projects Lecture Halls
- Accessible for all new buildings
- Note Access to lecture theatres in old buildings
to be considered.
Hide
Erase
17Trinity College Universal Design IssuesCompleted
Projects Goldsmith Hall Residences
- All units accessible by lift
- All units visitable and adaptable when
required. - Specifically designed bathrooms available.
Hide
Erase
18Trinity College Universal Design IssuesCompleted
Projects Botany Bay Residences
- Refurbishment
- Provision of 9 no places in 3 no. units
- Each unit is fully adapted to suit Universal
Design requirements - Including specifically designed kitchens and
bathrooms - In addition facilities can be provided for both
the visually impaired and deaf persons in the
remaining units.
Hide
Erase
19Trinity College Universal Design IssuesCurrent
Programs/Projects - Trinity Hall Residences
- Each of the three new buildings is fully
accessible - All apartments are 'visitable
- 45 of 938 bed spaces are enabled bed spaces with
specially designed toilet/shower facilities with
'nurse call' system centrally monitored and
enabled kitchen facilities. - Each apartment has an 1800 turning circle for
wheelchair access. - All switches, door furniture etc are universally
accessible-visibility socket switches fitted - Specifically designated parking bays
- Provision of facilities for both the visually
impaired and deaf occupants.
Hide
Erase
20Trinity College Universal Design IssuesPriority
List 1
- GMB internal lift
- The Pavilion Bar platform lift.
- East Theatre automate entrance door.
- Arts Building (Faculty Area) automate
doors/platform lift - Chemistry Building improve access to Large
Lecture Theatre. - Physiology/Zoology Building Access provision.
- The Boathouse provision of UA toilets
- Santry Pavilion provision of UA toilets/changing
room
Hide
Erase
21Trinity College Universal Design IssuesPriority
List - General
- Induction Loop System
- Deaf alerter Fire Alarms.
- Cobble reduction.
- Improve external/internal circulation routes
- Visual/tactile provisions.
Hide
Erase
22Trinity College Universal Design IssuesFor
Consideration
- Front Square Access provision/automate doors
- Provosts House Access provision.
- New Square Access provision/automate doors
- East End Improve access to existing buildings.
- Islandbridge improve access/lift installation/UD
facilities. - Santry Pavilion improve access/lift
installation/UD facilities.
Hide
Erase