Title: DRAFT IRON


1
DRAFT IRON STEEL FOUNDRY MACT FACILITY
INSPECTIONS
  • 40 CFR PART 63, SUBPART EEEEE

2
Inspections at Effected Sources
  • Sources Metal Melting Furnaces, Scrap
    Pre-heaters, pouring areas, Mold and Core Making
    Lines, and mold and Core Coating Lines.
  • Capture and Collection Systems
  • Fugitive Emissions from Foundry Operations

3
Inspections at Effected Sources
  • Work Practice standards compliance
  • Scrap receiving, inspection and certification
  • Material transport
  • Excess materials handling
  • General M/R

4
Photos of Facilities
5
Typical Control Systems
  • Emission Capture Systems Ductwork, Dampers,
    Sensors and Hooding.
  • Control Devices Fabric Filters, Scrubbers,
    Electrostatic Precipitators, Cyclones, Condensers
    and Thermal Oxidizers.
  • Automatic ignition sources for mold shake-out
    vents

6
Typical Control Systems (Contd.)
  • Subpart EEEEE requires specific data and
    compliance calculations for each of the above
    control systems. O M plans for these systems
    are also required in the regulation.

7
Performance Testing
  • To be performed for all emission sources subject
    to an emission limit.
  • PM measurement using EPA Methods 1- 4 and either
    5, 5B, 5D, 5F, or 5I or 29 as applicable.
  • Method 25 for TGNMO (as Hexane) or 25A to measure
    TOC (as Hexane).

8
Performance Testing Contd.
  • Use of Method 18 to determine VOHAP.
  • Facilities using CO or VOC CEMS Demonstrate
    compliance by conducting CEMS performance
    evaluation.
  • Testing to be performed every 5 years.

9
Pre-Inspection Procedures
  • File Review
  • MACT Initial Notification Report
  • Initial Compliance Status Report
  • Performance Test Report
  • Continuing Compliance Report
  • Title V Reports
  • VOC/HAP reduction through NSPS/MACT
    implementation
  • Regulation Review
  • Equipment Checks

10
Facility File Review
  • Semi-Annual Reports
  • Control Equipment Removal Reports
  • Previous Inspection Reports
  • Enforcement Action
  • Complaints
  • Notice of Violations
  • Enforcement Action taken

11
Facility File Review Contd.
  • Variance history
  • Compliance test data
  • Equipment Malfunction reports
  • SSM Plan and any events
  • Permit to construct P/C and permit to operate P/O
  • Collection and control system design plan

12
Entry
  • Enter by public access route
  • Identify yourself, present your credentials
  • Ask to meet with the site representative

13
Pre-Inspection Meeting
  • Explain purpose of inspection and discuss any
    new rule changes
  • Answer questions that the source personnel may
    have
  • Identify any equipment to be used in the
    inspection

14
Pre-Inspection MeetingInformation
  • Verify facility information
  • Facility name, ownership
  • Facility address, telephone number
  • Facility contact name, telephone number
  • Discuss safety procedures

15
Pre-Inspection Meeting Information Contd.
  • Review Permit
  • Verify
  • that permit is current and posted
  • that permit is for correct equipment
  • that permit operating conditions are being met
  • date permit issued
  • Equipment capacity/throughput information

16
Pre-Inspection Meeting
  • Review permit specification from office to
    on-site
  • Emission limits to be met
  • Changes/modifications to permit conditions
  • Site-specific monitoring requirements

17
Pre-Inspection Meeting Contd.
  • Operational Logs
  • Historical emission records and self monitoring
    data available
  • Monitoring and calibration logbooks

18
On-site Physical Inspection
  • Collection and control equipment.
  • Comparison between source records and visual
    inspection.
  • Observation of leaks and maintenance
  • Photographic documentation.
  • Operation according to site specific collection
    system and design plan.

19
Post-Inspection Meeting
  • Note deficiencies related to physical inspection
    or document review.
  • Advise source representative of any additional
    concerns that you might have.
  • Request additional information for identified
    issues and copies of any needed relevant
    documents.

20
Inspection/Documentation Report
  • Each violation recorded
  • Recommendations for source test or engineering
    evaluation
  • Assessment of fugitive emissions and potential
    impacts

21
Additional Training Resources
  • http//www.gov/compliance
  • http//www.gov/oar/oaqps/eog
  • http//64.27.125.175/ - LADCO
  • Other Consortiums