Title: The Technical Division


1
The Technical Division
  • Victor Yarba
  • 08 August 2006

2
Technical Division Mission
  • The research, development, design, fabrication or
    procurement, and testing of accelerator and
    detector components
  • Support the Accelerator Complex
  • Conduct Accelerator RD
  • ILC, HINS, LHC, LARP
  • Support Projects
  • CMS Muons, LHC Accelerator Project, Pierre Auger
  • Provide Lab-wide Services
  • Incoming inspection, material control,
    specialized machine shop
  • TD is 235 people accustomed to
  • Working on HEP RD
  • Responding to customer requirements
  • Preparing designs to be production ready,
    including integration w/ industry
  • delivering on accelerator projects for Fermilab
    and other HEP labs.

3
TD Organization
  • TD is a matrix organization
  • Departments are grouped by specific functional
    skills
  • Projects and Programs focus efforts to specific
    goals, using personnel from the departments
  • FY06 TD budget is 36.5M
  • 20M SWF (6M sources outside TD)
  • 16.5M MS (6.5M sources outside TD)

4
TD Personnel (FTE)
Oct 05 snapshot We have shifted FTEs from
support to scientific roles in the past 6 years
within the scope of the lab funding situation
TDs ability to support and track record of
performance on outside projects supports our
requests
5
FY06 TD Labor Plan (FTE)
Machine Shop (cost neutral) and LOA
ILC / 3.9GHz / RF Infrastructure now incorporated
in Project 18, Directorate fundingoutside
the Division
LHC and LARP are true outside projects
6
FY06 TD Labor Plan (SWF)
  • Red outside funding 8.4 of FY06 SWF
  • Green Project 18 21.8

TD base SWF for FY06
7
Goals of FY06 TD labor Plan
  • Goal 1st Priority is to provide needed
    resources to accomplish the Labs Run II goals
    (necessary repairs, spares, new devices for
    luminosity upgrades, studies related to machine
    performance)
  • Goal Meet project commitments to LHC Auger
  • Goal Meet ILC RD commitments to GDE and ramp
    up a serious ILC effort at FNAL
  • Goal Complete critical Proton Driver RD CD1
    docs
  • Goal Develop SCRF infrastructure per plan to
    GDE
  • Includes SCRF materials program support for
    Peoples Fellow
  • Goal HFM LARP Nb3Sn Magnet RD
  • Meet LARP commitments
  • Develop HFM infrastructure

Verbatim from Oct Budget review presentation
8
Future TD Efforts
  • Activity FY06 FY07 and
    beyond Comments
  • Run II flat flat?
    Extras will roll off
  • BTEV ended
    effort shifted to LARP,PD,ILC
  • LHC ends 1450
    ? 238 K of SWF in 06
  • LARP growth flat
    500K SWF in 05gt1379 in 06
  • HFM flat flat
    part of LARP agreement
  • Auger flat flat?
    (Auger North ?)
  • ILC/SCRF growth growth !
  • HINS growth flat

?
Big Areas of growth are in SCRF. The Division is
making substantial changes to respond to changing
priorities
9
Technical Division Openings
10
Conclusion
  • The Technical Division focuses on RD and
    prototyping of components and systems for future
    accelerators
  • Historically TD started as The Magnet Factory.
    We have grown and expanded our expertise as the
    needs of the lab and HEP have shifted.
  • TD personnel are shifted among projects upon
    completion and start of new projects
  • TD work does not overlap with the mission and
    skills of other Divisionsin fact, we look to
    collaborate wherever possible
  • TD hires new personnel when needs can not be met
    in house, or if a skill set does not exist in
    house
  • TD has an initial ILC FY07 request suggesting a
    ramp up of 30FTE, while none of our other
    efforts is expected to decrease
  • TD was reorganized last November to better focus
    on future SRF and Magnet work