Title: 61% caustic from Pre-concentrator enters the fina
1Presentation on Flaking Plant (Siel Chemical
Complex)Issues Related Problems
Presented By RAKTIM PALIT
2Siel Chemical Complex, Rajpura (Pb), (A unit of
Siel Limited. )
3Siel Chemical Complex, Rajpura, (A unit of Siel
Limited. )
- One of the oldest business house of India
(Formerly DCM Chemical Works) - Turn over Rs. 200 Crore of the unit
- Integrated Chemical complex, manufacturing wide
range of chemicals - State- of the - art technology to produce
Caustic soda, Bleaching powder and Chlorine - Unparalleled standard of commitment to quality
and customer satisfaction - Presence in international markets
4Products Manufactured
- Caustic Soda lye
- Caustic Soda flakes
- Liquid Chlorine
- Hydrochloric Acid
- Bleaching Powder
- Hydrogen
- Sodium Hypochlorite
5Production Capacity of Siel Chemical Complex
- Caustic Soda Lye 82500 TPA
- Caustic Soda Flakes 33000 TPA
- Chlorine 73095 TPA
- Hydrogen 2062 TPA
- HCl 66000 TPA
- Sodium Hypochlorite 23100 TPA
- Stable Bleaching Powder 18000 TPA
6Process Flow Diagram Of Plant
SODIUM HYPO CHLORITE
WAD
PLANT
RETURN BRINE
BRINE
SNIFF GAS
DECHLORINATION
SALT
CPW
PLANT
CHLORINE COOLING
CHLORINE
LIQUID CHLORINE
CHLORINE
PRIMARY
DRYING AND
STORAGE
BRINE
BOTTLING AND
AND SECONDARY
LIQIFICATION
COMPRESSION
SATURATION
DISPATCH
BRINE PURIFICATION
HYDROGEN
HCl
STORAGE
DM Water
HCl
PLANT
COOLING
DISPATCH
HCL
Plant
SCRUBBING AND
COMPRESSION
HYDROGEN GAS
TO BOILER
CHLORINE GAS
RAW WATER
47.5 CAUSTIC
E
CAUSTIC LYE
Cl
-
H
VAPORATOR
SODA DISPATCH
STORAGE
HOUSE
-
Na
OH
33 CAUSTIC LYE
FEED BRINE
CAUSTIC SODA
FLAKING PLANT
RECYCLE
FLAKES
DM WATER
CAUSTIC LYE/
STORAGE
28 CAUSTIC
MEMBRANE
SODA
SODIUM HYPO
CHLORITE
STABLE BLEACHING
LIME STONE
HYDRATED
CALCINATION
POWDER
CHLORINATION
PLUS FURNACE
AND
LIME
OIL
HYDRATION
7Flakes Production Year 2008
- Jan08 2141
- Feb08 949
- Mar08 1079
- Apr08 672
- May08 394
- Jun08 706
- Jul08 594
- Aug08 -
- Sep08 526
- Oct08 953
- Nov08 156
- Dec08 1189
8(No Transcript)
9PROCESS DESCRIPTION OF 100 TPD FLAKING PLANT
Bertram make
10(No Transcript)
11(No Transcript)
12PROCESS DESCRIPTION OF 100TPD FLAKING PLANT
- The 33 cell liquor is produced in Inos chloro
make monopolar membrane continuous process. The
concentration of 33 cell liquor is increased to
47.5 by vacuum evaporation method. This 47.5
concentrated caustic soda acts as input raw
material for flaking plant.
Cont
13PROCESS DESCRIPTION OF 100TPD FLAKING PLANT
- The concentration of 47.5 caustic soda lye is
increased to 99 by falling film evaporation
method. The hot 99 liquid caustic is converted
to solid flakes by cooling forming a layer over
the rolling flaker drum subsequent cutting the
layer to form flakes by sharp edged blade.
Cont
14PROCESS DESCRIPTION OF 100TPD FLAKING PLANT
- The evaporation of water from 47.5 lye to
convert it in to 99 takes place in two stages ie
at Pre-concentrator at Final concentrator. The
working of Pre-concentrator Final concentrator
is explained as given below.
15Preconcentrator
- The concentration of 47.5 lye is increased to
61 in this unit. The unit is kept under vacuum
(680mmof Hg). 47.5 lye enters the unit from the
top the hot vapours (from Final concentrator)
from the bottom, due to counter current flow heat
is exchanged which removes the moisture there by
increasing the concentration from 47.5 to 61.
16(No Transcript)
17Sugar Solution
- In order to prevent corrosion of the Nickel
equipment, a 5 sugar solution is daily produced
in sugar dissolving tank fed continuously to
the 61 caustic soda flow by means of dosing pump.
18Heat Transfer Salt System
- The high temperature heat transfer salt system
consists of a salt heater with a combustion air
pre-heater, to heat the molten salt (Eutectic
mixture of 53 KNO3, 40 NaNO2 7 NaNO3) which
is circulated through the system by a salt pump
mounted on salt tank.
SALT
19(No Transcript)
20Final Concentrator
- 61 caustic from Pre-concentrator enters the
final concentrator tube (8 in number) from the
top. The caustic is then made to flow uniformly
through out the surface of the tube by the help
of propeller. The heat carrying salt at 400C
enters from the bottom of this tubes in the shell
side due to counter flow the heat of salt
takes away
Cont
21Final Concentrator
- The water from 61 caustic the concentration
increases to 99.The hot water vapor thus
liberated in this unit is sent to
Pre-concentrator as mentioned above.
Technical
22(No Transcript)
23Major Problem Faced
24Flaker Drum Leakage
- The flaker drum leakage is chronic problem.
The leakage is normally arrested by means of
welding, but the crack developed does not get
rectified completely. The water seeping through
this leaky part causes formation of lump of
caustic, which further causes chocking of hopper.
25Frequent Damage of Blade
- It has been observed that the blade gets
deformed after approximate production 500-600T.
26Oil Air Ratio
- The performance of Eurotherm Controller for
setting oil air ratio is not satisfactory .
27SPM Level
- The SPM level runs on higher side showing
improper burning of fuel. Atomization is done
with steam but still the burning found not up to
the mark.
28Melting Point Of Salt
- The Melting point of salt increases despite
nitrogen blanket being maintained at a pressure
of 3.5 kg / cm2.
29Final Concentrator Tubes
It has been observed that the average life of
Final concentrator tube is around 4 to 5 years.
Technical know how for ways means of increasing
the life of tubes.
30THANK YOU