Title: Progress at AVA Technologies LLC
1Progress at AVA Technologies LLC
National CdTe Team Meeting April 5 and 6,
2005 Kurt L. Barth, Robert A. Enzenroth and W.
S. Sampath Materials Engineering Laboratory,
Colorado State University, Fort Collins,
Colorado and AVA Technologies LLC Fort Collins,
Colorado
22
AVA Technologies LLC
- I. AVA Technologies LLC
- Advance CdTe thin film PV manufacturing
- Since 1997, working with DOE since 3/2001
- Conflict of interest fully disclosed to CSU
- Principals Barth, Enzenroth and Sampath (equal
stake) -
33
Production Prototype Development
- DOE I I Project with AVA Tech
- System for semiconductor processing nominal 2
MW/yr. - Modules installed for beta testing
- Participants
- - Colorado State University Engineering is a
subcontractor - - NSC/Acheson is partner
- - CSU Facilities system engineering, beta
testing - K. Barth PI,
- (Sampath will discuss technical results in
"short presentations" )
By 2006 demonstrate nominal 2 MW/yr. prototype
production semiconductor processing system and
install modules for beta testing.
44
NSC Partnership
- I. NSC/Acheson
- Specialty electronic coatings electrode for our
PV devices supplied by Acheson Ind. part of
National Starch and Chemical (NSC) - NSC is the US subsidiary of the approx. 10
Billion/yr, ICI Group - Tremendous experience in polymers/coatings
technology - II. I and I partnership
- Provide 50 cost share
- Engineer and develop electrode application system
5Production Prototype Development
5
5
CdTe PV Module Processing Line Schematic (1)
Laser scribe and substrate cleaning (2)
Semiconductor fabrication (3) Laser scribe (4,
5) Back electrode application carbon and
Ni (6) Scribe of back electrode to provide
series interconnection (7) Lamination and
encapsulation
By end of I I project Steps 2,4 and 5 at a
nominal 2 MW/yr throughput, other processing
steps performed at lower throughput by outside
vendors
66
Completion Production Prototype
- Category 2 demonstrated the ability to scale
process. - only 1/3 vacuum chamber needed for full device
fab. - 2 process heads completed
77
7
Recent Advances on Production Prototype
Automated load locks
8Project Outline
8
I I Cat 3 Complete and operate full system,
demo 2 MW/yr potential
Beta testing at CSU Facilities, and Everitt
Companies locations
Based on progress to date, no difficulty is
anticipated in achieving successful completion of
I I project.