Title: Chiller Optimization Workshop September 18, 2003
1Chiller Optimization WorkshopSeptember 18, 2003
- Fran Boucher
- Senior Energy Engineer
2New England Territories
3Who is here today?
o
- Process / industrial
- Institutions
- Office and commercial space
- Up to 100 Tons
- 100 to 300 tons
- Over 300 tons
4Utility Conservation Programs
- Utilities provide
- Technical Assistance
- Incentive funds
- Customers pay of cost
5Utility Conservation Programs
- Types of Projects
- New construction
- New equipment loads
- Replacement for efficiency
- Replacement due to age
6Utility Conservation Programs
- NOT JUST CHILLERS
- Cooling towers
- Optimization controls
- Base load chiller
- Pumping
- Reducing load Lighting efficiency, etc.
- Eliminating inappropriate loads
7Utility Conservation Programs
- Inappropriate process chiller loads
- Air compressors
- Hydraulic pumps
- Process loads with high leaving water
temperature (70plus)
8Personal Care Products Manufacturer
Example 1
- Planned to add an additional 400 ton chiller
- Used load reduction through our program
- Avoided purchase of chiller
- Cut projected annual electric cost by 201,500!
- Utility incentive over 700k
- Payback as low as two years!
9Printed Circuit Board Manufacturer
Example 2
- Installed heat exchanger to pre-cool with city
water - Eliminated need for 25 ton chiller addition
- Shut chillers down all winter
- 37,000 Incentive
- 2 year payback
- Saved annual 26,900 dollars electricity costs
10Massachusetts Manufacturer
Example 3
- Inappropriate use of Chilled water
- Replaced 75 Hp water cooled air compressor. Now
air cooled - Compressor cooled with chiller
- Saved 15,800 per year on chiller operation
- Payback 2 years
11Incentive Programs
- Two paths for Chillers
- Prescriptive
- Simple, no engineering
- Fits chiller only projects
- Custom
- Engineering study required
- Explore complimentary ECMs
12Incentive Programs
- Two Custom Programs
- Retrofit (Energy Initiative)
- New Construction/ New Equipment / End of Life
(Design 2000plus)
13Incentive Program
- Retrofit (Energy Initiative)
- Pay 50 of FULL cost
- 2 year payback limit
- Examples
- Load reduction
- Inappropriate use
- Waterside economizer
- New controls
14Incentive Program
- New Facility/Equip. (Design 2000plus)
- Pay 75 of Incremental Cost
- 1.5 year payback limit
- Examples
- New / replacement chillers
- Beyond code improvements
- Variable pumping
- More efficient towers
- Optimization controls
15Incentive Program
- Technical Assistance
- Modeling key to optimize chiller
- TA Study for modeling
- Solid numbers for management
- Program Volume
- 25 to 30 chillers a year
16Comprehensive Chiller Program
17Comprehensive Chiller Program
- Premium Chiller Replacement Program
- Eligibility
- Replacement of 300 ton or larger chiller
- Three demand side measures
- All lighting upgraded
- Complete energy model
- Not for industrial refrigeration
- Reward 90 or 1 yr. payback
- Note Mix of incremental and full cost
18Hospital Opportunities
- 2 Comprehensive Chiller Projects in 2003
- Hospital A
- Lighting, EMS, misc. DX to CHW conversion
- 240,000 incentive
- 66,000 electric savings
- 1 yr. payback (incremental cost)
- Hospital B
- 750,000 Incentive
- lt 2 yr payback
19Comprehensive Chiller
- Case Study Plastics Manufacturer
- Situation
- Immediate need to replace 1 of 2 cooling towers
(Design 2000plus) - Plan to install free cooling for air
compressors (payback under 2 years) - Available incentives lt50,000
- Their budget 200,000
- Plan to replace 1 old 250 ton chiller 1 year
later
20Comprehensive Chiller
(Continued)
- Revised Approach
- Replaced 2 cooling towers
- Added waterside economizer to whole plant
- Replaced oversized CHW pumps
- Several VSDs 30 Hp. each
- EMS Chiller plant automation
- New 400 Ton chiller
21 Comprehensive Chiller
(Continued)
- Project cost 589,770
- Utility Incentive 393,081
- Customers cost 196,698
- Still under 200k budget!
- Electric Savings 87,372
- Simple Payback 2.3 years
- NO BRAINER!!!!!!!!!!!
22Light Commercial Case Study
- The Building (New Construction)
- 60,000 SF
- Light Commercial
- 5 days, 12 hours/day
- 250 ton peak load 277,000 Ton hours
- Customer Criteria
- Efficiency / value
- Redundancy preferred
23Chiller Options
(Continued)
- Air Cooled Code min. Non-qualifying
- Single water cooled screw Qualifying
- Two water cooled screws Qualifying
- Centrifugal Qualifying
- VSD centrifugal Qualifying
- All 270 tons except 3 with 2_at_ 135 tons
24Chiller Comparison Case Study
Cost is net cost compared to Air Cooled chiller
base case
25Case Study Wrap Up
- Modeling is the key to a good decision
- Your results likely different
- We assist with the modeling
- Single water cooled screw saves 5000 per year
and 1.5 year payback even without an incentive
program! - VSD economics improve with longer hours and
larger machines
26Energy Conservation Opportunities
- Favorable Opportunities
- Long hours multiple shifts and weekends
- Year-round chiller load
- Process and computer room loads
- Multiple chillers without automation controls
27Utility programs are your friend!
Thank you!
Fran Boucher, CEM 508-421-7299