Title: T14 Ranney Well Engineering Study


1
T14 Ranney Well Engineering Study
  • Client Eli Lilly and Company
  • Submitted by RBC Consulting
  • September 16, 2009

2
RBC Consulting
3
Project Description
  • Eli Lilly and Company
  • T14 Ranney Well
  • Primary water source
  • Problem
  • Differential Settlement
  • Formation of Cracks

4
Design Requirements
  • Failure Determination
  • Design Documentation
  • Design Alternatives/Solutions
  • Final Report
  • Written
  • Oral

5
Project Approach
  • Site Survey
  • Soil Borings
  • Failure Analysis
  • Geotechnical
  • Structural
  • Hydrologic
  • Design Alternatives/Recommendations

6
Site Survey
  • Performed on March 28, 2001
  • Topographic Map

7
Soil Borings
  • Taken December 26 - 29, 2000
  • Alt Witzig Engineering

8
Soil Borings (cont.)
  • Tests
  • Stnadard Penetration Tests (SPT) at 2.5 ft
    intervals
  • Atterburg Limits
  • Moisture Content
  • Density Determination
  • Unconfined Compressive Strength
  • Grain Size Analysis
  • Unified Soil Classification

9
Failure Analysis
10
Typical Ranney Well
11
Typical Ranney Well(profile)
  • Well Caisson serves as the primary foundation
  • Bearing below radial collection system

12
T-14 Ranney Well
  • Two foundations
  • Well Caisson
  • Chlorine Caisson
  • Bearing for chlorine caisson above radial
    collection system

13
T-14 Ranney Well (cont.)
  • Aquifer consists of thick layer of fine, poorly
    graded sand
  • From Grain Size Analysis - at 60 ft depth, 100
    passing No. 6 sieve

14
Failure of T-14 Ranney Well
  • Undermining causing settlement and unbalanced
    loading
  • Unbalanced loading creating shear stress
    evidence by cracking

15
Crack Pattern
16
Design Alternaives
  • Hydraulic Jack Support
  • Support through H-Piles
  • Compaction Grouting
  • Complete Separation
  • Joint Replacement/New Construction

17
Design Recommendation
  • Replace exposed section of pipe
  • Install flexible joints at each end of the pipe
  • Approximate cost 3200
  • Plan for the construction of a new water
    collection system

18
Conclusion
  • Project Description
  • Design Requirements
  • Project Approach
  • Failure Analysis
  • Design Alternatives
  • Design Recommendations
  • Questions?