INTEGRATED COASTAL ZONE MANAGEMENT IN THE MEDITERRANEAN - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

INTEGRATED COASTAL ZONE MANAGEMENT IN THE MEDITERRANEAN

Description:

Extensive MAP work on ICAM and ICZM through PAP/RAC ... Study 2002-2003 carried out and lead by PAP/RAC ( three possible options) ... – PowerPoint PPT presentation

Number of Views:195
Avg rating:3.0/5.0
Slides: 8
Provided by: marko48
Category:

less

Transcript and Presenter's Notes

Title: INTEGRATED COASTAL ZONE MANAGEMENT IN THE MEDITERRANEAN


1
INTEGRATED COASTAL ZONE MANAGEMENT IN THE
MEDITERRANEAN
2
  • MAIN ICZM Protocol MILESTONES
  • Extensive MAP work on ICAM and ICZM through
    PAP/RAC
  • Amendments to the Barcelona Convention in 1995
    extending its field of of application to coastal
    zones
  • 12th Ordinary Meeting of the CPs (Monaco,
    November 2001)Feasibility Study 2002-2003 carried
    out and lead by PAP/RAC ( three possible options)
  • 13th Ordinary Meeting of the CPs (November 2003)
  • Decision was taken to prepare a draft text of
    the ICZM Protocol
  • Broad consultation process started immediately
    after the 13th meeting of the CPs
  • ICAM Forum of Regional Stakeholders held in
    Cagliari 2004
  • A group of eminent legal and technical experts
    was established by PAP/RAC, led by Prof. Michel
    Prieur
  • A Consultative regional workshop in Oristano
    Sardignia in 2005 to consider the Draft text of
    the Protocol before its submission to the MAP
    focal points

3
  • MAIN ICZM Protocol MILESTONES II
  • 14th Ordinary Meeting of the CPs, Slovenia (Nov
    2005)
  • WG with a precise mandate to develop the draft
    Protocol on ICZM established
  • 5 Meetings of the WG took place in Split, Croatia
    and Lutraki, Greece during 2006-2007
  • Full consensus achieved on the text by almost all
    CPs
  • Clear guidance from the 14th meeting of the CPs
    in view of having a successful negotiation of the
    ICZM Protocol
  • 15th meeting of the CPs held in Almeria, January
    2008 approved the Protocol and recommended to the
    Conference of Plenipotentiaries held in Madrid on
    20- 21 January 2008 to adopt the Protocol
  • 15 CPs signed the Final Act while 14 CPs signed
    the Protocol

4
  • Main focus of the negotiation process
  • 1) While building on past experience the emphasis
    should be put on how to better achieve the
    implementability of the Protocol
  • 2) Need for enough flexibility due to the variety
    of coastal zone along the whole Mediterranean and
    specific situations of CPs
  • 3) The final text should be clear, operational
    and implementable
  • 4) Linkage elements throughout the whole text
  • a) application of the Ecosystem approach
  • b) The integration of sectorial policies
  • c) Appropriate governance
  • 5) The Protocol should demonstrate an added value
    compared to other legal instruments of MAP
  • 6) Consensual Protocol

5
  • ICZM PROTOCOL STRUCTURE
  • PART I GENERAL PROVISIONS
  • Part II ELEMENTS OF INTEGRATED COASTAL ZONE
    MANAGEMENT
  • Part III INSTRUMENTS FOR INTEGRATED COASTAL
    ZONE MANAGEMENT
  • Part IV RISKS AFFECTING THE COASTAL ZONE
  • PART V INTERNATIONAL COOPERATION
  • Part VI INSTITUTIONAL PROVISIONS
  • Part VII FINAL PROVISIONS

6
  • ADDED VALUE OF ICZM PROTOCOL
  • Substantially complete and further develop
    Article 4. 3. e of the Barcelona Convention on
    ICZM
  • b) Article 12 on Public Participation
  • c) New principles related to ICZM are added
  • d) Important objectives of MAP on ICZM became
    Protocol objectives ( but further developed and
    more advanced)
  • e) Governancee fully addressed
  • The draft text provides for the use of ( inter
    alia)
  • a) Ecosystem approach
  • b) SEA for policies, plans and programmes
  • c)Use of economic instruments
  • c) Inter-sectorial coordination and appropriate
    governance
  • d) Outcome oriented reporting related to Protocol
    Implementation

7
ADDED VALUE of ICZM PROTOCOL
  • Finally
  • The text of the ICZM protocol is
  • innovative
  • forward looking and proactive
  • comprehensive
  • Integrated
  • Ambitious but realistic and implementable
  • Synergy and cooperation
Write a Comment
User Comments (0)
About PowerShow.com