EIP Update Report Quarter Four 2006 Progress Highlights - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

EIP Update Report Quarter Four 2006 Progress Highlights

Description:

... Report. Quarter Four 2006. Progress Highlights' Insert Image Here. EIP Update Q4 Status ... Monitoring is done by independent & NATA accredited consultants ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 8
Provided by: fredth
Category:

less

Transcript and Presenter's Notes

Title: EIP Update Report Quarter Four 2006 Progress Highlights


1
EIP Update Report Quarter Four 2006 Progress
Highlights
Insert Image Here
2
EIP Update Q4 Status
At end Q4 2006, 84 of the EIP action items have
been completed. Of the withdrawn items, 11 were
withdrawn pre July 2005 and three items were
withdrawn with CAP endorsement in November 2006.
3
EIP Q4 Progress Highlights
  • 2004 - 2006 EIP closed
  • Verification of the EIP items is the next step
  • Items in progress in old EIP are to be rolled
    into the new plan
  • New EIP development continues with solid progress
    being made

4
EIP Q4 Progress Highlights
  • Significant progress made on Water Master Plan
  • Condensate recovery complete and commissioned
  • Oil and salt process water separation completed
  • Segregated tankage for salt process water
    completed
  • Pilot trial for activated carbon treatment for
    removal of dissolved contaminants from salt
    process water
  • Installation of oil sump high level alarms and
    upgrade non-return valves completed

5
EIP Q4 Progress Highlights
  • Further progress has been made on groundwater
    with Stage Two of the groundwater remediation
    system commissioned in Q4
  • The groundwater remediation system
  • Operates continuously, and recovers groundwater
    (total fluids) from multiple extraction points
    across the foreshore area (in the vicinity of the
    salt water intake) and from the eastern boundary
    interception trench systems
  • Pumps groundwater to a dedicated plant (Stage
    Two) located within the refinery for recycling of
    recoverable hydrocarbons and treatment of
    dissolved phase impact
  • Measures and collects data to allow detailed
    analysis in preparation for future
    management/remediation actions

6
Ambient Monitoring Results
  • Ambient monitoring results for 2006 are on the
    website (www.shell.com.au/geelong)
  • Results demonstrate the refinerys continued
    environmental improvement
  • Monitoring is done by independent NATA
    accredited consultants
  • Results show that local industrial emissions had
    minimal impact on the air quality surrounding the
    Geelong refinery

7
Ambient Monitoring Results
  • In accordance with EPA licence requirements,
    Shell is required to monitor air outside the
    refinery for various substances including
    Particulate Matter (PM10), Sulphur Dioxide,
    Fluoride and Benzene
  • In 2006, all data recorded was below set
    criteria, except for days with high bushfire
    activity in parts of the State, which caused high
    particulate levels across the region