Title: Kuranov V.V., Ustyugov A.V.
1New technologies for production of SOFC with
support electrolyte of increased conductivity.
- Kuranov V.V., Ustyugov A.V.
- Russian Federal Nuclear Center Academician
Zababakhin Research Institute of Technical
Physics (RFNC-VNIITF)
2 Brief results of ISTC Project 483
1. Applicability of nano-scale YSZ powder in SOFC
has been demonstrated 2. Basic technologies of
nano-scale YSZ powder production by chemical
technique and by laser ablation, pulsed magnetic
compaction and high-temperature synthesis 3.
Performance of fuel cells fabricated with
nano-scale YSZ powder was studied, power density
up to 0.56 mW/cm sq. has been achieved.
P,W
3Brief results of ISTC Project 1231
1. Basic technologies for tubular solid
electrolyte production by pulsed magnetic
compaction for nano-scale YSZ powder and single
SOFC with such electrolytes. 2. SOFC prototypes
have been fabricated and their performance was
tested 3. Power density 0.47 mW/cm sq. was
achieved at single cell prototypes.
4Brief results of ISTC Project 1231
5Tasks of proposed project
- Development of technology for production of
support electrolyte as a tube with preset
geometry by pulsed magnetic compaction technique. - Optimization of nano-scale YSZ powder production
technology - Set of research activities in powder composition
and synthesis mode optimization - SOFC fabrication from selected oxide compositions
- Testing and performance study of SOFC
6Expected results
- Project completion will allow
- Selection of optimum oxide composition for solid
electrolyte and its synthesis modes - Fabricate SOFC with specific power Pgt400
mW/cm2 - Upgrade technology and equipment for electrolyte
production in view of productivity rate increase - Perform feasibility study of electrolyte
production techniques in view of adaptation to
trial production.
7Project information
Title New technologies for SOFC production with
support electrolyte of increased
conductivity. Project manager Andrey Ustygov,
Head of group, Technology Diovision
VNIITF Participating institutions ac. E.I.
Zababakhin RFNC-VNIITF, Snezhinsk, IEP UrB RAS,
Yekaterinburg. Project duration 24 months Labor
effort 430 man-months Project cost 295,000